Sl.No | State Name | District Name | Cluster Name | Work Code | Work Name | Component Name | Sub Component Name | GP Name | Work Details Entered | Work Category | Status | View Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-1-4-30278 | PIPE LINE EXTENSION IN VARIOUS WARDS | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
2 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-10-134-31135 | COMPOUND WALL FOR MARARI MUSHROOM CULTURE CENTRE | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | GUARD WALL FOR FARM FIELD/ WATER BODIES FOR AGRI PUPORSE/ LIVE STOCK CENTRE | KANJIKUZHI | YES | TANGIBLE | Completed | |
3 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-10-138-31180 | DEEPENING AND SIDE PROTECTION OF KARIKKAL VADAKKU THODU FROM PUTHUKKADU CULVERT TOWARDS DOWNSTREAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
4 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-10-142-31510 | MARKETING CENTRE COMPLEX FOR KUDUMBASREE PRODUCTS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | MARKET FOR AGRI AND RELATED PRODUCE | KANJIKUZHI | YES | TANGIBLE | Completed | |
5 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-10-302-113285 | FARM TOURISUM INFORMATION CENTRE | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KANJIKUZHI | YES | TANGIBLE | Completed | |
6 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-10-302-31124 | AS CANAL RENNOVATION AND GEOTEXTILE LINING TO FACILITATE FISH FARMING AND BOX CULVERT CONSTRUCTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KANJIKUZHI | YES | TANGIBLE | Completed | |
7 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-10-302-31171 | CONSTRUCTION OF SIDE PROTECTION WALLS OF KALLUKULAM POND USING RR MASONRY | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KANJIKUZHI | YES | TANGIBLE | Completed | |
8 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-10-302-80385 | VARAKADI THODU ACROSS PANCHAYATH ROAD AT KANICHUKULANGARA PADASEKHARAM IN WARD 8 | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
9 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-10-302-80395 | KALATHIVEEDU KALASAGAR ROAD WARD16 | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KANJIKUZHI | YES | TANGIBLE | Completed | |
10 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-10-302-80402 | KUNNEL VATHARA AT WARD 4 | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KANJIKUZHI | YES | TANGIBLE | Completed | |
11 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-10-302-80407 | PANCHAYATH KUNJARAVELI ROAD AT WARD 9 | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KANJIKUZHI | YES | TANGIBLE | Completed | |
12 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-10-302-80412 | PUTHENPURACKAL THAMARACHAL AT WARD 11 | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KANJIKUZHI | YES | TANGIBLE | Completed | |
13 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-10-88-31119 | PETTY AND PARA PUMP SETS IN PADASEKHARAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | AGRICULTURE EQUIPMENT | KANJIKUZHI | YES | TANGIBLE | Completed | |
14 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-11-167-80466 | GOVTLP SCHOOL MARARIKKULAM | EDUCATION | CONSTRUCTION OF KITCHEN SHED IN SCHOOL | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
15 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-11-167-80489 | GOVT L P SCHOOL PERUNNERMANGALAM | EDUCATION | CONSTRUCTION OF KITCHEN SHED IN SCHOOL | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
16 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-11-171-31525 | RENOVATION OF PUTHANABALAM LPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KANJIKUZHI | YES | TANGIBLE | Completed | |
17 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-11-171-31527 | CONSTRUCTION OF NEW SCHOOL BUILDING DVHSS CHARAMANGALAM | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KANJIKUZHI | YES | TANGIBLE | Completed | |
18 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-11-171-80513 | RENOVATION OF AYAPANCHERY LPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KANJIKUZHI | YES | TANGIBLE | Completed | |
19 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-11-187-31526 | SMART CLASS ROOMS IN SNVG LPS CHERUVARANAN | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | KANJIKUZHI | YES | TANGIBLE | Completed | |
20 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-11-187-80516 | SMART CLASS ROOMS IN AYYAPANCHERY GOVT LPS | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | KANJIKUZHI | YES | TANGIBLE | Completed | |
21 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-11-187-80520 | SMART CLASS ROOMS IN GOVT LP SCHOOL POCLASSERY | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
22 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-11-187-80522 | SMART CLASS ROOMS IN GOVT LP SCHOOL MARARIKKULAM | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
23 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-11-187-80525 | SMART CLASS ROOMS IN GOVT LP SCHOOL PERUNEERMANGALAM | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
24 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-11-187-80526 | SMART CLASS ROOMS IN GOVT LP SCHOOL THIRUVIZHA | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
25 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-11-328-31529 | GIRL FRIENDLY TOILETS | EDUCATION | SANITARY PADS VENDING MACHINE | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
26 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-12-192-31517 | RENOVATION OF HOMEO AND AYURVEDA HOSPITALS | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | KANJIKUZHI | YES | TANGIBLE | Completed | |
27 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-12-192-31520 | CONSTRUCTION OF A HOMEO HOSPITAL | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
28 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-12-195-31518 | RENOVATION OF PHC BUILDINGS | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KANJIKUZHI | YES | TANGIBLE | Completed | |
29 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-12-195-31519 | CONSTRUCTION OF OP BLOCK IN PHC COMPOUND | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KANJIKUZHI | YES | TANGIBLE | Completed | |
30 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-12-195-31523 | RENOVATION OF PHC BUILDINGS | HEALTH | CONSTRUCTION/UPRADATION OF PHC | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
31 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-14-319-31538 | ADDITIONAL FACILITY TO PANCHAYAT OFFICE BUILDING | CITIZENS SERVICE CENTRES | INFRA FACILITIES OR DEVELOPMENT RELATED GRAM PANCHAYAT GOVERNMENT OR COMMUNITY BUILDING | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
32 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-16-332-31083 | CONSTRUCTION OF CREMATORIUM KANJIKUZHY | ENVIRONMENT | CREAMATORIUM | KANJIKUZHI | YES | TANGIBLE | Completed | |
33 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-18-236-31511 | BEAUTIFICATION AND LANDSCAPING OF AS CANAL FROM NH TOWARDS DOWNSTREAM | TOURISM PROMOTION | BEAUTIFICATION OF TOURISM SITES | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
34 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-18-236-31513 | SIDE PROTECTION OF CHETHI POZHI OF MARARIKULAM VALIYATHODU | TOURISM PROMOTION | BEAUTIFICATION OF TOURISM SITES | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
35 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-2-16-30295 | COMMUNITY TOILET COMPLEX IN MARARIKULAM NORTH MARKET | SANITATION | BUILDING OF COMMUNITY SANITARY COMPLEXES BATHING GHAT | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
36 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-2-17-30281 | CONSTRUCTION OF PUBLIC TOILETS | SANITATION | BUILDING OF PUBLIC TOILETS (BUS STOP/MARKET/ OTHER IDENTIFIED PLACES ETC.) | KANJIKUZHI | YES | TANGIBLE | Completed | |
37 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-3-25-30299 | COMPOST PIT AND SOAK PIT FOR INDIVIDUAL HH | SOLID AND LIQUID WASTE MANAGEMENT | CONSTRUCTION OF COMMUNITY SOAK/ VERMI COMPOST PITS | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
38 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-3-37-30300 | PLASTIC AND E WASTE MANAGEMENT UNIT AND PLASTIC SHEDDING UNIT | SOLID AND LIQUID WASTE MANAGEMENT | PLASTIC SHREDDING UNIT | KANJIKUZHI, MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
39 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-33-285-113271 | BABY FRIENDLY TOILETS IN ANGANWADI NO 31 IN WARD 11 | SOCIAL WELFARE | CONSTRUCTION/RENOVATION OF BUDS/PLAY SCHOOL | KANJIKUZHI | YES | TANGIBLE | Completed | |
40 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-33-285-113274 | BABY FRIENDLY TOILETS IN ANGANWADI NO 38 IN WARD 09 | SOCIAL WELFARE | CONSTRUCTION/RENOVATION OF BUDS/PLAY SCHOOL | KANJIKUZHI | YES | TANGIBLE | Completed | |
41 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-33-285-113275 | BABY FRIENDLY TOILETS IN ANGANWADI NO 45 IN WARD 05 | SOCIAL WELFARE | CONSTRUCTION/RENOVATION OF BUDS/PLAY SCHOOL | KANJIKUZHI | YES | TANGIBLE | Completed | |
42 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-33-285-31536 | NEW BUILDING CONSTRUCTION FOR BUDS SCHOOL | SOCIAL WELFARE | CONSTRUCTION/RENOVATION OF BUDS/PLAY SCHOOL | KANJIKUZHI | YES | TANGIBLE | Completed | |
43 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-33-289-31532 | BUILDING FOR ANGANWADY IN WARD 17 | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
44 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-33-289-80896 | BUILDING FOR ANGANWADY IN WARD 4 | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
45 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-33-289-80899 | BUILDING FOR ANGANWADY IN WARD 16 | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
46 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-4-46-80344 | PAVANATT COLONY THENAMPARAMP ROAD IN WARD 16 | ACCESS TO VILLAGE STREETS WITH DRAINS | VILLAGE DRAIN (ON GROUND/UNDER GROUND) CONSTRUCTION | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
47 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-4-46-80348 | UTTARAPALLI KULAKKATT ROAD IN WARD 8 | ACCESS TO VILLAGE STREETS WITH DRAINS | VILLAGE DRAIN (ON GROUND/UNDER GROUND) CONSTRUCTION | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
48 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-4-46-80352 | KARIKKATHARAKANIYAMVELI ROAD IN WARD 5 | ACCESS TO VILLAGE STREETS WITH DRAINS | VILLAGE DRAIN (ON GROUND/UNDER GROUND) CONSTRUCTION | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
49 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-4-46-80356 | PATHIKKOOTTAM PATTATHUVELI ROAD IN WARD 10 | ACCESS TO VILLAGE STREETS WITH DRAINS | VILLAGE DRAIN (ON GROUND/UNDER GROUND) CONSTRUCTION | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
50 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-4-46-80362 | THERUVIL KUNJAN VEED ROAD IN WARD 4 | ACCESS TO VILLAGE STREETS WITH DRAINS | VILLAGE DRAIN (ON GROUND/UNDER GROUND) CONSTRUCTION | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
51 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-4-46-80364 | CHENNAMVELI MOOPASERRY WARD 1 | ACCESS TO VILLAGE STREETS WITH DRAINS | VILLAGE DRAIN (ON GROUND/UNDER GROUND) CONSTRUCTION | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
52 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-5-48-30506 | EXTENTION OF STREET LINE CABLING AND STREET LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTRA VILLAGE STREET LIGHT | KANJIKUZHI | YES | TANGIBLE | Completed | |
53 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-5-49-30511 | EXTENTION OF STREET LINE CABLING AND STREET LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
54 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-5-53-113281 | STREET LINE EXTENSION IN VARIOUS WARDS | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KANJIKUZHI | YES | TANGIBLE | Completed | |
55 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-5-53-30508 | INSTALLATION OF LED BULBS 593 NOS | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KANJIKUZHI | YES | TANGIBLE | Completed | |
56 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-5-53-31020 | INSTALLATION OF SOLAR PANELS OVER ROOF TOPS OF VARIOUS GOVERNMENT INSTITUTIONS | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KANJIKUZHI | YES | TANGIBLE | Completed | |
57 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-5-53-31032 | INSTALLATION OF SOLAR PANELS AT GOVERNMENT INSTITUTIONS AT MARARIKULAM NORTH | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
58 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-113282 | FORMATION OF RURAL ROADS IN VARIOUS WARDS | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
59 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-30304 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
60 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-30313 | FORMATION OF RURAL ROADS | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
61 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80627 | PALLIKKAVALA PUTHENVELI WARD 1 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
62 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80628 | NJARUKKUVELI THYVELY TEMPLE ROAD WARD 01 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
63 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80635 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KANNEDATH PANEZHAM ROAD WARD 02 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
64 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80636 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF MADASSERY MANIYANTHARA ROAD WARD02 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
65 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80637 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF LUTHERAN THIVELI ROAD WARD02 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
66 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80638 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF MILL JUNCTION AKAMPALLY ROAD WARD03 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
67 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80639 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF SUBASH KATTIPARAMBU ROAD WARD03 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
68 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80641 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF ARANATTU PUTTENVELI ROAD WARD04 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
69 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80643 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF PALVELI KANNAMKULAM ROAD WARD04 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
70 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80645 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KUNEL VATHARA ROAD WARD04 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
71 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80646 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF COIR SOCIETY DC MILL ROAD WARD05 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
72 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80648 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF MOOKKATHARA KUNNEL ROAD WARD 05 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
73 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80650 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF PUTHANAMBALAM KODUVEEDU ROAD WARD6 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
74 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80652 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF MUKKUDIKKAL KALAVELI ROAD WARD06 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
75 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80654 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KATTUKADA PUZHIKKAL ROAD WARD06 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
76 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80656 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KRISHI BHAVAN KAKKANAD ROAD WARD07 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
77 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80658 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KOOTTUVELI KALAVELI ROAD WARD 7 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
78 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80660 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF YAKSHIYAMBALAM DEVASWAM CHIRA ROAD WARD07 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
79 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80661 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KALATHIVEDU MUTHARAMAMAN ROAD WARD08 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
80 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80663 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF MUKKUDICKAL CHANIVELI ROAD WARD08 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
81 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80665 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KUTTEZHATHU PUTHENVELI ROAD WARD08 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
82 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80667 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF THOPPIL KUTTAN CHAAL ROAD WARD09 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
83 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80672 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF PUTHENPURAKKAL KOCHUVELI ROAD WARD 09 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
84 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80674 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KUNJARAVELI ROAD WARD 9 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
85 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80676 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF PUTHENPURAKKAL KOCHUVELI ROAD WARD 09 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
86 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80679 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF ATTUPURAM KUNNUMPURAM ROAD WARD10 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
87 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80681 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF URALI GURU MANDIRAM ROAD WARD 10 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
88 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80684 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KONNAMVELI VELLAPARAMBU ROAD WARD10 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
89 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80686 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF TAMARACHAL PUTHENPURA ROAD WARD 11 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
90 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80689 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KOLIKULAM PERERVELI ROAD WARD11 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
91 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80691 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF ADIPARAMBU PULICHUVADU ROAD WARD11 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
92 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80693 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KRISHNA PILLAI SMARAKAM KUNNEL ROAD WARD 11 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
93 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80696 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF RAUDIMUKK CAROT ROAD WARD12 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
94 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80697 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF ALAPPATT MOUTHI VELLA ROAD WARD12 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
95 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80700 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF SN PURAM VIRUTHELIVELI ROAD WARD12 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
96 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80702 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF THALAYADI KUNNEL CHIRA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
97 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80704 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF CHENNAVELI AYURVEDA NURSERY ROAD WARD13 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
98 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80707 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF CHENNAMVELI PATTARA ROAD W 13 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
99 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80710 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF PONNITTASSERY MATTAPPATTU ROAD WARD 13 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
100 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80713 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF NEDUMGATTU KATTAYIL ROAD WARD 14 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
101 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80717 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KATUVELIKKAKOM MATTAPPATTU ROAD WARD14 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
102 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80718 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF CHAKKALI SHAKTIPURAM ROAD WARD14 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
103 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80721 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF SHAKTHIPURAM THATTUPURACKAL ROAD14 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
104 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80722 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KATTAYIL NAVAVEETHI ROAD WARD14 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
105 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80724 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF PUTHUMANA KARIKUZHI ROAD WARD15 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
106 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80726 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF AYIRAMTHAI KUMARAPURAM ROAD WARD 15 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
107 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80729 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KALATHIVEEDU KALASAGAR ROAD WARD16 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
108 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80731 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF ULAHATTATI DWARAKA ROAD WARD16 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
109 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80736 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KUTTEKKATTU KOMACHAM VELI ROAD WARD16 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
110 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80738 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KALASAGAR CHALUNGAL ROAD WARD17 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
111 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80740 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KALASAGAR CHALUNGAL ROAD WARD17 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
112 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80741 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KUNNUMPURAM DCM ROAD WARD 17 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
113 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80742 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KUDILINKAL COLONY SASTHA TEMPLE PUTHENVELI ROAD WARD18 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
114 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80744 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KAKKANADU THENAMTHARA ROAD WARD 18 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
115 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80746 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF KAKKANADU THENAMTHARA ROAD WARD 18 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
116 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80749 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF SASTHAKHETRAMKUDILUNKAL COLONY WARD 18 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
117 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80751 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF LIBRARY THAMBAMVELI WARD 7 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
118 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80754 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAYMENT OF MOOKAMTHARAKANJIRAM PARAMB ROAD WARD 5 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KANJIKUZHI | YES | TANGIBLE | Completed | |
119 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80811 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF BEACH ROAD TO MUPASERRY ROAD IN WARD 1 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
120 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80816 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF MAVUNKAL KUTTAPANAKKAL ROAD IN WARD 2 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
121 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80817 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF PUTHENPURA KULAKKAD ROAD IN WARD 6 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
122 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80819 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF KRISHIBHAVAN KUTTIKATTU ROAD IN WARD 6 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
123 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80820 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF KOMALAPARAMP THURUTHEL MADAM ROAD IN WARD 7 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
124 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80822 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF GANAPATHIKAL KADAMATT ROAD IN WARD 7 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
125 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80824 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF NH VARAKADI ROAD W 8 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
126 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80828 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF CASHEW FACTORY KALARIKKAL ROAD IN WARD 11 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
127 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80830 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF RANGAKALA KAMBIAKATHU ROAD W 12 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
128 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80831 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF PATTUKULANGARA TOTTUCHIRA ROAD W 12 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
129 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80834 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF KUNJAMPILLA SMARAKAM PARAMPUVELI ROAD IN WARD 13 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
130 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80836 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF VALAYIL NANDIPURAM ROAD IN WARD 15 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
131 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80837 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF MAPILA PARAMBU ROAD W 15 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
132 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80838 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF MADATHANI VALIYATHIL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
133 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80839 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF CHANI COLONYSTORE JUNCTION ROAD IN WARD 17 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
134 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-6-59-80840 | FORMATION OF WEARING AND BASE COURSE LAYERS OVER THE EXISTING SUBGRADE OF THE ROAD PAVEMENT OF KALLUMAKKU BEACH ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
135 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-9-340-81413 | MICRO ENTERPRISES UNIT FOR KUDUMBASREE AND SHGS EVEN MANAGEMENT UNIT | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT FOR SHGS OR FARMERS GROUPS OR OTHER GROUPS | KANJIKUZHI | YES | INTANGIBLE | Completed | |
136 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-9-340-81414 | MICRO ENTERPRISES UNIT FOR KUDUMBASREE AND SHGS MEGA BAKERY UNIT | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT FOR SHGS OR FARMERS GROUPS OR OTHER GROUPS | KANJIKUZHI | YES | TANGIBLE | Completed | |
137 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-9-81-31105 | CONSTRUCTION OF COIR RATT UNIT IN WARD 10 | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | KANJIKUZHI | YES | TANGIBLE | Completed | |
138 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-9-81-31111 | CONSTRUCTION OF HITECH CONFERENCE HALL | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | MARARIKKULAM NORTH | YES | TANGIBLE | Completed | |
139 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-9-81-82019 | CONSTRUCTION OF COIR RATT UNIT IN WARD 11 | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | KANJIKUZHI | YES | TANGIBLE | Completed | |
140 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-9-81-82023 | CONSTRUCTION OF COIR RATT UNIT IN WARD 12 | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | KANJIKUZHI | YES | TANGIBLE | Completed | |
141 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-9-81-82030 | CONSTRUCTION OF COIR RATT UNIT IN WARD 13 | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | KANJIKUZHI | YES | TANGIBLE | Completed | |
142 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-9-81-82036 | CONSTRUCTION OF AISWARYA COIR RATT UNIT IN WARD 7 | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | KANJIKUZHI | YES | TANGIBLE | Completed | |
143 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-9-81-82043 | RENOVATON OF LAVANNYA KAYARPIRI SANGAM IN WARD 4 | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | KANJIKUZHI | YES | TANGIBLE | Completed | |
144 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-9-81-82046 | CONSTRUCTION OF COIR RATT UNIT IN WARD 8 | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | KANJIKUZHI | YES | TANGIBLE | Completed | |
145 | KERALA | ALAPPUZHA | KANJIKUZHY - MARARIKULAM NORTH | W-240-9-81-82055 | RENOVATION OF CHALUNKAL KAYARPIRI SANGAM IN WARD 17 | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | KANJIKUZHI | YES | TANGIBLE | Completed | |
146 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-1-4-7352 | PIPELINE EXTENSION AT VARIOUS WARDS | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
147 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-1-4-7375 | THURUTHUR MANANCHERIKUNNU FEEDER LINE | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
148 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-1-4-7415 | PIPELINE DISTRIBUTION NETWORK | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | KUNNUKARA | YES | TANGIBLE | Completed | |
149 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-10-126-8481 | WOMAN GROUP TO TAKE UP CULTIVATION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | FARMER PRODUCER GROUP | KUNNUKARA, PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
150 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-10-138-8507 | RENOVATION WORKS OF EXISTING IRRIGATION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
151 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-10-138-8616 | CONSTRUCTION OF NEW IRRIGATION CHANNELS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | KUNNUKARA, PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
152 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-10-142-8764 | MARKETING CENTER FOR KUDUMBASREE PRODUCTS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | MARKET FOR AGRI AND RELATED PRODUCE | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
153 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-10-295-8130 | ROOF WATER HARVESTING FOR WELL RECHARGE | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | KUNNUKARA, PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
154 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-10-302-7870 | SIDE PROTECTION OF EXISTING WATER CHANNELS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KUNNUKARA, PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
155 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-10-302-7884 | CONSTRUCTION OF WATER CONSERVATION STRUCTURE | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KUNNUKARA | YES | TANGIBLE | Completed | |
156 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-10-302-7925 | CONSTRUCTION OF PURAPALLIKAVU REGULATOR CUM BRIDGE | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KUNNUKARA, PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
157 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-10-87-8450 | SUPPLY OF COCONUT SEEDLINGS SUPPLY OF POULTRY ETD | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | AGRI PROCESSING UNIT (FLOUR/PULSES/VEGETABLES/FRUITS/HONEY ETC.) | KUNNUKARA, PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
158 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-10-87-8638 | DEVELOPMENT ACTIVITIES FOR UNCULTIVATED AREA | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | AGRI PROCESSING UNIT (FLOUR/PULSES/VEGETABLES/FRUITS/HONEY ETC.) | KUNNUKARA, PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
159 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-11-171-78297 | RENOVATION OF GOVT L P SCHOOL KUNNUVAYAL | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KUNNUKARA | YES | TANGIBLE | Completed | |
160 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-11-171-8840 | RENOVATION OF GOVT L P SCHOOL CHALAKKA | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KUNNUKARA | YES | TANGIBLE | Completed | |
161 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-11-187-78312 | SMART CLASSROOM WITH COMPUTER FACILITIES AT GOVT L P SCHOOL ELENDHIKARA | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
162 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-11-187-8815 | SMART CLASS ROOM AND COMPUTER FACILITIES PSMLP SCHOOL | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
163 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-12-195-8782 | CONSTRUCTION OF PHC NEW BUILDING | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KUNNUKARA | YES | TANGIBLE | Completed | |
164 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-12-196-78310 | RENOVATION OF SUBCENTER 2 | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | KUNNUKARA | YES | TANGIBLE | Completed | |
165 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-12-196-8791 | RENOVATION OF SUBCENTER 1 | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | KUNNUKARA | YES | TANGIBLE | Completed | |
166 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-13-208-8971 | ESTABLISHMENT OF E LITERACY CENTRE | DIGITAL LITERACY | DIGITAL TRAINING CENTER OR E BANKING LITERACY CENTRE OR KNOWLEDGE RESOURCE CENTRE | KUNNUKARA | YES | TANGIBLE | Completed | |
167 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-16-224-8328 | SOCIAL FORESTRY AND SOIL WATER CONSERVATION | ENVIRONMENT | SOCIAL FORESTRY | KUNNUKARA, PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
168 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-16-332-8310 | MODERNIZATION OF CREMATORIUM | ENVIRONMENT | CREAMATORIUM | KUNNUKARA | YES | TANGIBLE | Completed | |
169 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-16-336-8359 | WELL RECHARGE AND RAIN WATER PITS | ENVIRONMENT | RESTORATION AND RENOVATION OF WET LAND | KUNNUKARA, PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
170 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-2-21-7470 | PROVISION OF INDIVIDUAL HH LATRINES | SANITATION | INDIVIDUAL HOUSEHOLD LATRINE (WITH/WITHOUT HANDWASHING FACILITY, WITH/WITHOUT RUNNING WATER FACILITY) | KUNNUKARA, PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
171 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-21-324-53229 | KUNNUKARA PANCHAYATH COMMUNITY HALL | SOCIAL INFRASTRUCTURE | INSTITUTIONAL SUPPORT TO COMMUNITY | KUNNUKARA | YES | TANGIBLE | Completed | |
172 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-3-24-7574 | BIO GAS PLANT | SOLID AND LIQUID WASTE MANAGEMENT | BIO GAS PLANT | KUNNUKARA, PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
173 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-3-37-7598 | PLASTIC SHREDDING UNIT | SOLID AND LIQUID WASTE MANAGEMENT | PLASTIC SHREDDING UNIT | KUNNUKARA, PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
174 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-33-285-8880 | BUDS SCHOOL BUDS REHABILITATION CENTER | SOCIAL WELFARE | CONSTRUCTION/RENOVATION OF BUDS/PLAY SCHOOL | KUNNUKARA | YES | TANGIBLE | Completed | |
175 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-33-285-8940 | DAY CARE CENTER PAKALVEEDU | SOCIAL WELFARE | CONSTRUCTION/RENOVATION OF BUDS/PLAY SCHOOL | KUNNUKARA | YES | TANGIBLE | Completed | |
176 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-33-289-8863 | CONSTRUCTION OF ANGANWADY | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | KUNNUKARA | YES | TANGIBLE | Completed | |
177 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-7634 | CONSTRUCTION OF VILLAGE STREET WITH WITHOUT DRAINS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
178 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-7655 | RENOVATION OF VILLAGE STREET WITH WITHOUT DRAINS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
179 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78030 | RENOVATION OF VILLAGE STREETS IN VARIOUS WARDS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
180 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78031 | PULLARKKAD ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
181 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78032 | ALIKKUNNU NJATTUVETTY ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
182 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78033 | VITHAYATHIL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
183 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78034 | KOPRAKKALAM KALATHIL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
184 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78035 | MASJID KANDAMTHURUTH ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
185 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78036 | ARAKKAPALLAM ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
186 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78037 | SETTLEMENT LINK ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
187 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78038 | BACKER CANAL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
188 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78039 | KARIMBANVELI ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
189 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78040 | VELANKANNIMATHA LINK ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
190 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78042 | BILAY NAGAR ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
191 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78043 | PUTHUSSERY ILLOM KADAVU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
192 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78044 | THERKKAD PARUTHIKKADU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
193 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78045 | KOVATT TEMPLE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
194 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78046 | EDAKKUZHY ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
195 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78047 | SETTLEMENT ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
196 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78048 | KAYIKKUDAM TEMPLE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
197 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78049 | NJARAKKAD MALAYIKKUNNU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
198 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78050 | MADATHITHARA ROAD W 3 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
199 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78051 | APJ ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
200 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78052 | RAGAM ROAD BALANCE PORTION | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
201 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78053 | THRIKKEY PARAMBU ARATTUKADAVU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
202 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78054 | NJARAKKAD ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
203 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78055 | KALLIDICHI ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
204 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78056 | PURATHAYI LINK ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
205 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78057 | CHENGUNEELI SUB ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
206 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78058 | PALAKKANADA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
207 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78059 | ERUPATH PARA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
208 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78060 | PATHANANGADI ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
209 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78061 | CHIRAMATTA LINK ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
210 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78062 | MES ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
211 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78063 | KALATHIKADAVU ROAD RETARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
212 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78064 | SOUTH ADUVASSERY PERIYAR ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
213 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78065 | MAANJERI ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
214 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78066 | NJATTAYATH PALLAM ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
215 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78067 | VIRUTHIPPADAM ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
216 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78068 | CHANDRATHIL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
217 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78070 | AALUPARAMBU LINK ROAD THATTARUPARAMBIL ROAD VASUDEVAPURAM LINK ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
218 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78071 | PUTHUSSERY ELLAM KADAVU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
219 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78072 | AANAKKULAM MASJID LINK ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
220 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78073 | MOOLAMPARAMBU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
221 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78074 | CONSTRUCTION OF NEW VILLAGE ROADS IN VARIOUS WARDS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
222 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78078 | VAIDYASHALA KONNAMPALLAM ROAD IN WARD 11 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
223 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78079 | PATTOM KALLOPPADY MUNDAKAPADOM ROAD SIDE KETTAL METALLING AND TARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
224 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78080 | KEEZHUPPADAM MUTTIKKAL ROAD METALLING AND TARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
225 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78081 | KUZHALKINAR LINK ROAD SIDE KETTAL AND RETARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
226 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78082 | MALAVANA AMBALAKKADAVU ROAD W10 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
227 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78083 | KURISHINKAL KUNJIVENGI ROAD W13 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
228 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78084 | AKATHUCHAL ROAD W15 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
229 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78085 | KURIYAN PARAMBU VAZHAPPILLY VAZHAVALAPPU ROAD IN WARD 12 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
230 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78087 | MUTHUPARAMBU LINK ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
231 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78088 | IDAMANA ROAD DRAIN CONSTRUCTION W7 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
232 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78089 | ANUGRAHA ROAD W16 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
233 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78090 | ULLAS NAGAR DRAIN CONSTRUCTION W1 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
234 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78091 | KALLEPARAMBU ULLAS NAGAR ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
235 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78092 | CHOWKAKADAVU MEPPADOM ROAD W10 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
236 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78093 | VP THURUTH KIZHAKKEPPALLAM ROAD FILLING AND SIDE PROTECTION W11 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
237 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78095 | CHOWKAKADAVU THEKKINKADU BOAT JETTY ROAD W10 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
238 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78096 | RAJEEV GANDHI ROAD CONCRETING W13 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
239 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78097 | MANJALY PUZHAYORAM LINK ROAD WARD 9 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
240 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78098 | VAYANASHALA ROAD RETARRING W7 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
241 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78099 | ULLAS NAGAR PANJIPILLA LINK ROAD W1 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
242 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78100 | NAZRATH BYE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
243 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78101 | PULPARK KIZHAKKE ROAD BUNGLAVU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
244 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78102 | THURUTHIPURAM LAKSHAM VEEDU COLONY RENOVATION W14 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
245 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78103 | ST THOMAS PANACHA ROAD KAITHACHIRA PANACHA ROAD METTALLING AND TARRING W3 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
246 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78104 | SEMITHERI ROAD WARD 16 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
247 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78105 | THADATTY LINK ROAD IN WARD 12 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
248 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78106 | VAPPANKODE COLONY ROAD FILLING W8 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
249 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78107 | SNDP LINK ROAD WARD 16 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
250 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78108 | THIVALAPPU ROAD WARD 9 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
251 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78110 | THOPPU MALAVANA ROAD W10 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
252 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78111 | THELATHURUTH VALAM LINK ROAD W9 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
253 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78112 | CHERUKADAPURAM FATHIMA MATHA CHURCH ROAD METALLING AND TARRING WARD 9 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
254 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78113 | ST PAULS ROAD FORMATION | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
255 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78115 | ST GEORGE NAGAR ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
256 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78116 | KEEZHUPADAM THIRUTHEPADAM ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
257 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78117 | KUZHIYALA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
258 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78118 | SREE KUMARAVILASAM TEMPLE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
259 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78120 | MINI COLONY ROAD SIDE KETTAL AND IRISH DRAIN | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
260 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78121 | MUPPATHPARA PALIYAMTHURUTH ROAD CULVERT PARAPET WALL WARD 17 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
261 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78123 | SMASANAM ROAD METALLING AND TARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
262 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78125 | BAKERY KAVALA THIRUTHOOR ROAD RETARRING AND SIDE PROTECTION | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
263 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78126 | SHJ ROAD RETARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
264 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78128 | COMPANY THODU CHOWKA ROAD W16 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
265 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78130 | MALAVANA MAROTTITHARA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
266 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78131 | MOTHER THERESSA LINK ROAD CONCRETING W15 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
267 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78132 | PUMP HOUSE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
268 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78133 | KOOTTALAKADAVU ROAD SIDE KETTAL | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
269 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78134 | PANJIPILLA KUTTICHIRA LINK ROAD METALLING AND TARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
270 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78135 | EMS ROAD METALLING AND TARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
271 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78136 | PAYYAPPILLY ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
272 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78137 | KANATHAATTU PANJIPILLA ROAD DRAIN CONSTRUCTION | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
273 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78138 | PANJIPPILLA ELICHIRA ROAD DRAIN | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
274 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78139 | KODIKUTHIYAKUNNU VATTEKKATTUKUNNU IRISH DRAIN | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
275 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78142 | MARIYA BHAVAN ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
276 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78144 | VAZHAPILLY LINK ROAD TILE WORK | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
277 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78145 | ST FRANCIS LINK ROAD SIDE KETTU METALLING AND TARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
278 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78146 | AYYARUCHAL ANGANWADI ROAD W13 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
279 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78147 | STATION KADAVU PAREPPALLAM ROAD W12 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
280 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78148 | THELATHURUTH KUTTIKKATTUPALLAM KULAMB ROAD WARD 9 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
281 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78149 | ISWARYA ROAD W12 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
282 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78150 | KALLUNGALKADAVU KALLUPALAM THEERADESA ROAD WARD 17 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
283 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78151 | SHJ LP SCHOOL APPROACH ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
284 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78152 | STATION KADAVU PAREPPALLAM LINK ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
285 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78153 | AYYARUCHAL MUDHUPARAMBU ROAD SIDEWALL W13 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
286 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78154 | VILLAGE KURISHINGAL LINK ROAD W13 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
287 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78155 | PANDIPADAM VATTEKKADU BHAGAVATHI KSHETRAM ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
288 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78156 | AALAMATTAM KANAKKANKADAVU ROAD RETARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
289 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78157 | CHEERUPALAM ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
290 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78159 | STATION KADAVU MALAVANA FERRY ROAD CHAPPATH | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
291 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-4-44-78243 | THADIKKAKADAVU KOVATT ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KUNNUKARA | YES | TANGIBLE | Completed | |
292 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-5-49-7725 | EXTENTION OF STREET LINE CABLING AND STREET LIGHTS | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
293 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-5-49-7756 | EXTENTION OF STREET LINE CABLING AND STREET LIGHTS | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | KUNNUKARA | YES | TANGIBLE | Completed | |
294 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-5-49-8241 | DEDICATED FEEDER LINE | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
295 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-5-50-53224 | INSTALLATION OF SOLAR PANNELS OVER PUTHENVELIKARA GP BUILDING | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRIFICATION OF COMMUNITY/GOVERNMENT BUILDINGS (SCHOOLS/SC/PHC/CHC/GP BUILDING/BUS STOP ETC.) | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
296 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-5-55-8144 | ESTABLISHMENT OF SOLAR FIELDS OVER ROOF TOPS | VILLAGE STREET LIGHTS AND ELECTRIFICATION | SOLAR PLANT INTEGRATED WITH GRID LINES OR WITHOUT GRID | KUNNUKARA | YES | TANGIBLE | Completed | |
297 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-7-65-7831 | BUS STAND CONSTRUCTION | PUBLIC TRANSPORT | CONSTRUCTION OF BUS STAND | PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
298 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-7-68-78244 | SCHOOL BUS FOR ST JOSEPH L P SCHOOL | PUBLIC TRANSPORT | MEANS OF COMMERCIAL TRANSPORT (BUSES OR MAGIC PICK UP ETC) | KUNNUKARA | YES | TANGIBLE | Completed | |
299 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-7-68-78245 | SCHOOL BUS FOR G L P SCHOOL CHALAKKA | PUBLIC TRANSPORT | MEANS OF COMMERCIAL TRANSPORT (BUSES OR MAGIC PICK UP ETC) | KUNNUKARA | YES | TANGIBLE | Completed | |
300 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-9-79-8434 | MICRO ENTERPRISE UNIT | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | KUNNUKARA, PUTHENVELIKKARA | YES | TANGIBLE | Completed | |
301 | KERALA | ERNAKULAM | PUTHENVELIKKARA - KUNNUKARA CLUSTER | W-242-9-79-8439 | WOMEN RESIDENTIAL TRAINING CENTER | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | KUNNUKARA | YES | TANGIBLE | Completed | |
302 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-1-4-31350 | REPLACEMENT OF UNDER SIZED DISTRIBUTION PIPES AND PVC PIPES TO DI AND PVC | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | CHEMBILODE | YES | INTANGIBLE | Completed | --- |
303 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-1-4-31371 | REPLACEMENT OF AC DISTRIBUTION MAIN PIPES WITH DI PIPES | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | CHEMBILODE | YES | INTANGIBLE | Completed | --- |
304 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-1-4-31373 | EXTENSION OF DISTRIBUTION SYSTEM WITH PVC PIPES | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | CHEMBILODE | YES | INTANGIBLE | Completed | --- |
305 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-1-4-31376 | REPLACEMENT OF AC PIPES TO DI | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PERALASSERI | YES | INTANGIBLE | Completed | --- |
306 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-1-4-31377 | REPLACEMENT OF DISTRIBUTION PIPE FROM MOONUPERIYA TO KEEZHZARA | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PERALASSERI | YES | INTANGIBLE | Completed | --- |
307 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-1-4-31378 | EXTENSION OF DISTRIBUTION SYSTEM WITH PVC PIPE | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PERALASSERI | YES | TANGIBLE | Completed | |
308 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-1-8-31374 | CONSTRUCTION OF GI SERVICE RESERVOIR | PIPED WATER SUPPLY | OVER HEAD TANK UPGRADATION AND CONSTRUCTION | CHEMBILODE | YES | TANGIBLE | Completed | |
309 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-10-109-31568 | DAIRY SHED | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | CONSTRUCTION/RENOVATION OF COLD STORAGE | CHEMBILODE | YES | TANGIBLE | Completed | |
310 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-10-140-31572 | CULTIVATION OF VACANT LAND | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | LAND LEVELING | PERALASSERI | YES | TANGIBLE | Completed | |
311 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-10-140-81141 | CULTIVATION OF VACANT LAND | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | LAND LEVELING | CHEMBILODE | YES | TANGIBLE | Completed | |
312 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-10-302-31556 | CONSTRUCTION OF WATER CONSERVATION STRUCTURES | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PERALASSERI | YES | TANGIBLE | Completed | |
313 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-10-302-31570 | SIDE PROTECTION AND DEEPENING OF CHALA THODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | CHEMBILODE | YES | TANGIBLE | Completed | |
314 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-10-302-81620 | CONSTRUCTION OF WATER CONSERVATION STRUCTURES | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | CHEMBILODE | YES | TANGIBLE | Completed | |
315 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-11-171-31586 | RENOVATION OF CHALA GHSS AND CONSTRUCTION OF SCHOOL SANITARY COMPLEX | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | CHEMBILODE | YES | TANGIBLE | Completed | |
316 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-12-192-31578 | RENNOVATION OF MOWANCHERY HOMEO DISPENSARY | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | CHEMBILODE | YES | TANGIBLE | Completed | |
317 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-12-193-31576 | BUILDING FOR IRIVERY CHC | HEALTH | CONSTRUCTION/UPRADATION OF CHC | CHEMBILODE | YES | TANGIBLE | Completed | |
318 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-12-196-114007 | BUILDING OF THANNADA SUB CENTRE | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | CHEMBILODE | YES | TANGIBLE | Completed | |
319 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-12-196-31577 | COMPOUND WALL TO MUTHUKUTTY SUB CENTRE | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | CHEMBILODE | YES | TANGIBLE | Completed | |
320 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-12-196-31579 | KOYYODE SUB CENTRE | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | CHEMBILODE | YES | TANGIBLE | Completed | |
321 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-12-196-31580 | BUILDING OF CHALA SUB CENTRE | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | CHEMBILODE | YES | TANGIBLE | Completed | |
322 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-13-208-81253 | DIGITAL LITERACY TRAINING | DIGITAL LITERACY | DIGITAL TRAINING CENTER OR E BANKING LITERACY CENTRE OR KNOWLEDGE RESOURCE CENTRE | CHEMBILODE | YES | INTANGIBLE | Completed | --- |
323 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-14-213-31601 | FRONT OFFICE MODERNISATION | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | PERALASSERI | YES | TANGIBLE | Completed | |
324 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-16-332-31559 | CONSTRUCTION OF CREMATORIUM | ENVIRONMENT | CREAMATORIUM | PERALASSERI | YES | TANGIBLE | Completed | |
325 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-17-228-31574 | WOMEN CULTURAL AND MARKETING CENTRE | EMPLOYMENT GENERATION AND SHG FORMATION | CONSTRUCTION/RENOVATION OF MARKET/SHOPPING COMPLEX | PERALASSERI | YES | TANGIBLE | Completed | |
326 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-2-17-31380 | PUBLIC TOILET FOR IRIVERI VINJANVADI | SANITATION | BUILDING OF PUBLIC TOILETS (BUS STOP/MARKET/ OTHER IDENTIFIED PLACES ETC.) | CHEMBILODE | YES | TANGIBLE | Completed | |
327 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-2-21-31381 | CONSTRUCTION OF IHHL | SANITATION | INDIVIDUAL HOUSEHOLD LATRINE (WITH/WITHOUT HANDWASHING FACILITY, WITH/WITHOUT RUNNING WATER FACILITY) | CHEMBILODE | YES | TANGIBLE | Completed | |
328 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-2-21-81278 | CONSTRUCTION OF IHHL | SANITATION | INDIVIDUAL HOUSEHOLD LATRINE (WITH/WITHOUT HANDWASHING FACILITY, WITH/WITHOUT RUNNING WATER FACILITY) | PERALASSERI | YES | TANGIBLE | Completed | |
329 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-20-254-31600 | CONSTRUCTION OF MAKKRERY STADIUM | SPORTS INFRASTRUCTURE | COURT (TENNIS AND OTHERS)/STADIUM FOR DIFFERENT INDOOR AND OUTDOOR GAMES | PERALASSERI | YES | TANGIBLE | Completed | |
330 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-3-25-31384 | COMPOST PIT BUCKETS NADEP COMPOST | SOLID AND LIQUID WASTE MANAGEMENT | CONSTRUCTION OF COMMUNITY SOAK/ VERMI COMPOST PITS | PERALASSERI | YES | TANGIBLE | Completed | |
331 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-3-25-81304 | COMPOST PIT BUCKETS NADEP COMPOST | SOLID AND LIQUID WASTE MANAGEMENT | CONSTRUCTION OF COMMUNITY SOAK/ VERMI COMPOST PITS | CHEMBILODE | YES | TANGIBLE | Completed | |
332 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-3-33-31382 | CONSTRUCTION OF BUILDING AND PURCHASE OF MACHINERY FOR PLASTIC RECYCLING UNIT | SOLID AND LIQUID WASTE MANAGEMENT | INFRASTRUCTURE DEVELOPMENT FOR CENTRALISED SOLID WASTE MANAGEMENT | PERALASSERI | YES | TANGIBLE | Completed | |
333 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-33-288-31596 | CONSTRUCTION OF GERIATRIC CENTRE | SOCIAL WELFARE | CONSTRUCTION OF OLD AGE SHELTER/HOME | PERALASSERI | YES | TANGIBLE | Completed | |
334 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-33-289-31590 | CONTRUCTION OF MIDAVILODE ANGANAVADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | CHEMBILODE | YES | TANGIBLE | Completed | |
335 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-33-289-31591 | EXTENSION WORK OF KOYYODE VAYANASALA ANGANVADY | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | CHEMBILODE | YES | TANGIBLE | Completed | |
336 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-33-289-31593 | CONSTRUCTION OF ANGANWADI AT KILALUR | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PERALASSERI | YES | TANGIBLE | Completed | |
337 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-33-289-81737 | CONTRUCTION OF ANGANAWADY AT KAKKOTH | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | CHEMBILODE | YES | TANGIBLE | Completed | |
338 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-31545 | CONSTRUCTION OF NEW BITUMEN ROAD WITH DRAINAGE | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | CHEMBILODE | YES | TANGIBLE | Completed | |
339 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-31546 | CHALIL MUKKU AMBAYATHIL THAZHE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PERALASSERI | YES | TANGIBLE | Completed | |
340 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81039 | CONSTRUCTION OF NEW BITUMEN ROAD WITH DRAINAGE | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PERALASSERI | YES | TANGIBLE | Completed | |
341 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81075 | CHORAKKULAM POWERLOOM METTA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PERALASSERI | YES | TANGIBLE | Completed | |
342 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81079 | ELAVANA ODUNGODU ROAD BAALIKKAVU LINK ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PERALASSERI | YES | TANGIBLE | Completed | |
343 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81083 | KAPPANACHL VEETIKKUNNUMMAL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PERALASSERI | YES | TANGIBLE | Completed | |
344 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81087 | KOROTH THAZHE KANNOTH THAZHE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PERALASSERI | YES | TANGIBLE | Completed | |
345 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81091 | CHERUMAVILAYI UP SCHOOL KUNIYILIDAM LINK ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PERALASSERI | YES | TANGIBLE | Completed | |
346 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81096 | MADATHUMKANDI ANIPPATTIL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PERALASSERI | YES | TANGIBLE | Completed | |
347 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81098 | MAVILAKANDY TEMPLE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PERALASSERI | YES | TANGIBLE | Completed | |
348 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81104 | MULIKKATTIL PANCHAMOOLA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PERALASSERI | YES | TANGIBLE | Completed | |
349 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81106 | PULIDEVAN KSHETHRAM ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PERALASSERI | YES | TANGIBLE | Completed | |
350 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81107 | PUTHAMPURA MUKKU KAITHAKUNIYIL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PERALASSERI | YES | TANGIBLE | Completed | |
351 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81111 | RENOVATION OF KV MUTTINTE THAZHE ROAD TARING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | CHEMBILODE | YES | TANGIBLE | Completed | |
352 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81113 | MADAPPURA KARTHIKA FURNITURE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | CHEMBILODE | YES | TANGIBLE | Completed | |
353 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81116 | VANDYALA MAMMICHAL ROAD TARING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | CHEMBILODE | YES | TANGIBLE | Completed | |
354 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81119 | MARANDI MUKKUCHEMBILODE UP SCHOOL ROAD TAR | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | CHEMBILODE | YES | TANGIBLE | Completed | |
355 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81121 | VADAKKE VETTIL PUTHAN VEEDU ROAD TARING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | CHEMBILODE | YES | TANGIBLE | Completed | |
356 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-44-81124 | NANDANATH METTA PALLIKANDY VALIYA VALAPPIL ROAD TAR | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | CHEMBILODE | YES | TANGIBLE | Completed | |
357 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-4-46-114022 | THUMBARATHIL PODUVACHERY UP SCHOOL ROAD CULVERT CONSTRUCTION AND SIDE PROTECTION | ACCESS TO VILLAGE STREETS WITH DRAINS | VILLAGE DRAIN (ON GROUND/UNDER GROUND) CONSTRUCTION | PERALASSERI | YES | TANGIBLE | Completed | |
358 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-5-53-31549 | CONVERSION FROM CONVENTIONAL STREET LIGHTING TO LED | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PERALASSERI | YES | TANGIBLE | Completed | |
359 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-5-53-31550 | ESTABLISHING NEW STREET MAIN | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | CHEMBILODE | YES | TANGIBLE | Completed | |
360 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-5-53-31551 | ESTABLISHING NEW STREET LIGHING | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PERALASSERI | YES | TANGIBLE | Completed | |
361 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-5-53-31552 | ESTABLISHING NEW STREET LIGHING | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PERALASSERI | YES | TANGIBLE | Completed | |
362 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-5-53-31553 | ESTABLISHING NEW STREET LINE | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PERALASSERI | YES | TANGIBLE | Completed | |
363 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-5-53-81307 | ESTABLISHING NEW STREET LIGHING | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | CHEMBILODE | YES | TANGIBLE | Completed | |
364 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-5-53-81308 | ESTABLISHING NEW STREET LIGHTING | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | CHEMBILODE | YES | TANGIBLE | Completed | |
365 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-5-55-31557 | ESTABLISHMENT OF SOLAR FIELD AT AYURVEDA HOSPITAL | VILLAGE STREET LIGHTS AND ELECTRIFICATION | SOLAR PLANT INTEGRATED WITH GRID LINES OR WITHOUT GRID | CHEMBILODE | YES | TANGIBLE | Completed | |
366 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-5-55-31558 | ESTABLISHMENT OF SOLAR FIELD AT PHC COMPOUND PODUVACHERY | VILLAGE STREET LIGHTS AND ELECTRIFICATION | SOLAR PLANT INTEGRATED WITH GRID LINES OR WITHOUT GRID | PERALASSERI | YES | TANGIBLE | Completed | |
367 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-5-55-81309 | ESTABLISHMENT OF MUTTILACHIRA ANGANWADI WARD 7 | VILLAGE STREET LIGHTS AND ELECTRIFICATION | SOLAR PLANT INTEGRATED WITH GRID LINES OR WITHOUT GRID | CHEMBILODE | YES | TANGIBLE | Completed | |
368 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-5-55-81310 | ESTABLISHMENT OF SOLAR FIELD AT VETINARY HOSPITAL | VILLAGE STREET LIGHTS AND ELECTRIFICATION | SOLAR PLANT INTEGRATED WITH GRID LINES OR WITHOUT GRID | CHEMBILODE | YES | TANGIBLE | Completed | |
369 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-5-55-81311 | ESTABLISHMENT OF SOLAR FIELD AT ANGANWADI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | SOLAR PLANT INTEGRATED WITH GRID LINES OR WITHOUT GRID | CHEMBILODE | YES | TANGIBLE | Completed | |
370 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-5-55-81610 | ESTABLISHING NEW STREET LINE | VILLAGE STREET LIGHTS AND ELECTRIFICATION | SOLAR PLANT INTEGRATED WITH GRID LINES OR WITHOUT GRID | CHEMBILODE | YES | TANGIBLE | Completed | |
371 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-31547 | BITUMEN ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PERALASSERI | YES | TANGIBLE | Completed | |
372 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-31548 | CHERUMAVILAYI KUNIYILIDAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PERALASSERI | YES | TANGIBLE | Completed | |
373 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81255 | BITUMEN ROADS | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | CHEMBILODE | YES | TANGIBLE | Completed | |
374 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81256 | KAKKARA KELOTH MUKKU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PERALASSERI | YES | TANGIBLE | Completed | |
375 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81257 | KINARUKANDI MUKKU PUTHIYAPURAYIL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PERALASSERI | YES | TANGIBLE | Completed | |
376 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81258 | KOTTAM KATTIPRAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PERALASSERI | YES | TANGIBLE | Completed | |
377 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81259 | P ANANDHAN SMRITHI KUDEERAM KELOTH THAZHE VAYAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PERALASSERI | YES | TANGIBLE | Completed | |
378 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81260 | PANTHEERIKANDY MUKU NOONHIL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PERALASSERI | YES | TANGIBLE | Completed | |
379 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81261 | PAPPU MASH MUKKU VAZHAKOTH MUKKU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PERALASSERI | YES | TANGIBLE | Completed | |
380 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81262 | PARIYARAM TEMPLE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PERALASSERI | YES | TANGIBLE | Completed | |
381 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81263 | PUTHITHIYAKAVU MUKKU KOODATHIL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PERALASSERI | YES | TANGIBLE | Completed | |
382 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81264 | RAGESHBABU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PERALASSERI | YES | TANGIBLE | Completed | |
383 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81265 | THALIYILAMBALAM SOOPPINDE VALAPPIL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PERALASSERI | YES | TANGIBLE | Completed | |
384 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81266 | THAZHE VEETIL OTHENAN CHALIL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PERALASSERI | YES | TANGIBLE | Completed | |
385 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81268 | THATTUPARAMBA KRISHNAN SMARAKA VAYANASALA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | CHEMBILODE | YES | TANGIBLE | Completed | |
386 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81269 | KORAN NAIR VAYANASALA KAKKOTH ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | CHEMBILODE | YES | TANGIBLE | Completed | |
387 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81270 | TARING TO MANDENKANDI ASEES HAJICANAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | CHEMBILODE | YES | TANGIBLE | Completed | |
388 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81271 | CHALA POOKANDY ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | CHEMBILODE | YES | TANGIBLE | Completed | |
389 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81272 | THANNADA MAHATHMAGANDI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | CHEMBILODE | YES | TANGIBLE | Completed | |
390 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81273 | MOWANCHERY MALABAR TTI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | CHEMBILODE | YES | TANGIBLE | Completed | |
391 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81274 | ASARI MUKKU MANDIKKANDI THAZHE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | CHEMBILODE | YES | TANGIBLE | Completed | |
392 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81275 | SI MUKKU THATTANKUNIPALLI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | CHEMBILODE | YES | TANGIBLE | Completed | |
393 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-6-59-81276 | INDRAN MUKKU THEYI PARADEVADA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | CHEMBILODE | YES | TANGIBLE | Completed | |
394 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-9-79-31566 | SKILL DEVELOPMENT AT VARIOUS FIELDS | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | CHEMBILODE | YES | INTANGIBLE | Completed | --- |
395 | KERALA | KANNUR | CHEMBILODE-PERALASSERY CLUSTER | W-247-9-79-81279 | SKILL DEVELOPMENT AT VARIOUS FIELDS | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | PERALASSERI | YES | INTANGIBLE | Completed | --- |
396 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-1-4-9552 | RENOVATION OF EXISTING WATER SUPPLY SCHEME | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | MANGATTIDOM | YES | INTANGIBLE | Completed | --- |
397 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-1-4-9555 | ESTABLISHMENT OF NEW WATER SUPPLY SCHEME | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | MANGATTIDOM | YES | TANGIBLE | Completed | |
398 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-1-4-9558 | THIRTEEN NEW WATER SUPPLY SCHEME | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | KOTTAYAM | YES | TANGIBLE | Completed | |
399 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-116-87218 | IRRIGATION PUMPSETS TO INDIVIDUALS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | DISTRIBUTION OF AGRICULTURAL INSTRUMENT/EQUIPMENT/ CUSTOM HIRE SERVICE CENTRE | MANGATTIDOM | YES | TANGIBLE | Completed | |
400 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-116-9514 | IRRIGATION PUMPSETS TO INDIVIDUALS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | DISTRIBUTION OF AGRICULTURAL INSTRUMENT/EQUIPMENT/ CUSTOM HIRE SERVICE CENTRE | KOTTAYAM | YES | TANGIBLE | Completed | |
401 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-138-13700 | SIDE PROTECTION OF EXISTING WATER CHANNELS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | KOTTAYAM | YES | TANGIBLE | Completed | |
402 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-138-13707 | CONSTRUCTION OF WATER CONSERVATION STRUCTURES | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | KOTTAYAM | YES | TANGIBLE | Completed | |
403 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-138-86757 | CONSTRUCTION OF WATER CONSERVATION STRUCTURES | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | MANGATTIDOM | YES | TANGIBLE | Completed | |
404 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-138-86758 | RENOVATION OF EXISTING IRRIGATION CHANNELS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | MANGATTIDOM | YES | TANGIBLE | Completed | |
405 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-138-86759 | SIDE PROTECTION OF EXISTING WATER CHANNELS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | MANGATTIDOM | YES | TANGIBLE | Completed | |
406 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-138-9503 | RENOVATION OF EXISTING IRRIGATION CHANNELS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | KOTTAYAM | YES | TANGIBLE | Completed | |
407 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-142-53386 | MARKETING CENTRE FOR KUDUMBASREE | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | MARKET FOR AGRI AND RELATED PRODUCE | KOTTAYAM | YES | TANGIBLE | Completed | |
408 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-142-86760 | MARKETING CENTRE FOR KUDUMBASREE | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | MARKET FOR AGRI AND RELATED PRODUCE | MANGATTIDOM | YES | TANGIBLE | Completed | |
409 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-142-9534 | AGRI PRODUCT COLLECTION AND MARKETING CENTER | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | MARKET FOR AGRI AND RELATED PRODUCE | MANGATTIDOM | YES | TANGIBLE | Completed | |
410 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-146-13748 | SUPPLY OF COCONUT SEEDLINGS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | ORGANIC FARMING | KOTTAYAM | YES | TANGIBLE | Completed | |
411 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-146-13769 | GROWBAG UNIT FOR KITCHEN GUARDEN CULTIVATION FOR VEGETABLES | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | ORGANIC FARMING | KOTTAYAM | YES | TANGIBLE | Completed | |
412 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-146-86761 | GROWBAG UNIT FOR KITCHEN GUARDEN CULTIVATION FOR VEGETABLES | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | ORGANIC FARMING | MANGATTIDOM | YES | TANGIBLE | Completed | |
413 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-146-86762 | SUPPLY OF COCONUT SEEDLINGS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | ORGANIC FARMING | MANGATTIDOM | YES | TANGIBLE | Completed | |
414 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-158-13777 | WOMEN GROUPS TO TAKE UP CULTIVATION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | VEGETABLE CULTIVATION HUB | KOTTAYAM | YES | TANGIBLE | Completed | |
415 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-158-87110 | WOMEN GROUPS TO TAKE UP CULTIVATION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | VEGETABLE CULTIVATION HUB | MANGATTIDOM | YES | TANGIBLE | Completed | |
416 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-295-13724 | RAIN WATER HARVESTING TANK | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | KOTTAYAM | YES | TANGIBLE | Completed | |
417 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-295-13728 | ROOF WATER HARVESTING FOR WELL RECHARGING | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | KOTTAYAM | YES | TANGIBLE | Completed | |
418 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-295-87117 | RAIN WATER HARVESTING TANK | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | MANGATTIDOM | YES | TANGIBLE | Completed | |
419 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-295-87150 | ROOF WATER HARVESTING FOR WELL RECHARGING | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | MANGATTIDOM | YES | TANGIBLE | Completed | |
420 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-302-13713 | POND RENOVATION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KOTTAYAM | YES | TANGIBLE | Completed | |
421 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-302-87173 | FARM PONDS FISHERY CATTLE PONDS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | MANGATTIDOM | YES | TANGIBLE | Completed | |
422 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-302-87188 | PERCOLATION TANKS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | MANGATTIDOM | YES | TANGIBLE | Completed | |
423 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-302-87200 | POND RENOVATION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | MANGATTIDOM | YES | TANGIBLE | Completed | |
424 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-302-9519 | FARM PONDSFISHERY CATTLE PONDS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KOTTAYAM | YES | TANGIBLE | Completed | |
425 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-10-87-9523 | COPRA COLLECTION AND PROCESSING UNIT | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | AGRI PROCESSING UNIT (FLOUR/PULSES/VEGETABLES/FRUITS/HONEY ETC.) | MANGATTIDOM | YES | TANGIBLE | Completed | |
426 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-167-13472 | IMPROVEMENT OF KITCHEN AND DINING FACILITIES | EDUCATION | CONSTRUCTION OF KITCHEN SHED IN SCHOOL | KOTTAYAM | YES | TANGIBLE | Completed | |
427 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-167-87304 | CONSTRUCTION OF NEW CLASS ROOMS AND KITCHEN FACILITIES | EDUCATION | CONSTRUCTION OF KITCHEN SHED IN SCHOOL | MANGATTIDOM | YES | TANGIBLE | Completed | |
428 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-170-13461 | PLAY GROUND FOR SCHOOL | EDUCATION | CONSTRUCTION OF PLAY GROUND/ BASKET BALL/VOLLEYBALL COURT INSIDE SCHOOL | KOTTAYAM | YES | TANGIBLE | Completed | |
429 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-170-87334 | PLAY GROUND FOR SCHOOL | EDUCATION | CONSTRUCTION OF PLAY GROUND/ BASKET BALL/VOLLEYBALL COURT INSIDE SCHOOL | MANGATTIDOM | YES | TANGIBLE | Completed | |
430 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-10088 | CONSTRUCTION OF NEW CLASS ROOMS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KOTTAYAM | YES | TANGIBLE | Completed | |
431 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-10122 | AUDITORIUM FOR IMPROVING OTHER CURRICULUM ACTIVITIES | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KOTTAYAM | YES | TANGIBLE | Completed | |
432 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-10150 | FILTERED PIPED WATER FACILITY | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KOTTAYAM | YES | TANGIBLE | Completed | |
433 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-113768 | RENNOVATION OF CLASS ROOM FOR KOTTAYAM MALABAR HSS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KOTTAYAM | YES | TANGIBLE | Completed | |
434 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-113769 | RENNOVATION OF CLASS ROOM FOR KOTTAYAM MALABAR HSS BALANCE WORK | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KOTTAYAM | YES | TANGIBLE | Completed | |
435 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-113770 | RENNOVATION OF YARD AT KOTTAYAM MALABAR HSS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KOTTAYAM | YES | TANGIBLE | Completed | |
436 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-13456 | GIRLS FRIENDLY TOILET AND BABY FRIENDLY TOILET | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KOTTAYAM | YES | TANGIBLE | Completed | |
437 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-13470 | IMPROVEMENT OF CLASS ROOM FACILITIESOF HIGHER SECONDARY SCHOOL KOTTAYAM GP MALABAR | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KOTTAYAM | YES | TANGIBLE | Completed | |
438 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-87347 | IMPROVEMENT OF CLASS ROOM FACILITIES AND FILTERED PIPED WATER FACILITY | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | MANGATTIDOM | YES | TANGIBLE | Completed | |
439 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-87359 | CONSTRUCTION OF NEW CLASS ROOMS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | MANGATTIDOM | YES | TANGIBLE | Completed | |
440 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-87383 | SCHOOL BUS FOR SCHOOLS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | MANGATTIDOM | YES | TANGIBLE | Completed | |
441 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-87418 | GIRLS FRIENDLY TOILET | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | MANGATTIDOM | YES | TANGIBLE | Completed | |
442 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-88762 | IMPROVEMENT OF CLASSROOM OF KOTTAYAM MALABAR HSS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KOTTAYAM | YES | TANGIBLE | Completed | |
443 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-11-171-88764 | BALANCE WORK OF AUDITORIUM | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | KOTTAYAM | YES | TANGIBLE | Completed | |
444 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-53388 | DEVELOPMENT OF INFRA STRUCTURE FACILITY FOR PHC S AND COMPLETION OF PHC SUB CENTRE | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KOTTAYAM | YES | TANGIBLE | Completed | |
445 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-87445 | RENOVATION OF KOTTAYAM PHC TARRING TO APROACH ROAD FOR PHC | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KOTTAYAM | YES | TANGIBLE | Completed | |
446 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-87450 | MEDICAL LAB WITH BUILDIG IN PHC PAVING INTERLOCK BLOCK | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KOTTAYAM | YES | TANGIBLE | Completed | |
447 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-87455 | RENOVATION OF KOTTAYAM PHC PROVIDING LANDSCAPING WORKS | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KOTTAYAM | YES | TANGIBLE | Completed | |
448 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-87456 | RENOVATION OF KOTTAYAM PHC PROVIDING ACP WORKS | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KOTTAYAM | YES | TANGIBLE | Completed | |
449 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-87460 | RENOVATION OF KOTTAYAM PHC CONSTRUCTION OF COMPOUND WALL | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KOTTAYAM | YES | TANGIBLE | Completed | |
450 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-87465 | RENOVATION OF KOTTAYAM PHC FLOORING AND PLUMBING WORKS | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KOTTAYAM | YES | TANGIBLE | Completed | |
451 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-87470 | RENOVATION OF KOTTAYAM PHC PROVIDING GATE | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KOTTAYAM | YES | TANGIBLE | Completed | |
452 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-87473 | MEDICAL LAB WITH BUILDING IN PHC ALTERATION WORKS TO OLD BLOCK AND BALANCE WORK FOR PHC | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KOTTAYAM | YES | TANGIBLE | Completed | |
453 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-87477 | RENOVATION OF KOTTAYAM PHC PAINTING WORKS OLD BLOCK | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KOTTAYAM | YES | TANGIBLE | Completed | |
454 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-87480 | RENOVATION OF KOTTAYAM PHC ELECTRIFICATION KOTTAYAM PHC | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KOTTAYAM | YES | TANGIBLE | Completed | |
455 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-88761 | RENOVATION OF PHC BUILDING | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KOTTAYAM | YES | TANGIBLE | Completed | |
456 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-88765 | DEVELOPMENT OF INFRA STRUCTURE FACILITY FREEZER FACILITY FOR PHC | HEALTH | CONSTRUCTION/UPRADATION OF PHC | KOTTAYAM | YES | TANGIBLE | Completed | |
457 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-9789 | ECG MACHINE | HEALTH | CONSTRUCTION/UPRADATION OF PHC | MANGATTIDOM | YES | TANGIBLE | Completed | |
458 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-195-9813 | REHABILITATION CENTER IN MANGATTIDAM PHC | HEALTH | CONSTRUCTION/UPRADATION OF PHC | MANGATTIDOM | YES | TANGIBLE | Completed | |
459 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-196-87482 | IMPROVEMENT OF PHC IN MANGATTIDAM | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | MANGATTIDOM | YES | TANGIBLE | Completed | |
460 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-196-9857 | HEALTH SUBCENTRE AT THE UPSTAIR OF SAMSKARIKA NILAYAM THALLODE | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | KOTTAYAM | YES | TANGIBLE | Completed | |
461 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-200-87485 | FULLY EQUIPED MOBILE HEALTH UNITS | HEALTH | MOBILE HEALTH UNIT | MANGATTIDOM | YES | TANGIBLE | Completed | |
462 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-200-9767 | FULLY EQUIPIED MOBILE HEALTH UNITS | HEALTH | MOBILE HEALTH UNIT | KOTTAYAM | YES | TANGIBLE | Completed | |
463 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-12-307-9883 | VETERINARY SUB CENTRE | HEALTH | VETERINARY HOSPITAL OR ANIMAL HEALTH CENTRE | MANGATTIDOM | YES | TANGIBLE | Completed | |
464 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-13-208-113767 | ELECTRIFICATION WORK TO ESTABLISHMENT OF E LITERACY CUM ONLINE EXAMINATION CENTER | DIGITAL LITERACY | DIGITAL TRAINING CENTER OR E BANKING LITERACY CENTRE OR KNOWLEDGE RESOURCE CENTRE | KOTTAYAM | YES | TANGIBLE | Completed | |
465 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-13-208-87272 | ESTABLISHMENT OF E LITERACY CENTER | DIGITAL LITERACY | DIGITAL TRAINING CENTER OR E BANKING LITERACY CENTRE OR KNOWLEDGE RESOURCE CENTRE | MANGATTIDOM | YES | TANGIBLE | Completed | |
466 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-13-208-9538 | ESTABLISHMENT OF E LITERACY CUM ONLINE EXAMINATION CENTER | DIGITAL LITERACY | DIGITAL TRAINING CENTER OR E BANKING LITERACY CENTRE OR KNOWLEDGE RESOURCE CENTRE | KOTTAYAM | YES | TANGIBLE | Completed | |
467 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-14-213-13512 | ESTABLISHMENT OF ECITIZEN SERVICE CENTRE | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | KOTTAYAM | YES | TANGIBLE | Completed | |
468 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-14-213-13530 | KIOSK FACILITY IN GP FRONT OFFICE | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | MANGATTIDOM | YES | TANGIBLE | Completed | |
469 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-14-213-53748 | KIOSK FACILITY IN GP FRONT OFFICE | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | KOTTAYAM | YES | TANGIBLE | Completed | |
470 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-14-213-87241 | ESTABLISHMENT OF ECITIZEN SERVICE CENTRE | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | MANGATTIDOM | YES | TANGIBLE | Completed | |
471 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-16-224-13602 | SOCIAL FORESTRY | ENVIRONMENT | SOCIAL FORESTRY | KOTTAYAM | YES | TANGIBLE | Completed | |
472 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-16-224-13784 | SOIL WATER CONSERVATION MEASURES | ENVIRONMENT | SOCIAL FORESTRY | KOTTAYAM | YES | TANGIBLE | Completed | |
473 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-16-224-13799 | WELL RECHAGE AND RAIN WATER PITS | ENVIRONMENT | SOCIAL FORESTRY | KOTTAYAM | YES | TANGIBLE | Completed | |
474 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-16-224-87424 | SOCIAL FORESTRY | ENVIRONMENT | SOCIAL FORESTRY | MANGATTIDOM | YES | TANGIBLE | Completed | |
475 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-16-224-87430 | SOIL WATER CONSERVATION MEASURES | ENVIRONMENT | SOCIAL FORESTRY | MANGATTIDOM | YES | TANGIBLE | Completed | |
476 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-16-224-87435 | WELL RECHAGE AND RAIN WATER PITS | ENVIRONMENT | SOCIAL FORESTRY | MANGATTIDOM | YES | TANGIBLE | Completed | |
477 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-16-332-53385 | MODENISATION OF CREMATORIUM | ENVIRONMENT | CREAMATORIUM | MANGATTIDOM | YES | TANGIBLE | Completed | |
478 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-2-21-87513 | 111 IHHL FOR PROJECTED NUMBER OF HOUSEHOLDS IN NEXT FIVE YEARS | SANITATION | INDIVIDUAL HOUSEHOLD LATRINE (WITH/WITHOUT HANDWASHING FACILITY, WITH/WITHOUT RUNNING WATER FACILITY) | MANGATTIDOM | YES | TANGIBLE | Completed | |
479 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-2-21-9565 | 100 IHLHOUSE HOLD SANITATION FOR NEXT 3 YRS | SANITATION | INDIVIDUAL HOUSEHOLD LATRINE (WITH/WITHOUT HANDWASHING FACILITY, WITH/WITHOUT RUNNING WATER FACILITY) | KOTTAYAM | YES | TANGIBLE | Completed | |
480 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-20-253-53514 | CONSTRUCTION OF NEW SWIMMING POOL | SPORTS INFRASTRUCTURE | CONSTRUCTION OF SWIMMING POOL | KOTTAYAM | YES | TANGIBLE | Completed | |
481 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-20-253-87780 | CONSTRUCTION OF NEW SWIMMING POOL | SPORTS INFRASTRUCTURE | CONSTRUCTION OF SWIMMING POOL | MANGATTIDOM | YES | TANGIBLE | Completed | |
482 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-20-253-88763 | CONSTRUCTION OF APPROACH ROAD TO SWINNING POOL WARD 13 | SPORTS INFRASTRUCTURE | CONSTRUCTION OF SWIMMING POOL | KOTTAYAM | YES | TANGIBLE | Completed | |
483 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-3-24-53379 | BOI GAS UNIT 5M3 WATER JACKET MODEL 100 HHS | SOLID AND LIQUID WASTE MANAGEMENT | BIO GAS PLANT | KOTTAYAM | YES | TANGIBLE | Completed | |
484 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-3-24-87794 | BOI GAS UNIT 5M3 WATER JACKET MODEL 100 HHS | SOLID AND LIQUID WASTE MANAGEMENT | BIO GAS PLANT | MANGATTIDOM | YES | TANGIBLE | Completed | |
485 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-3-25-53378 | BUCKET BIN RING COMPOST UNIT 3500 HHS | SOLID AND LIQUID WASTE MANAGEMENT | CONSTRUCTION OF COMMUNITY SOAK/ VERMI COMPOST PITS | KOTTAYAM | YES | TANGIBLE | Completed | |
486 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-3-25-53380 | COMPOST PIT | SOLID AND LIQUID WASTE MANAGEMENT | CONSTRUCTION OF COMMUNITY SOAK/ VERMI COMPOST PITS | KOTTAYAM | YES | TANGIBLE | Completed | |
487 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-3-25-87808 | BUCKET BIN RING COMPOST UNIT | SOLID AND LIQUID WASTE MANAGEMENT | CONSTRUCTION OF COMMUNITY SOAK/ VERMI COMPOST PITS | MANGATTIDOM | YES | TANGIBLE | Completed | |
488 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-3-25-87819 | COMPOST PIT | SOLID AND LIQUID WASTE MANAGEMENT | CONSTRUCTION OF COMMUNITY SOAK/ VERMI COMPOST PITS | MANGATTIDOM | YES | TANGIBLE | Completed | |
489 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-3-25-9580 | BUCKET BIN RING COMPOST UNIT | SOLID AND LIQUID WASTE MANAGEMENT | CONSTRUCTION OF COMMUNITY SOAK/ VERMI COMPOST PITS | KOTTAYAM | YES | TANGIBLE | Completed | |
490 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-3-40-9722 | PLASTIC E WASTE MANAGEMENT UNIT | SOLID AND LIQUID WASTE MANAGEMENT | VEHICLES/EQUIPMENTS FOR COLLECTING WASTE FROM HOUSEHOLDS/COMMON DUSTBIN | MANGATTIDOM | YES | TANGIBLE | Completed | |
491 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-285-87605 | DAY CARE CENTREPAKAL VEEDU | SOCIAL WELFARE | CONSTRUCTION/RENOVATION OF BUDS/PLAY SCHOOL | MANGATTIDOM | YES | TANGIBLE | Completed | |
492 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-288-13562 | DAY CARE CENTREPAKAL VEEDU | SOCIAL WELFARE | CONSTRUCTION OF OLD AGE SHELTER/HOME | KOTTAYAM | YES | TANGIBLE | Completed | |
493 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-289-113771 | CONSTRUCTION AND IMPROVEMENT OF UPSTAIR BUILDING AS COUNSELING CENTER FOR TEENAGE GIRLSWIRING WORKS | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | MANGATTIDOM | YES | TANGIBLE | Completed | |
494 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-289-13539 | CONSTRUCTION AND IMPROVEMENT OF ANGANVADIES | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | KOTTAYAM | YES | TANGIBLE | Completed | |
495 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-289-13547 | CONSTRUCTION AND IMPROVEMENT OF UPSTAIR BUILDING AS COUNSELING CENTER FOR TEENAGE GIRLS KANDAMKUNNU | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | MANGATTIDOM | YES | TANGIBLE | Completed | |
496 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-289-13551 | CONSTRUCTION OF WELL MOTOR PIPELINE SYNTHETIC TANK | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | KOTTAYAM | YES | TANGIBLE | Completed | |
497 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-289-87637 | CONSTRUCTION AND IMPROVEMENT OF UPSTAIR BUILDING AS COUNSELING CENTER FOR TEENAGE GIRLS KAITHACHAL ANGANAWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | MANGATTIDOM | YES | TANGIBLE | Completed | |
498 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-289-87647 | CONSTRUCTION AND IMPROVEMENT OF UPSTAIR BUILDINGS EXISTING ANGANAWADIS AS COUNSELING CENTER FOR TEENAGE GIRLS KANDERI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | MANGATTIDOM | YES | TANGIBLE | Completed | |
499 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-289-87659 | CONSTRUCTION OF FIRST FLOOR OF MOVERRY ANGANAWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | KOTTAYAM | YES | TANGIBLE | Completed | |
500 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-289-87663 | CONSTRUCTION OF FIRST FLOOR OF POOLA BAZAR ANGANAWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | KOTTAYAM | YES | TANGIBLE | Completed | |
501 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-289-87667 | CONSTRUCTION OF FIRST FLOOR OF KOOVAPPADI ANGANAWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | KOTTAYAM | YES | TANGIBLE | Completed | |
502 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-289-87670 | ELECTRIFICATION COUNCELLING CENTRES MOUVERY KOOVVAPPADI AND POOLABAZAR | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | KOTTAYAM | YES | TANGIBLE | Completed | |
503 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-289-87744 | CONSTRUCTION OF BUILDING FOR ANGANVADEES | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | MANGATTIDOM | YES | TANGIBLE | Completed | |
504 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-33-289-87772 | CONSTRUCTION OF WELL MOTOR PIPELINE SYNTHETIC TANK | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | MANGATTIDOM | YES | TANGIBLE | Completed | |
505 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-10024 | VATTIPPURAM MAVULLACHALIL THAZHE MADAPPURA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
506 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-10030 | VILLAGE STREETS WITH DRAINS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
507 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-113766 | TARRING WORK OF KOTTAYAM ANGADI PALLIKKULAM KAYANADAM ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
508 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-53343 | CONSTRUCTION OF NEW VILLAGE ROADS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
509 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-53346 | RENOVATION OF EXISTING VILLAGE STREETS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
510 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-53352 | KINAVAKKAL VENGAD BOUNDARY ROAD DRAINAGE | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
511 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-85866 | KARIYIL PALLAM VAYAL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
512 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-85874 | KARIYIL VATTIPURAM VAYAL ROAD U RAGHAVAN VEEDU | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
513 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-85914 | PAREKKADU KAITHOLAM ROAD TARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
514 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-85923 | SHYJUVINTE VEEDU MUTHAL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
515 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-85927 | KANDERI ANGAWADI AROOKKAVU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
516 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-85939 | MERUVAMBAI PALAM PALATTUKUNU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
517 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86595 | CHODHARA TATTUPARAMBA ROAD TARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
518 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86603 | MARUTHORA PAINGOLI ASHOKAN VEEDU ROAD TARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
519 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86606 | KAITHERI KAPPANNA KAITHERI PEERA RAVI VEEDU MUTHAL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
520 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86607 | PERUDHERI BALAN VEEDU MUTHAL SREENARAYANA SCHOOL ROAD TARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
521 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86609 | BABU VAKEEL VEEDU MUTHAL KURUMBAKKAL VAYAL VARE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
522 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86611 | IROOKATTU ILLAM MUKK AMBALAKKANDI MUKUNDANTE VEEDINU MUNNIL KOODI ULLA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
523 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86612 | MULLOLI KANNANVEEDU MUTHAL VALIYA CANAL VARE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
524 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86614 | AMBILAD ANGANAWADI AMBILAD SOUTH L P SCHOOL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
525 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86615 | DESHABANDU VAYANASHALA AMBILAD CANAL AMBILADU SOUTH L P SCHOOL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
526 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86617 | DESHABANDHU ANGANAWADI ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
527 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86619 | KAMBITHOON POYIKAYIL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
528 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86621 | DESHABANDHU ENGLISH MEDIUM SCHOOL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
529 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86623 | POTHIYAKKAVU MUTHAL MANGATTIDAM VAYAL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
530 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86626 | KINATTINTAVIDA SHANKARANELLUR LINK ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
531 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86628 | CANAL ROAD VAYAL VARE | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
532 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86630 | KOYILODE AKG ROAD TARRING AND CULVERT CONSTRUCTION | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
533 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86633 | KONKI LAKSHMANAN VEEDU SHANKARANELLUR VAYAL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
534 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86634 | KEERACHI AQUADUCT VENGAD THERU THOPPIAN BALAN VEEDU VAYAL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
535 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86636 | VATTIPURAM VENGAD THERU CANAL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
536 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86638 | KOYILODE ABDUL AZEEZ SMARAKA VAYANASHALA ROAD TARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
537 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86641 | TARRING WORK OF RAMUNNI VAIDYAR ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
538 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86646 | TARRING WORK OF EDAVALATH MUKKU MANDAPAM ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
539 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86649 | TARRING WORK OF KOLAKKAVIL SREE MUCHILOTTE BHAGAVATHI TEMPLE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
540 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86652 | TARRING WORK OF GANAPATHY KSHETHRAM KOTTAYAM CHIRA THALLODE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
541 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86657 | TARRING WORK OF SISUMANDIRAM MAMMU SMARAKA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
542 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86660 | TARRING WORK OF KUNHALI NAGER MANGALOTTUM CHAL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
543 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86661 | TARRING WORK OF VELLAPPANATHAL WHITE HOUSE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
544 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86662 | TARRING WORK OF THE VELLAPPANTHAL T K NAGAR ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
545 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86664 | TARRING WORK OF MOREMMAL FLOOR MILL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
546 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86665 | TARRING WORK OF MOUVERRY MAPPILA SCHOOL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
547 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86667 | TARRING WORK OF SAFDAR HASHMI ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
548 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86669 | TARRING WORK OF PYKKADU ANGNAWADI ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
549 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86671 | TARRING WORK OF PURUSHUPEEDIKA EMS ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
550 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86674 | TARRING WORK OF KOOVAPPADY KATTILPURA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
551 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86676 | TARRING WORK OF MOUVERY KALLU AMMA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
552 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86678 | TARRING WORK OF MARCHAYIL VANNARATH THAZHE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
553 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86680 | TARRING WORK OF KRISHAN NAIR VELLAPPANTHAL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
554 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86682 | TARRING WORK OF POST OFFICE KOMATH PACHOOSE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
555 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86684 | TARRING WORK OF THALLODE AKG ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
556 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86685 | TARRING WORK OF KOTTAYAM ANGADI PALLIKKULAM KAYANADAM ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
557 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86687 | TARRING WORK OF 7 TH MILE ANGNAWADI ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
558 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86688 | TARRING WORK OF VILLAGE OFFICE NANDANAN MASTER SMARAKA MILK SOCIETY ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
559 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86690 | TARRING WORK OF KALLUSHOP KUNYIL THAZHE ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
560 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86692 | TARRING WORK OF OTTAPPEEDIKA VAYALPURA KOLAVIL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
561 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86694 | TARRING WORK OF CHAMACHA PARAMBU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
562 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86696 | TARRING WORK OF KUNDATHIL PALLAM KUNNU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
563 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86698 | TARRING WORK OF THALLODE NYANAR ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
564 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86700 | TARRING WORK OF NELEYILATTU PALLI ERUVATTY PADASHEKHARA SAMITHI ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
565 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86702 | TARRING WORK OF CHOOLAVIL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
566 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86704 | TARRING WORK OF KARAKUNNU KOOLIL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
567 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86707 | TARRING WORK OF NILEYILATTU PALLI KARAKKUNNU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
568 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86710 | TARRING WORK OF KARAKKUNNU WELDING SHOP ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
569 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86722 | TARRING TO KANATHUMCHIRA ANGANWADI ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
570 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86725 | TARRING WORK OF BATHERRY KUNNU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
571 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86726 | TARRING WORK OF OLAMBA VAYAL SETTUPEEDIKA ERUVATTY PALAM ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
572 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86727 | TARRING WORK OF KATTILPURA SAFDAR HSHMI ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
573 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86728 | TARRING WORK OF PURUSHUPEEDIKA E M S ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
574 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86730 | RENOVATION OF EXISTING VILLAGE STREETS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
575 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86731 | RENOVATION OF EXISTING VILLAGE STREETS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
576 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86732 | RENOVATION OF EXISTING VILLAGE STREETS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
577 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86733 | CONSTRUCTION OF DRAINAGE TO MOUVERY ADIYAPRATH ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
578 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86734 | CONSTRUCTION OF DRAINAGE TO POOKKODE PURAKKALAM ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
579 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86736 | KANATHIL KOOVAPPADI PANUNDA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
580 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86737 | KAYANADAM HIGH SCHOOL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
581 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86738 | CONSTRUCTION OF DRAINAGE TO 6TH MILE KALLUSHOP POOLABAZAR ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
582 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86739 | CONSTRUCTION OF DRAINAGE TO 5TH MILE ERUVATTY THODU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
583 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86740 | CONSTRUCTION OF DRAINAGE TO MAITHANIPALLI ARC ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
584 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86741 | CONSTRUCTION OF DRAINAGE TO NILAYILATTU PALLI PULLYODU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
585 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86742 | CONSTRUCTION OF DRAINAGE TO KANATHIL KUNNINU MEETHALROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
586 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86743 | CONSTRUCTION OF DRAINAGE TO KOOVVAPPADI GURUNATHAN MUKKU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
587 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86744 | CONSTRUCTION OF DRAINAGE TO T K KUNHIRAMAN MASTER KOOVVAPPADI ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
588 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86745 | KAYANADAM SUB CENTRE KOTTAYAM HSS ROAD TARRING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
589 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86746 | CONSTRUCTION OF DRAINAGE TO MAITHANAPPALLY ARC ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
590 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86747 | CONSTRUCTION OF DRAINAGE TO AEO ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
591 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86748 | CONSTRUCTION OF DRAINAGE TO MOUVERY MAPPILA SCHOOL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
592 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86749 | CONSTRUCTION OF DRAINAGE TO AEO ROAD BALANCE WORK | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
593 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86750 | CONSTRUCTION OF DRAINAGE TO KANATHIL KOOVAPPADI PANUNDA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
594 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86751 | CONSTRUCTION OF DRAINAGE TO TKKUNJIRAMAN MASTER KOOVAPPADI ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
595 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86752 | CONSTRUCTION OF DRAINAGE TO PURAKKALAM AMBILADU CANAL ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
596 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86753 | MOONNAM PEEDIKA KANDERI MANIKKOTHU VAYAL VATTIPURAM AYYAPPANTHODE ROAD IMPROVEMENTS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
597 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86754 | KAITHERI KAPPANA AARGATTERI KANDAMKUNNU ROAD IMPROVEMENTS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
598 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-86755 | VELLAPANTHAL SHANKARANELLUR FWC SHANKARANELLUR LPS ROAD IMPROVEMENTS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | MANGATTIDOM | YES | TANGIBLE | Completed | |
599 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-4-44-9900 | CONSTRUCTION OF NEW VILLAGE ROADS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KOTTAYAM | YES | TANGIBLE | Completed | |
600 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-5-48-53383 | ESTABLISHMENT OF STREET LINE CABLING AND STREET LIGHTS | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTRA VILLAGE STREET LIGHT | KOTTAYAM | YES | TANGIBLE | Completed | |
601 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-5-48-87827 | ESTABLISHMENT OF STREET LINE CABLING AND STREET LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTRA VILLAGE STREET LIGHT | MANGATTIDOM | YES | TANGIBLE | Completed | |
602 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-5-48-87834 | ESTABLISHMENT OF STREET LINE CABLING AND STREET LIGHTS | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTRA VILLAGE STREET LIGHT | MANGATTIDOM | YES | TANGIBLE | Completed | |
603 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-5-48-87842 | EXTENSION OF STREET LINE CABLING AND STREET LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTRA VILLAGE STREET LIGHT | MANGATTIDOM | YES | TANGIBLE | Completed | |
604 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-5-49-10037 | EXTENSION OF STREET LINE CABLING AND STREET LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | KOTTAYAM | YES | TANGIBLE | Completed | |
605 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-5-49-10043 | RENOVATION OF EXISTING STREET LIGHTS | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | KOTTAYAM | YES | TANGIBLE | Completed | |
606 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-5-55-87856 | ESTABLISHMENT OF SOLAR FIELDS OVER ROOF TOPS OF PANCHAYATH OFFICES AND PHC | VILLAGE STREET LIGHTS AND ELECTRIFICATION | SOLAR PLANT INTEGRATED WITH GRID LINES OR WITHOUT GRID | MANGATTIDOM | YES | TANGIBLE | Completed | |
607 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-13480 | TARRING WORK OF NANDYATH THAZHE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
608 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-13485 | KANDAMKUNU VAYAL GLPS SCHOOL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANGATTIDOM | YES | TANGIBLE | Completed | |
609 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-53381 | CONSTRUCTION OF ROADS KOOVVAPPADI KONGANTAVIDA TK KUNJIRAMAN MASTER ROAD TARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
610 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87494 | COMPANY KUNNU CHALIL NANU NANDANAN PEEDIKA ROAD TARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANGATTIDOM | YES | TANGIBLE | Completed | |
611 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87497 | KAITHERI PAALAM KALLUSHOP ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANGATTIDOM | YES | TANGIBLE | Completed | |
612 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87499 | IMPROVEMENTS OF AKG BEST PLYWOOD ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
613 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87863 | TARRING WORK OF CHADAYATH MADAPPURA ERUVATTY VAYAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
614 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87869 | TARRING WORK OF AMMANCHERY EDAVALAM MUKKU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
615 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87873 | TARRING TO KOOVAPPADI KONGANTAVIDA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
616 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87876 | NEENTHAL KULAM ROAD TARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
617 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87879 | MATHUKKAVU ROAD TARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
618 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87881 | TARRING TO THALLODE VAYAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
619 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87889 | TARRING TO MANGALOTTUMCHALNEENTHALKULAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
620 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87893 | POOKKODE FOOT PATH ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
621 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87898 | NAME BOARD FOR ALL ROADS BELONGS TO NATIONAL RARBAN MISSION | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
622 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87901 | TARRING TO CIET BOARD QUARTERS ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
623 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87906 | TARRING TO KAPPARA MADAKKARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
624 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87946 | RENNOVATION WORKS TO PURAKKALAM AMBILADU CANAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
625 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87949 | TARRING WORK OF KUVAPPADY MADAPPURA OLAYIKKARA SCHOOL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
626 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87954 | TARRING WORK OF CHATHU VYDYER OLAVAYIL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
627 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87956 | TARRING WORK OF KANATHIL EDATHIL PEEDIKA THODE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
628 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87957 | TARRING WORK TO KUNNINU MEETHAL PALLAM KUNNU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
629 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87958 | RENNOVATION OF GP TO GP ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
630 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87960 | HEALTH CENTER PALAKKUNNU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANGATTIDOM | YES | TANGIBLE | Completed | |
631 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87961 | AARGATTERI JANAKEEYA VAYANASHALA ALLI ROAD FROM 0000 K M TO 0162KM | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANGATTIDOM | YES | TANGIBLE | Completed | |
632 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87965 | KAMBINIKUNU MAMBARAM NADPALAM MAMBARAM VAYAL ROAD FROM 0750KM TO 1396KM | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANGATTIDOM | YES | TANGIBLE | Completed | |
633 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87969 | CHERAVAKATTU KARAMMAL ROAD FROM CH 0000 TO 0150KM | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANGATTIDOM | YES | TANGIBLE | Completed | |
634 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87972 | MANGATTIDAM VILLAGE OFFICE PAZHASSI CANAL AMBILAD PALAM ROAD FROM CH 0350TO 0850KM | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANGATTIDOM | YES | TANGIBLE | Completed | |
635 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87975 | MULLAPPALLI AMBALAM KALARIKKADU ROAD FROM CH 0000KM TO 0687KM | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANGATTIDOM | YES | TANGIBLE | Completed | |
636 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87978 | PALLIKKADU KRISHNAN NAMBIAR VEEDU ROAD FROM 0100 KM TO 0775KM | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANGATTIDOM | YES | TANGIBLE | Completed | |
637 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-87981 | RENNOVATION OF GP TO GP ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANGATTIDOM | YES | TANGIBLE | Completed | |
638 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-6-59-88023 | KINAVAKKAL MOTTEMMAL TOWER ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KOTTAYAM | YES | TANGIBLE | Completed | |
639 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-8-77-13505 | LPG CONNECTION | LPG GAS CONNECTION | LPG CONNECTION TO HOUSEHOLDS | KOTTAYAM | YES | TANGIBLE | Completed | |
640 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-8-77-87506 | LPG CONNECTION | LPG GAS CONNECTION | LPG CONNECTION TO HOUSEHOLDS | MANGATTIDOM | YES | TANGIBLE | Completed | |
641 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-9-79-87514 | CAPACITY BUILDING SKILL TRAINING FOR SELF EMPLOYMENT HANDLOOM ETC | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | MANGATTIDOM | YES | INTANGIBLE | Completed | --- |
642 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-9-79-9495 | CAPACITY BUILDING SKILL TRAINING FOR SELF EMPLOYMENT HANDLOOM ETC | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | KOTTAYAM | YES | INTANGIBLE | Completed | --- |
643 | KERALA | KANNUR | MANGATTIDOM - KOTTAYAM CLUSTER | W-114-9-81-9500 | MICRO ENTERPRISES UNIT FOR KUDUMBASREE | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | MANGATTIDOM | YES | TANGIBLE | Completed | |
644 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-1-2-57039 | REPLACEMENT OF AC DISTRIBUTION MAIN PIPE WITH DI PIPES | PIPED WATER SUPPLY | BUILDING/ AUGMENTING/RENOVATING WATER BODIES (CANAL/WELL/ POND ETC.) | VENGAD | YES | INTANGIBLE | Completed | --- |
645 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-1-4-57034 | EXTENSION OF DISTRIBUTION SYSTEM PIPELINES IN PINARAYI VILLAGE | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PINARAYI | YES | INTANGIBLE | Completed | --- |
646 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-1-4-57038 | EXTENSION OF DISTRIBUTION SYSTEM PIPE LINES | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | VENGAD | YES | INTANGIBLE | Completed | --- |
647 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-134-57481 | KEEZHATHUR VCB | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | GUARD WALL FOR FARM FIELD/ WATER BODIES FOR AGRI PUPORSE/ LIVE STOCK CENTRE | VENGAD | YES | TANGIBLE | Completed | |
648 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-138-57452 | SIDE PROTECTION OF VELLUVAKKANDI STREAM THODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | PINARAYI | YES | TANGIBLE | Completed | |
649 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-138-57454 | CONSTRUCTION OF RETAINING WALL AND VCB AT KIZHAKKUMBHAGAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | PINARAYI | YES | TANGIBLE | Completed | |
650 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-146-57476 | PRODUCTION OF ORGANIC FOOD AND VEGETABLES | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | ORGANIC FARMING | VENGAD | YES | TANGIBLE | Completed | |
651 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-149-113922 | FRUITS PLANT DISTRIBUTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | PLANTATION (FRUIT AND OTHER, NOT FOR ENVIRONMENT PURPOSE) | VENGAD | YES | TANGIBLE | Completed | |
652 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-149-113932 | DEVELOPMENT OF INTER CROP | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | PLANTATION (FRUIT AND OTHER, NOT FOR ENVIRONMENT PURPOSE) | VENGAD | YES | TANGIBLE | Completed | |
653 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-149-113934 | PADDY CULTIVATION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | PLANTATION (FRUIT AND OTHER, NOT FOR ENVIRONMENT PURPOSE) | VENGAD | YES | TANGIBLE | Completed | |
654 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-149-57478 | PEPPER VILLAGE PROGRAMME | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | PLANTATION (FRUIT AND OTHER, NOT FOR ENVIRONMENT PURPOSE) | VENGAD | YES | TANGIBLE | Completed | |
655 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-149-57479 | COCONUT FARMING EXPANSION OF HIGH YIELD COCONUT SEEDLINGS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | PLANTATION (FRUIT AND OTHER, NOT FOR ENVIRONMENT PURPOSE) | VENGAD | YES | TANGIBLE | Completed | |
656 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-149-57480 | BANANA CULTIVATION PROGRAMME | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | PLANTATION (FRUIT AND OTHER, NOT FOR ENVIRONMENT PURPOSE) | VENGAD | YES | TANGIBLE | Completed | |
657 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-113938 | SIDE PROTECTION WALL TO MOUVERI THODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
658 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-113942 | SIDE PROTECTION WALL TO CHERIKKAL THODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
659 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-114075 | CONSTRUCTION OF VCB ACROSS KARADI THODU AT ILLATHANKANDI | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
660 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-114077 | RENNOVATION OF PANUNDAKULAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
661 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-114081 | RENNOVATION OF CHIRAYIL KULAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
662 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-57456 | RENOVATION OF OTHAYOTH POND | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
663 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-57462 | RENOVATION OF CHEMMARASSERY MAHADEVA KSHETRAKULAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
664 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-57466 | RENOVATION OF THANNUMANGALAM VISHNU KSHETRAKULAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
665 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-57469 | RENNOVATION OF CHERIKKAL KULAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
666 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-57482 | POND CONSTRUCTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | VENGAD | YES | TANGIBLE | Completed | |
667 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-74978 | SIDE PROTECTION WORK OF 12 THODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | VENGAD | YES | TANGIBLE | Completed | |
668 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-11-171-57492 | COMPUND WALL AT AKG SCHOOL | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | PINARAYI | YES | TANGIBLE | Completed | |
669 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-11-171-57493 | BUILDING FOR AKG SCHOOL | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | PINARAYI | YES | TANGIBLE | Completed | |
670 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-11-174-57495 | SCIENCE LAB AT VENGAD GHSS | EDUCATION | ESTABLISHMENT OF SCIENCE LABS | VENGAD | YES | TANGIBLE | Completed | |
671 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-12-192-74981 | HOMEO DISPENSARY CENTRE PARAPRAM | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | PINARAYI | YES | TANGIBLE | Completed | |
672 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-14-291-57513 | DIGITALISED PANCHAYAT ASSET MANAGEMENT SYSTEM IMPS | CITIZENS SERVICE CENTRES | DIGITIZATION OF RECORDS | VENGAD | YES | INTANGIBLE | Completed | --- |
673 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-14-291-57514 | DIGITALISED PANCHAYAT ASSET MANAGEMENT SYSTEM IMPS | CITIZENS SERVICE CENTRES | DIGITIZATION OF RECORDS | PINARAYI | YES | INTANGIBLE | Completed | --- |
674 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-17-338-74610 | FISH FARMING IN ARTIFICIAL POND | EMPLOYMENT GENERATION AND SHG FORMATION | FARM AND NON FARM LIVELIHOOD | VENGAD | YES | TANGIBLE | Completed | |
675 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-18-245-57486 | MALANAD NORTH MALABAR RIVER CRUISE TOURISM BOAT TERMINAL AT PARAPRAM | TOURISM PROMOTION | RAILING OR FLOATING JETTY OR WOODEN JETTY | PINARAYI | YES | TANGIBLE | Completed | |
676 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-2-17-57053 | COMMUNITY TOILET COMPLEX AT PANCHAYAT BUS STAND ANJARAKKANDY CIVIL WORK | SANITATION | BUILDING OF PUBLIC TOILETS (BUS STOP/MARKET/ OTHER IDENTIFIED PLACES ETC.) | VENGAD | YES | TANGIBLE | Completed | |
677 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-2-298-57041 | CONSTUCTION OF TOILET AT SARADA VILASAM JBS AND GANAPATHI VILASAM UPS | SANITATION | IEC ON SANITATION TOILET USAGE OTHER ACTIVITIES | PINARAYI | YES | TANGIBLE | Completed | |
678 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-2-298-57043 | NAPKIN VENDING MACHINE AND DESTROYER TO SIX UPS AND GOVT INSTITUTIONS | SANITATION | IEC ON SANITATION TOILET USAGE OTHER ACTIVITIES | PINARAYI | YES | TANGIBLE | Completed | |
679 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-2-298-57045 | SANITATION FACILITIES AT MAMBARAM UPS KEEZHATHUR UPS AND KUNNIRIKKA UPS | SANITATION | IEC ON SANITATION TOILET USAGE OTHER ACTIVITIES | VENGAD | YES | TANGIBLE | Completed | |
680 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-2-298-57047 | TOILETS FOR 2 UPS AND 3LPS | SANITATION | IEC ON SANITATION TOILET USAGE OTHER ACTIVITIES | VENGAD | YES | TANGIBLE | Completed | |
681 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-2-298-57050 | GIRLS FRIENDLY TOILETS FOR 6 SCHOOLS | SANITATION | IEC ON SANITATION TOILET USAGE OTHER ACTIVITIES | VENGAD | YES | TANGIBLE | Completed | |
682 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-20-300-57505 | STADIUM DEVELOPMENT | SPORTS INFRASTRUCTURE | PLAY GROUND OR STADIUM DEVELOPMENT AND RELATED ACTIVITIES | VENGAD | YES | TANGIBLE | Completed | |
683 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-3-25-114141 | RING COMPOST FOR HOUSEHOLDS | SOLID AND LIQUID WASTE MANAGEMENT | CONSTRUCTION OF COMMUNITY SOAK/ VERMI COMPOST PITS | PINARAYI | YES | TANGIBLE | Completed | |
684 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-3-36-57055 | PLASTIC BOTTLE COLLECTION BOOTH AT PANCHAYAT BUS STAND TOWNS AND MAIN ROADS | SOLID AND LIQUID WASTE MANAGEMENT | INSTALLATION OF DUSTBINS FOR DRY AND WET WASTE FOR COMMUNITY OR HOUSEHOLDS | PINARAYI | YES | TANGIBLE | Completed | |
685 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-3-36-57056 | WASTE MANAGEMENT AT SOURCE INSTALLATION OF RING COMPOSTING FOR HOUSE HOLDS WASTE MANAGEMENT | SOLID AND LIQUID WASTE MANAGEMENT | INSTALLATION OF DUSTBINS FOR DRY AND WET WASTE FOR COMMUNITY OR HOUSEHOLDS | VENGAD | YES | TANGIBLE | Completed | |
686 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-3-36-57058 | WASTE MANAGEMENT AT SOURCE INSTALLATION OF RING COMPOSTING FOR SCHOOLS AND TRANSFERED INSTITUTIONS | SOLID AND LIQUID WASTE MANAGEMENT | INSTALLATION OF DUSTBINS FOR DRY AND WET WASTE FOR COMMUNITY OR HOUSEHOLDS | VENGAD | YES | TANGIBLE | Completed | |
687 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-33-289-57496 | CONSTRUCTION OF PADANNAKKARA ANGANAWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PINARAYI | YES | TANGIBLE | Completed | |
688 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-33-289-57497 | CONSTRUCTION OF UMMENCHIRA ANGANAWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PINARAYI | YES | TANGIBLE | Completed | |
689 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-33-289-57498 | CONSTRUCTION OF KOZHUR BANIYAN COMPANY ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PINARAYI | YES | TANGIBLE | Completed | |
690 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-57060 | CONSTRUCTION OF 18 ROADS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
691 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74530 | KATTUMADAM JAYAN COMPANY ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
692 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74531 | MAYAVIPEEDIKA KAPPANAKAD ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
693 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74532 | MAHATHMA VAYANASHALA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
694 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74533 | PALAKANDI GTC ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
695 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74535 | KAPPANAKKAD PATTASHAP ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
696 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74541 | PANTHAKKAPARA STADIUM PUTHUSSERIMUKKU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
697 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74542 | ROAD TARRING OF SAFIYA MUKKU TO CHALIL THAZHE WARD X | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
698 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74543 | COMPANYMETTA PADINJITTAMMURI ROAD TARRING WARD XII | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
699 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74544 | THEKKINATH PARAMBATHMUKKU ROAD TARRING WARD XIV | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
700 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74546 | THOOKKUPALAM MANAKKADAVAN ROAD TARRING WARD XV | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
701 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74547 | KEEZHATHUR VAYANASALA RAYAROTH KAVU ROAD TARRING BALANCE PORTION WARD XVI | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
702 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74549 | MUNEER PEEDIKA ROAD TARRING WARD XVII | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
703 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74550 | KANDOTHMUKKU THADATHIL THAZHE ROAD TARRING WARD XVII | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
704 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74551 | MAKKUTTATHIL THAZHE KUZHICHAL ROAD TARRING WARD XVIII | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
705 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74553 | VILAYOD EMS VAYANASALA VYRIKHATHAKAN KSHETHRAM ROAD TARRING WARD XX | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
706 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74554 | PANCHAYATH KINAR CHIRAMMAL ROAD TARRING WARD XXI | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
707 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74962 | CONSTRUCTION OF 46 ROADS WITH DRAINS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
708 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-47-57100 | IMPROVEMENT OF SUB TRANSMISSION AND DISTRIBUTION NETWORK | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | PINARAYI, VENGAD | YES | TANGIBLE | Completed | |
709 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-49-57095 | EXTENSION OF STREET MAIN PINARAYI ELECTRICAL SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | PINARAYI | YES | TANGIBLE | Completed | |
710 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-49-57097 | EXTENSION OF STREET MAIN VENGAD SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | VENGAD | YES | TANGIBLE | Completed | |
711 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-49-74772 | EXTENSION OF STREET MAINKADIRUR ELECTRICAL SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | PINARAYI | YES | TANGIBLE | Completed | |
712 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-49-74773 | EXTENSION OF STREET MAIN VENGAD ELECTRICAL SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | PINARAYI | YES | TANGIBLE | Completed | |
713 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-49-74774 | EXTENSION OF STREET MAIN PINARAYI SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | VENGAD | YES | TANGIBLE | Completed | |
714 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-49-74775 | EXTENSION OF STREET MAIN CHAKKARAKKAL SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | VENGAD | YES | TANGIBLE | Completed | |
715 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-53-57096 | ESTABLISHMENT OF STREET LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PINARAYI | YES | TANGIBLE | Completed | |
716 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-53-57098 | ESTABLISHMENT OF STREET LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | VENGAD | YES | TANGIBLE | Completed | |
717 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-55-57101 | ESTABLISHMENT OF SOLAR POWER PLANTS AT ROOF TOPS OF VARIOUS BUILDINGS UNDER GP ONGRID | VILLAGE STREET LIGHTS AND ELECTRIFICATION | SOLAR PLANT INTEGRATED WITH GRID LINES OR WITHOUT GRID | VENGAD | YES | TANGIBLE | Completed | |
718 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-56-57084 | BRIDGE TO CONNECT VELLUVAKKANDIKULAM CHETTYARAMBATH PC DOCTORMUKKU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION OF BRIDGE FOR INTER VILLAGE CONNECTIVITY | PINARAYI | YES | TANGIBLE | Completed | |
719 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-58-57082 | FOOTPATH CONSTRUCTION | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/ UPGRADATION OF PEDESTAL FOOTPATH ON INTER VILLAGE ROADS | PINARAYI | YES | TANGIBLE | Completed | |
720 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-114084 | HEALTH CENTRE MEETHALE VALAPP ROAD TARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
721 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57070 | 7 FLOOD ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
722 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57073 | PARAPRAM AMBUPEEDIKA SCHOOL PUZHAKKARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
723 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57074 | KATTILPEEDIKA ACHAN VEEDU | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
724 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57076 | EDAKKADAVU PUTHIYAPALAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
725 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57077 | ANDALOORKADAV PALAM BAALERI VEEDU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
726 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57078 | KULANGAROTH AP LAKSHMANAN ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
727 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57079 | PANDYALAMUKKU RAYAROTH POYIL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
728 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57081 | ARAYALTHARA THUNDIKANDI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
729 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57083 | PARAPRAM BANK ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
730 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57085 | EDAKKADAV PUTHIYAPALAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
731 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57086 | KINAVAKKAL PATHIRIYAD CHAMPAD ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
732 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57090 | CHERUVARIMUKKU PARAMBAYI PALLI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
733 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57092 | ROAD MAINTENANCE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
734 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57093 | ROAD CONSTRUCTION VENMANAL MULAMKANDAM ROAD TARRING WARD I | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
735 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57094 | KOLASSERRY KAYALODE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI, VENGAD | YES | TANGIBLE | Completed | |
736 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74654 | THUNDIKANDIKETTU MUTHAL MUNDAYIL THAZHE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
737 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74655 | THAMBIPEEDIKA KUNJAMBU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
738 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74656 | ERANCHERI KARALIKKADU LAKSHAM VEEDU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
739 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74658 | PUTHUSSERI KELOTHUMUKKU VAYALIL THAZHE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
740 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74659 | PUTHANKANDAM KAITHERI PUTHIYEDATH ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
741 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74660 | KETHARAM KOZHUR VAYAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
742 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74661 | VELANDIMUKKU SAFDAR HASHMI CLUB ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
743 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74662 | OLAYIKKARA TRANSFORMER KANNUR KUTHUPARAMBA TOUCH ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
744 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74663 | KOOTHUPARAMB RAKTHASAKSHI MANDAPAM SANTHI NAGAR ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
745 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74664 | PANUNDA AGRICULTURAL BHAGAT SINGH CENTRE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
746 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74665 | POTTANPARA CHAMALI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
747 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74666 | MULLANKUNNU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
748 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74667 | PUTHUSSERIMUKKU NAYANAR SMARAKA MANDHIRAM MUNVASHAM KODAKKAT VAYAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
749 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74668 | MAMMALIYIL THAZHE SREEDHARAN PEEDIKA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
750 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74669 | KUNJIPALLI KOTTARATHIL THAZHE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
751 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74670 | PULIYANDI MUKKU MUNNOTANTAVDE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
752 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74671 | KINAVAKKAL MUKKU THAIPARAMBIL | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
753 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74672 | THERU ANGANVADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
754 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74673 | EMS ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
755 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74674 | CHEKIKUNIPALAM KUNNUMMAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
756 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74675 | ERANJIYULLATHIL KOZHUR VAYAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
757 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74676 | ROAD TARRING OF KALLAYI PUBLIC WELL TO PALLIKKAL ROAD WARD II 300M | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
758 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74678 | ROAD TARRING FOR SUNNICENTRE INJIYIL ROAD FROM CHAINAGE 0200KM TO 0465KM WARD III | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
759 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74680 | ROAD TARRING IN HEALTH CENTRE ANGANVADI FROM CHEMBAN MUKKU TO SEEDFARM VAYAL WARD V | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
760 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74681 | KURYODE SEED FARM VAYAL ROAD WARD V | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
761 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74682 | VENGAD GP PALLIKKAD KALLUPRATHMUKKU SEED FARM VAYAL ROAD WARD V | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
762 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74683 | ROAD TARRING OF URPALLI KURYOD URAVUKUNDU ROAD WARD V | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
763 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74684 | ROAD TARRING OF URPALLI SCHOOL ROAD WARD VI | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
764 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74686 | ROAD TARRING OF KIZHAKKE NIRATHTHVERUKANDY ROAD TARRING WARD VIII | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
765 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74687 | ROAD TARRING SANKARANELLUR CHANDROTH THAZHE ROAD WARD IX | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
766 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74688 | ROAD TARRING OF PATHIRIYAD HIGH SCHOOL TO GURUDEVI KSHETHRAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
767 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74689 | PVS GRAMEEN VAYANASHALA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
768 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74690 | ROAD TARRING OF DEVAR KOTTAM TO CHETTUKUNDUNNAL THAZHE ROAD WARD X | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
769 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74691 | ROAD TARRING OF KGMUKKU TOKASHANA PARAMB ROAD WARD X | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
770 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74692 | PACHA POYIKA PUNNAD STADIUM ROAD WARD XI | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
771 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74693 | NALLAKKANDY MUKKU MELEKAYALOD ROAD TARRING WARD X | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
772 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74694 | SREE NARAYANA KANALKARA ROAD TARRING WARD XII | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
773 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74695 | SIVAPRAKASHAM UP SCHOOL CHAMUNDESHWEARI ROAD TARRING WARD XIII | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
774 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74963 | KUNNUNCHAL MADAPPURA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
775 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74964 | ERANCHERI PUTHANKANDAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
776 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74965 | PULARI CLUB ANGANVADI ROAD TO KUZHIYILE PEEDIKA | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
777 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74966 | KOROTH KRISHNAN ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
778 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74967 | PARAMBAN MADAPPURA CANAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
779 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74968 | ANNERIYIL THAZHE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
780 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74974 | CHALIL MADAPPURA KALLU SHOP ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
781 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74976 | PUTHIYOTTILAKAD ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
782 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74977 | PINARAYI WEST ANGANVADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
783 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-75217 | CONSTRUCTION OF 67 ROADS | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
784 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-75307 | KATTILPEEDIKA KUNIYIL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
785 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-75312 | THUNDIKANDIKETTU ARAYALTHARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
786 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-10-146-61440 | BIO VEGETABLES PRODUCTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | ORGANIC FARMING | NEDUMPANA | YES | TANGIBLE | Completed | |
787 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-10-146-61441 | BIO VEGETABLE PRODUCTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | ORGANIC FARMING | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
788 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-10-302-61435 | WELL RECHARGE | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | NEDUMPANA | YES | TANGIBLE | Completed | |
789 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-10-302-61446 | CHILAVOORKONAM ELA BUND | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | NEDUMPANA | YES | TANGIBLE | Completed | |
790 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-10-302-61448 | PALAKKULAM POND | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | NEDUMPANA | YES | TANGIBLE | Completed | |
791 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-10-302-61493 | RENOVATION OF THALACHIRA BUND | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
792 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-10-302-73282 | CHILAVOORKONAM POND | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | NEDUMPANA | YES | TANGIBLE | Completed | |
793 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-10-302-73283 | KOKKOTTUCHIRA POND | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | NEDUMPANA | YES | TANGIBLE | Completed | |
794 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-10-302-77734 | RENNOVATION OF CHERIYAMPANATTU KULAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
795 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-10-302-77739 | RENNOVATION OF OOTTUKUZHIKULAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
796 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-10-302-78179 | PROTECTING THE ERRODED LEFT BANK OF PALLIMON RIVER NEAR KUNDUMON CROSS BAR AND PUMPHOUSE IN NEDUMPANA PANCHAYATH | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | NEDUMPANA | YES | TANGIBLE | Completed | |
797 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-10-90-61443 | DEVELOPMENT OF FALLOW LAND FOR CULTIVATION OF CROP | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | AGRICULTURE LAND DEVELOPMENT | NEDUMPANA | YES | TANGIBLE | Completed | |
798 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-11-171-61536 | MUTTAKKAVU GLPS NEW BLOCK | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | NEDUMPANA | YES | TANGIBLE | Completed | |
799 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-11-171-61538 | PALLIMON GOVT HS RENOVATION INCLUDING SMARTCLASSES AND FURNITURE | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | NEDUMPANA | YES | TANGIBLE | Completed | |
800 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-11-171-61540 | NALLILA GOVT UPS NEW BUILDING | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | NEDUMPANA | YES | TANGIBLE | Completed | |
801 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-11-187-61548 | SMART CLASS ROOM AT MUKATHALA GLPS 5 NOS | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
802 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-12-195-61515 | INFRASTRUCTURE FACILITIES FOR COMMUNITY HEALTH CENTER | HEALTH | CONSTRUCTION/UPRADATION OF PHC | NEDUMPANA | YES | TANGIBLE | Completed | |
803 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-12-195-61532 | PHC SUBCENTER | HEALTH | CONSTRUCTION/UPRADATION OF PHC | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
804 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-12-196-61519 | 2 SUBCENTER FOR PHC | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | NEDUMPANA | YES | TANGIBLE | Completed | |
805 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-2-18-60898 | PUBLIC TOILET AT GP OFFICE | SANITATION | CONSTRUCTION OF TOILETS IN GOVERNMENT BUILDING (SCHOOL/SC/PHC/CHC/GP/ANGANWADI ETC.) | NEDUMPANA | YES | TANGIBLE | Completed | |
806 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-21-312-61563 | DEVELOPMENT OF VALIYAVILA COLONY IN WARD 16 | SOCIAL INFRASTRUCTURE | SOCIAL ASSISTANCE TO WOMEN CHILD OLD AGE AND OTHER VULNERABLE SECTION OF SOCIETY | NEDUMPANA | YES | TANGIBLE | Completed | |
807 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-21-312-73284 | DEVELOPMENT OF THUNDUVILA COLONY IN WARD 1 | SOCIAL INFRASTRUCTURE | SOCIAL ASSISTANCE TO WOMEN CHILD OLD AGE AND OTHER VULNERABLE SECTION OF SOCIETY | NEDUMPANA | YES | TANGIBLE | Completed | |
808 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-21-312-73286 | DEVELOPMENT OF KATTUVILA COLONY IN WARD 11 | SOCIAL INFRASTRUCTURE | SOCIAL ASSISTANCE TO WOMEN CHILD OLD AGE AND OTHER VULNERABLE SECTION OF SOCIETY | NEDUMPANA | YES | TANGIBLE | Completed | |
809 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-21-312-73287 | DEVELOPMENT OF PUSHPAMVILA COLONY IN WARD 22 | SOCIAL INFRASTRUCTURE | SOCIAL ASSISTANCE TO WOMEN CHILD OLD AGE AND OTHER VULNERABLE SECTION OF SOCIETY | NEDUMPANA | YES | TANGIBLE | Completed | |
810 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-3-25-61002 | COMPOSIT PIT IN INDIVIDUAL HH | SOLID AND LIQUID WASTE MANAGEMENT | CONSTRUCTION OF COMMUNITY SOAK/ VERMI COMPOST PITS | NEDUMPANA | YES | TANGIBLE | Completed | |
811 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-3-40-61013 | RESOURCE RECOVERY FACILITY | SOLID AND LIQUID WASTE MANAGEMENT | VEHICLES/EQUIPMENTS FOR COLLECTING WASTE FROM HOUSEHOLDS/COMMON DUSTBIN | NEDUMPANA | YES | TANGIBLE | Completed | |
812 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-3-40-61017 | MATERIAL COLLECTION FACILITY | SOLID AND LIQUID WASTE MANAGEMENT | VEHICLES/EQUIPMENTS FOR COLLECTING WASTE FROM HOUSEHOLDS/COMMON DUSTBIN | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
813 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-33-285-61557 | BUDS SCHOOL CONSTRUCTION | SOCIAL WELFARE | CONSTRUCTION/RENOVATION OF BUDS/PLAY SCHOOL | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
814 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-33-288-61559 | DAY CARE CENTRE PAKALVEEDU AT 14 TH WARD | SOCIAL WELFARE | CONSTRUCTION OF OLD AGE SHELTER/HOME | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
815 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-33-289-61555 | CONSUTRUCTION OF ANGANWADI NO 80 AT WARD 10 | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | NEDUMPANA | YES | TANGIBLE | Completed | |
816 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-33-289-77740 | CONSUTRUCTION OF ANGANWADI NO 115 AT WARD 20 | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | NEDUMPANA | YES | TANGIBLE | Completed | |
817 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-5-49-61294 | STREET MAIN EXTENSION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | NEDUMPANA | YES | TANGIBLE | Completed | |
818 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-5-49-61300 | STREET MAIN EXTENSION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
819 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-5-53-61297 | LED MINIMAST LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | NEDUMPANA | YES | TANGIBLE | Completed | |
820 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-5-53-61299 | LED STREET LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | NEDUMPANA | YES | TANGIBLE | Completed | |
821 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-5-53-61302 | MINI MAST LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
822 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-61032 | METALLING AND TARRING OF ROADS VARIOUS PWD ROADS | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NEDUMPANA | YES | TANGIBLE | Completed | |
823 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-61034 | CLAYMINES KARUMANTAZHIKAM NAVAJEEVAN PAKISTANMUKKU MUDEECHIRA KULAPPADAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NEDUMPANA | YES | TANGIBLE | Completed | |
824 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-61039 | UMAYANALLOOR KALLUVETTANKUZHY ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
825 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-72401 | EMS JN PLAMOOTTIL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NEDUMPANA | YES | TANGIBLE | Completed | |
826 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-72405 | KOCHUMANDAKKATTU ELAVOOR LPS ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NEDUMPANA | YES | TANGIBLE | Completed | |
827 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-72406 | KOLLICOMPANY PANAKKTTUCHIRA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NEDUMPANA | YES | TANGIBLE | Completed | |
828 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-72407 | KODUMON ELA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NEDUMPANA | YES | TANGIBLE | Completed | |
829 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-72408 | MALAVAYAL KOTTUPPARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NEDUMPANA | YES | TANGIBLE | Completed | |
830 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-72409 | SANTHALAYAM VALLUVANTHARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NEDUMPANA | YES | TANGIBLE | Completed | |
831 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-72416 | KANIYANTHODU ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
832 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-77746 | CONSTRUCTION OF SIDE WALL AND CONCRETING FOR GKSERVICE STATION PAVOORPANA KALLUPALAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
833 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-77748 | CHERIYAMPANATTUKULAM THAZHIYILIRA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
834 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-77750 | THOPPIL COLONY ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
835 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-77751 | MARTHANDAM KOTTAMURY PALATHARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
836 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-77753 | ALUMMOTTILKULAM KALLUPALAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
837 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-77756 | LIBRARY KOCHU DECENT JUNCTION ROAD CONCRETE AND INTERLOCK | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
838 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-77757 | CHAMATHADAM ROAD INTERLOCK | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
839 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-6-59-78076 | KURISSADI CID ROAD CONCRETE AND INTERLOCK | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | THRIKKOVILVATTOM | YES | TANGIBLE | Completed | |
840 | KERALA | KOLLAM | NEDUMPANA - THRIKKOVILVATTOM CLUSTER | W-246-9-79-61319 | PAPER BAG UNIT | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | NEDUMPANA | YES | TANGIBLE | Completed | |
841 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-1-4-15415 | NRDWP KWA WATER SCHEME | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PUTHUPPALLY | YES | TANGIBLE | Completed | |
842 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-1-4-15418 | EXTENSIONS OF HH CONNECTIONS | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PUTHUPPALLY | YES | TANGIBLE | Completed | |
843 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-1-4-5646 | NRDWP KWA SCHEME | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | MANNARKADU | YES | TANGIBLE | Completed | |
844 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-1-4-5666 | EXTENSION OF HH CONNECTIONS | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | MANNARKADU | YES | TANGIBLE | Completed | |
845 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-1-4-78170 | PIPELINE EXTENSION FOR WARD 1 TO 9 AND 13 TO 19 | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PUTHUPPALLY | YES | TANGIBLE | Completed | |
846 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-111-10675 | BUND CONSTRUCTION AND VCB | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | CONTOUR BUND | PUTHUPPALLY | YES | TANGIBLE | Completed | |
847 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-138-10665 | IMPROVEMENT TOVELLOR THODU FROM MALAMTO METHAPRAMBU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | MANNARKADU | YES | TANGIBLE | Completed | |
848 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-138-78114 | IMPROVEMET TO VELLOOR THODU FROM METHAPARAMPU TO PALAMURY PALAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | MANNARKADU | YES | TANGIBLE | Completed | |
849 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-138-78119 | IMPROVEMENT TO VELLOOR THODU FROM METHAPPARAMBU TO PALAMURI PALAM2ND REACH | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | MANNARKADU | YES | TANGIBLE | Completed | |
850 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-138-78122 | IMPROVEMENT TO VELLOOR THDU FROM PALAMURI PALAM TO KAITHAKETTU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | MANNARKADU | YES | TANGIBLE | Completed | |
851 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-138-78124 | IMPROVEMENT TO VELLOR THODU FROM PALLITHODU UPSTREAM OF VANDANATHUPADI | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | MANNARKADU | YES | TANGIBLE | Completed | |
852 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-138-78127 | IMPROVEMENT TO KATTUTHODU AND PAZHAMPALA THODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | MANNARKADU | YES | TANGIBLE | Completed | |
853 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-138-78129 | IMPROVEMENT TO IRATTUNADA THODU FROM IRATTUNADA PALAM TO KAITHAKETTU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | MANNARKADU | YES | TANGIBLE | Completed | |
854 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-295-9755 | WELL RECHARGING | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | PUTHUPPALLY | YES | TANGIBLE | Completed | |
855 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-302-10695 | KODUR RIVER RENOVATION KOTTARATHIL KADAVU PUTHUPPALLY CHURCH TO MOONNATTUMUKKU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PUTHUPPALLY | YES | TANGIBLE | Completed | |
856 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-302-10721 | MEENACHILAR MEENANTHARAYAAAR RENOVATION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | MANNARKADU | YES | TANGIBLE | Completed | |
857 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-302-78140 | KODUR RIVER RENOVATION KOTTARATHIL KADAVU IRAVINALLOOR TO MONNATTUMUKKU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PUTHUPPALLY | YES | TANGIBLE | Completed | |
858 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-302-78141 | KODUR RIVER RENOVATION KOLLATHODU PADATHU PARYIL THODU KANNUKUZHY THODU CHERUTHODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PUTHUPPALLY | YES | TANGIBLE | Completed | |
859 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-302-78143 | KODUR RIVER RENOVATION UNDER KANNUKUZHY BRIDGE KANNUKUZHY THODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PUTHUPPALLY | YES | TANGIBLE | Completed | |
860 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-302-9760 | REJUVENATION CLEANING OF VARIOUS WATER CHANNELS SOURCES PONDS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PUTHUPPALLY | YES | TANGIBLE | Completed | |
861 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-98-78109 | CHECKDAM CONSTRUCTED IN WARD 7MAROTTIPUZHA ALIPPUZHA THODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | CHECK DAM | MANNARKADU | YES | TANGIBLE | Completed | |
862 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-98-9771 | CONSTRUCTION OF CHECK DAM IN VARIOUS STREAMS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | CHECK DAM | PUTHUPPALLY | YES | TANGIBLE | Completed | |
863 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-10-98-9780 | CONSTRUCTION OF CHECK DAM IN WARD 5 PARAPPALLYKUNNU VELLOR THODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | CHECK DAM | MANNARKADU | YES | TANGIBLE | Completed | |
864 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-11-171-15427 | KANIYAMKUNNU GOVT UPS UPGRADATION | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | MANNARKADU | YES | TANGIBLE | Completed | |
865 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-11-171-15429 | MANARCADU GOVT L PS MAINTANANCE | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | MANNARKADU | YES | TANGIBLE | Completed | |
866 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-11-171-7649 | UPGRADATION OF MALAM GOVT SCHOOL | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | MANNARKADU | YES | TANGIBLE | Completed | |
867 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-11-171-7670 | MANNARCAD GOVT UPS NEW BUILDING | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | MANNARKADU | YES | TANGIBLE | Completed | |
868 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-11-171-7743 | PUTHUPALLY GOVT LPS MAINTENANCE | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | PUTHUPPALLY | YES | TANGIBLE | Completed | |
869 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-11-171-7776 | ERICADU GOVT UPS MAINTENANCE | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | PUTHUPPALLY | YES | TANGIBLE | Completed | |
870 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-11-171-7791 | PARIYARAM GOVT UPS MAINTENANCE | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | PUTHUPPALLY | YES | TANGIBLE | Completed | |
871 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-11-171-7821 | ST GEORGE GHSS MODEL SCHOOL PROJECT | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | PUTHUPPALLY | YES | TANGIBLE | Completed | |
872 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-12-192-5793 | CONSTRUCTION MAINTENANCE OF AYURVEDA HOSPITAL | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | MANNARKADU | YES | TANGIBLE | Completed | |
873 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-12-192-6056 | CONSTRUCTION AND MAINTENANCE OF HOMEO HOSPITAL | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | MANNARKADU | YES | TANGIBLE | Completed | |
874 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-12-192-6059 | EXTENSION OF AYURVEDA HOSPITAL | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | PUTHUPPALLY | YES | TANGIBLE | Completed | |
875 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-12-195-5776 | CONSTRUCTION OF PHC EQUIPMENTS AMENITIES | HEALTH | CONSTRUCTION/UPRADATION OF PHC | MANNARKADU | YES | TANGIBLE | Completed | |
876 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-12-196-15422 | SUB CENTRE PHC | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | PUTHUPPALLY | YES | TANGIBLE | Completed | |
877 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-12-200-6061 | MOBILE HEALTH UNIT | HEALTH | MOBILE HEALTH UNIT | PUTHUPPALLY | YES | TANGIBLE | Completed | |
878 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-13-292-5606 | CONSTRUCTION OF COMPUTER LAB | DIGITAL LITERACY | CONSTRUCTION OR UPGRADATION OR PROVISION OF EQUIPMENTS IN SMART CLASSROOM | MANNARKADU | YES | TANGIBLE | Completed | |
879 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-13-292-5622 | CONSTRUCTION OF COMPUTER LAB | DIGITAL LITERACY | CONSTRUCTION OR UPGRADATION OR PROVISION OF EQUIPMENTS IN SMART CLASSROOM | PUTHUPPALLY | YES | TANGIBLE | Completed | |
880 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-14-213-9697 | CONSTRUCTION OF FRONT OFFICE TOUCH SCREEN KIOSK HELP DESK | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | MANNARKADU | YES | TANGIBLE | Completed | |
881 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-14-291-53024 | DIGITAL PANCHAYATH ASSET MANAGEMENT SYSTEM IN MANARCADU | CITIZENS SERVICE CENTRES | DIGITIZATION OF RECORDS | MANNARKADU | YES | TANGIBLE | Completed | |
882 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-18-235-11909 | DEVELPOMENT OF NALUMANIKATTU | TOURISM PROMOTION | AGRI TOURISM | MANNARKADU | YES | TANGIBLE | Completed | |
883 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-21-314-53027 | CONSTRUCTION OF MINICIVIL STATION | SOCIAL INFRASTRUCTURE | ASSETS CREATED FOR COMMUNITY USAGE | PUTHUPPALLY | YES | TANGIBLE | Completed | |
884 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-3-33-5727 | CONSTRUCTION OF INCINERATOR FURNACE | SOLID AND LIQUID WASTE MANAGEMENT | INFRASTRUCTURE DEVELOPMENT FOR CENTRALISED SOLID WASTE MANAGEMENT | MANNARKADU | YES | TANGIBLE | Completed | |
885 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-33-289-7865 | FORMATION OF 7 DIGITAL MODERN AGANWADIES | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PUTHUPPALLY | YES | TANGIBLE | Completed | |
886 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-33-289-7874 | ANGANWADI CONSTRUCTION | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PUTHUPPALLY | YES | TANGIBLE | Completed | |
887 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-5-50-7566 | NEW OVERHEAD SERVICE CONNECTION 11 KV | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRIFICATION OF COMMUNITY/GOVERNMENT BUILDINGS (SCHOOLS/SC/PHC/CHC/GP BUILDING/BUS STOP ETC.) | PUTHUPPALLY | YES | TANGIBLE | Completed | |
888 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-5-53-7591 | LINE EXTENTION FOR PUTHUPPALLY SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUTHUPPALLY | YES | TANGIBLE | Completed | |
889 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-5-53-7616 | PROVIDING STREET LIGHT LED 70KM | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | MANNARKADU | YES | TANGIBLE | Completed | |
890 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-5-53-78189 | LED PURCHASE | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | MANNARKADU | YES | TANGIBLE | Completed | |
891 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-5-53-78201 | LINE EXTENSION OF VAKATHANAM SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUTHUPPALLY | YES | TANGIBLE | Completed | |
892 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-5-53-78202 | LINE EXTENSION OF PAMPADY SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUTHUPPALLY | YES | TANGIBLE | Completed | |
893 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-5-53-78205 | LINE EXTENSION OF MEENADAM SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUTHUPPALLY | YES | TANGIBLE | Completed | |
894 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-5-53-78214 | LINE EXTENSION OF MANARCADU SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUTHUPPALLY | YES | TANGIBLE | Completed | |
895 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78158 | NILAKKAL PALLIPADI HEALTH CENTRE FOOT PATH CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
896 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78160 | MARANKALAKALAPURACKAL ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
897 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78161 | ENJAKKATTUKUNNU KONAKARI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
898 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78162 | PONGANPARA KARIKKAMATTOM ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
899 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78163 | PAOOMTTAM KATTATHARA ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
900 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78164 | PUTHUPPALLY KAVALA KEEZHATTUMKUNNU ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
901 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78165 | POLACHIRAPADYVALLYAZHAM ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
902 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78166 | INCHAKKTTUPADI SME ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
903 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78168 | CHOORAMPALLY MALLIPADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
904 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78169 | GOSPEL CENTRE DONBOSCO ROAD CONCRETINGO | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
905 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78171 | SEEYON KUNNU PARUTHHOOR ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
906 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78173 | PALOORPADI MANIYAMPADAM PADASEKHARAM ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
907 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78174 | KALARICKAL AMBALAM PALOOR ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
908 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78176 | KALLADAPADI MADATHILPADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
909 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78178 | PEDIYKATTUPADI KOLATHU ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
910 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78180 | IRAVINALOOR PALAM UDIKKAMALA ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
911 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78182 | KUNNEL PARAMBU ANGANAWADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
912 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78183 | OTHARAPPADI THALAKKOTTU CHALIL ELLUKALA ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
913 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78184 | MOONUPLACKAL PARAYIL ROAD CONCRETING ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
914 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78185 | MATTATHIL KUZHIKANDATHIL ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
915 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78186 | AMMUKUNNU ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
916 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78187 | VALLIMALA CHERIYA PARAMBIL PADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
917 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78188 | IHRD VATTACHANACKAL ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
918 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78190 | KIZHAKKEPARAMBU PADI MUNDAPUZHAPADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
919 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78192 | KIZHAKKEKKUZHY PUTHARIPRA ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
920 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78198 | MUKKUVBANPADI THONDUKANDAM PADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
921 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78199 | PINNAKKUMALA BHAJANASANGAM ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
922 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78200 | AAKKAMKUNNU MUTHALUPADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
923 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78204 | PAZHAYIDATHUPADI VAZHEPARAMBU PADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
924 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78206 | POOTTUCHIRAPADI CHATTHAMPADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
925 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78207 | KEECHAL VENNASSERY ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
926 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78208 | POYKAYIL PADI CHEERAMKULAM ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
927 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78210 | MANNATHIMATTAM CHIRATTELPARAMBU PADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
928 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78211 | MALAKUNNAM PADI KAKKATUPARAMBIL PADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
929 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78213 | KALAYIL PADI KOLASSERI PADASEKHARAM ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
930 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78216 | RENNOVATION OF NARIMATTAM PADI MEENADAM TM UPS ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
931 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78218 | PALIPPADI AATTANCHERI PADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
932 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78220 | PAYYAPPADI KEECHAL PEEDI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
933 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78222 | VETTATHUPADI PANDARAKUNNEL PADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
934 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78225 | CHENGALAKKATTUPADI VAYALATTU PADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
935 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78228 | STATEBANK NIRAVATHU PADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
936 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78229 | KUNNELPADI KADAPRAKUNNEL ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
937 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78230 | KOLLAMPARAMBIL PLAKKALPADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
938 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78231 | CHENGALAKKATTUPADI PALAKKAL PADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
939 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78232 | KEERTHI CLUB KONAKARI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
940 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78233 | THOOMBIL PADI MAMMOOTIL PADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
941 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78234 | PATTAMADATHIL PADI KALIMALA ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
942 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78235 | KRISHIBHAVAN THYKKODATHUPADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
943 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78236 | CONSTRUCTION OF MOTHER SAVEENA LAKSHAM VEEDU COLONY LINK ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
944 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78237 | PARAKKAL KADAVU KAROTHU KADAVU ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
945 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78246 | SNDP KARATTIL KADAVU ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
946 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78247 | KAVUNKAL PADI KARIMBU KADUPPIL ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
947 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78248 | PALAKKOTTUPADI KALAPPURAKKALPADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
948 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78249 | VETTATHUKAVALA KUNNUMPURAM ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
949 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78250 | MODAYILPADI PUTHENPALLI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
950 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78251 | VETTATHUPADI PALIPADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
951 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78252 | MOTHER SAVEENA LAKASHAM VEEDU COLONI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
952 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78253 | MOOLAMKULAM COLONY ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
953 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78254 | CONSTRUCTION OF DRAINAGE ACROSS THALAPPADI PUMB HOUSE FOOTPATH | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
954 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78255 | PALAYKKALODIPADI VENNASSERI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
955 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78256 | MALAKUNNAM COLONYI KAKKATUPARAMBIL PADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
956 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78257 | AARATTU CHIRA NARAKATHODU RETARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
957 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78258 | PALAKKAL PADI VADAKKEKKARA ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
958 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78259 | NADUKKOTTILPADI MADATHILPADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
959 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78260 | MANJATHURUTHEPADI VADAKKEKKARA ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
960 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78261 | CHALUNKALPADI MAMMOOTTIL PADI ROAD RETARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
961 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78262 | PERUVELIPADI CHIRAKKIPADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
962 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78263 | VETTATHUKAVAVALA PRIYADARSHINI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
963 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78264 | RENNVATION OF CHALUM THALAKKALPADI TM UPS ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
964 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78265 | THIDUPPILPADI KATTUMATTAM ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
965 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78266 | MUNDAKKALPADI VEMBALA CULVERT ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
966 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78267 | CONSTRUCTION OF PROTECTION WALL IN THAMARAVELIPALAM CHAKKALAPDI ROAD ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
967 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78268 | PALLATHRA ROAD AATTANCHERI APDI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
968 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78269 | MALLIYILPADI PALIYIL PADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
969 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78270 | VELANKUNNU MADATHILPADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
970 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78271 | DAIVAMUKKU KENDRAMANGALAM ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
971 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78272 | KAKKATTUPADI KAMBAKAMTHATTU ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
972 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78273 | THADATHIL PULINTHANATHUPADI ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
973 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78274 | ST THOMAS SCHOOL SAMSKRUTHAM SCHOOL ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
974 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78275 | KUZHIPARAMBU IRATHEDATHU PADI ROAD INTERLOCKING WARD 17 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
975 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78276 | KUNNELPRAMBU SEEYON KUNNU ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
976 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78277 | INTERLOCKING OF KUZHPIARAMBU IRATHEDATHUPADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
977 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78278 | CONCRETING OF THAZHTHIKKARAPORIYANTRAMATTOM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
978 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78279 | CONCRETING OF KADUVAKUZHY PERUMALOORKUNNU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
979 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78280 | CONCRETING AND RETARRING OFKAITHAMATTOM POOTTUHIRA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
980 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78281 | CONCRETING OF CHELAKUNNU KURISUOOROTTUPADY ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
981 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78282 | CONCRETING OF SANKARASHERITHANNIVELILKANIYAMPARAMBU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
982 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78283 | CONCRETING OF MAALAM WAITING SHED PERUMANAKUNNELPPADY ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
983 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78284 | CONCRETING OF HOMEO HOSPITAL POKKANAMAATAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
984 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78285 | CONCRETING OF INCHIKKALPPADY VELLIMADOMKUNNU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
985 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78286 | RETARRING AND BERM CONCRETING OF IRATTUNADAKUTTICKATTUPADY ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
986 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78287 | CONCRETING OF MOOLEPEDIKAPARAMADA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
987 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78288 | CONCRETING OF KUMBALAPALLIPADYPALIYAMPADY ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
988 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78289 | CONCRETING OF MAZHUVANCHERIPADYKALAPURACKAL | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
989 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78290 | CONCRETING OF MANAVATHUPADIMAZHUVANCHERIPADY ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
990 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78291 | CONCRETING OF VANDANATHU PADIPEEDIYEKKAL PADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
991 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78292 | CONCRETING OF ELAPPUNKALPADIVALATHATTUPADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
992 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78294 | CONCRETING OF PULIYAYIPADY AALAKAPARAMBU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
993 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78296 | CONCRETING OF THEKKUMBHAGAMMOOLAKUNNU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
994 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78298 | CONCRETING OF KAZHANJITHARAPULLATTUPADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
995 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78299 | CONCRETING OF MALAM SCHOOL RATIONKADAPADIKUNNELPADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
996 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78300 | CONCRETING OF BROOSILY CLUBEDAKAROTTUPADY ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
997 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78301 | CONCRETING OF PALAKOTTUPADY THEKKEMAILAKKADU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
998 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78302 | CONCRETING OF KAYIPALLYVATHALOOR ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
999 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78303 | CONCRETING OF PALATHINKALPADI KUNNELPADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
1000 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78305 | CONCRETING OF ETTIYADATHUCOLLAGE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
1001 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78306 | CONCRETING OF THADATHIMAKKALPADITHOTTATHILPADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
1002 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78307 | CONCRETING OF POTHANICKAL INCHIKKALA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
1003 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78308 | CONCRETING OF PALAMURIPALLIKULAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
1004 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78309 | CONCRETING OF ANUGRAHA NAGAR ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
1005 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-78311 | CONCRETING OF THOTTATHILPADI KALLUVETTAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
1006 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-8207 | CONSTRUCTION OF ROADS NH 183 THIRUVANCHOOR ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
1007 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-8217 | CONCRETING OF THUNDIYILPPADYPULIPRAKUNNU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
1008 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-8399 | VARIOUS ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
1009 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-8425 | KADAMURY THRIKOTHAMANGALAM ROAD CONSTRUCTION MAINTENANCE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
1010 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-8437 | CONSTRUCTION OF ROADS SH 9PUTHUPALLY BYPASS | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
1011 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-8468 | PALLIKIZHAKKETHIL ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUTHUPPALLY | YES | TANGIBLE | Completed | |
1012 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-6-59-8505 | CONCRETING OF NJARACKALPADY PALLIKUNNU SMASANAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | MANNARKADU | YES | TANGIBLE | Completed | |
1013 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-9-81-5554 | SKILL DEVELOPMENT TRAINING | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | MANNARKADU | YES | TANGIBLE | Completed | |
1014 | KERALA | KOTTAYAM | PUTHUPPALLY - MANARCAD CLUSTER | W-245-9-81-6064 | CONSTRUCTION OF TRAINING CENTRE | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | MANNARKADU | YES | TANGIBLE | Completed | |
1015 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-1-4-30509 | PIPE LINE EXTENSION | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | EDAPPAL | YES | TANGIBLE | Completed | |
1016 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-109-31706 | KRISHIBHAVAN CUM COLD STORAGE FACILITY | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | CONSTRUCTION/RENOVATION OF COLD STORAGE | EDAPPAL | YES | TANGIBLE | Completed | |
1017 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-118-31708 | AALEKAYAL PAYANKULAM MOTORSHED ELECTRIFICATION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | ELECTRIFICATION/SANITATION OF LIVE STOCK AID CENTER | EDAPPAL | YES | TANGIBLE | Completed | |
1018 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-125-31714 | CULTIVATION IN PADDY FIELDS AND UNCULTIVATED BARREN LAND | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | FARM FIELD EXPANSION/EXTENSION | VATTAMKULAM | YES | TANGIBLE | Completed | |
1019 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-137-31625 | MADAYIL KOL ARUTHODU PROTECTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | EDAPPAL | YES | TANGIBLE | Completed | |
1020 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-137-31697 | POROOKKARA MANUR KAYAL SLUICE | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | EDAPPAL | YES | TANGIBLE | Completed | |
1021 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-137-31698 | THERETTU KAYAL CANAL CONSTRUCTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | EDAPPAL | YES | TANGIBLE | Completed | |
1022 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-137-31699 | PALLASSERITHODU CONSTRUCTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | EDAPPAL | YES | TANGIBLE | Completed | |
1023 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-137-31700 | KADUMAYIL THODU CONSTRUCTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | EDAPPAL | YES | TANGIBLE | Completed | |
1024 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-137-31701 | IRRIGATION WATER SUPPLY VARATHOOR KAYALPPUZHA TO CHENGANNUR PAADAM INCLUDING MOTER SHED CONSTRUCTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | VATTAMKULAM | YES | TANGIBLE | Completed | |
1025 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-137-31702 | THERETTU KAYAL SLUICE | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | EDAPPAL | YES | TANGIBLE | Completed | |
1026 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-137-31705 | POOTHODU AQUEDUCT CUM BRIDGE | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | EDAPPAL | YES | TANGIBLE | Completed | |
1027 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-138-31624 | PAINKULAM KAVUKULAM IRRIGATION CANAL | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | EDAPPAL | YES | TANGIBLE | Completed | |
1028 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-138-31695 | PUTHUKOL CANAL CONSTRUCTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | EDAPPAL | YES | TANGIBLE | Completed | |
1029 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-10-98-31717 | NEELIYAD THODU THADAYANA KUTTIPPALA CHECK DAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | CHECK DAM | VATTAMKULAM | YES | TANGIBLE | Completed | |
1030 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-11-168-31744 | THUYYAM LIBRARY EXTENSION | EDUCATION | CONSTRUCTION OF LIBRARY/E-LIBRARY IN SCHOOL/ GRAM PANCHAYAT | EDAPPAL | YES | TANGIBLE | Completed | |
1031 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-11-168-31746 | LIBRARY BUILDING IN KUTTIPPALA | EDUCATION | CONSTRUCTION OF LIBRARY/E-LIBRARY IN SCHOOL/ GRAM PANCHAYAT | VATTAMKULAM | YES | TANGIBLE | Completed | |
1032 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-11-171-31727 | PERUMBARAMBA GLP SCHOOL | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | EDAPPAL | YES | TANGIBLE | Completed | |
1033 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-11-171-31728 | POLPPAKKARA LP SCHOOL | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | EDAPPAL | YES | TANGIBLE | Completed | |
1034 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-11-171-31729 | THUYYAM GLP SCHOOL | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | EDAPPAL | YES | TANGIBLE | Completed | |
1035 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-11-171-31730 | VELIYAD GLP SCHOOL | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | EDAPPAL | YES | TANGIBLE | Completed | |
1036 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-11-171-31731 | KOLOLAMBU GLP SCHOOL | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | EDAPPAL | YES | TANGIBLE | Completed | |
1037 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-11-171-31733 | EDAPPAL GOVERNMENT HSS STADIUM CONSTRUCTION | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VATTAMKULAM | YES | TANGIBLE | Completed | |
1038 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-11-171-31734 | EDAPPAL GOVERNMENT HSSSRENOVATION OF BUILDING | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VATTAMKULAM | YES | TANGIBLE | Completed | |
1039 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-11-187-31732 | SMART CLSS FACILITY IN GUPS EDAPPAL | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | EDAPPAL | YES | TANGIBLE | Completed | |
1040 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-11-330-31609 | THUYYAM SCHOOL VAN | EDUCATION | PURCHASE OF SCHOOL BUSES AND VANS | EDAPPAL | YES | TANGIBLE | Completed | |
1041 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-12-192-77992 | HOMEO CLINIC RENOVATION EDAPPAL GP | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | EDAPPAL | YES | TANGIBLE | Completed | |
1042 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-12-193-31725 | PHC BUILDING | HEALTH | CONSTRUCTION/UPRADATION OF CHC | VATTAMKULAM | YES | TANGIBLE | Completed | |
1043 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-12-196-31721 | AYILAKKAD NEW SUB CENTRE | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | EDAPPAL | YES | TANGIBLE | Completed | |
1044 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-12-196-77990 | SUB CENTRE MAINTENANCE 1 POOKKARATHARA SUB CENTRE 2 KOLOLOMBU SUB CENTRE 3 THUYYAM SUB CENTRE 4 PERUMPARAMBU SUBCENTRE | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | EDAPPAL | YES | TANGIBLE | Completed | |
1045 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-12-202-31743 | PAKAL VEEDU RENOVATION AND FURNISHING | HEALTH | REHABILITATION OF DIFFERENTIALLY ABLED | EDAPPAL | YES | TANGIBLE | Completed | |
1046 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-12-307-31723 | VETINARY CENTRE RENOVATION EDAPPAL GP | HEALTH | VETERINARY HOSPITAL OR ANIMAL HEALTH CENTRE | EDAPPAL | YES | TANGIBLE | Completed | |
1047 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-20-300-31879 | INDOOR STADIUM | SPORTS INFRASTRUCTURE | PLAY GROUND OR STADIUM DEVELOPMENT AND RELATED ACTIVITIES | EDAPPAL | YES | TANGIBLE | Completed | |
1048 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-21-264-78014 | BEAUTIFICATION WORK TO VATTAMKULAM TOWN IN PALAKKAD PONNANI ROAD BETWEEN KM 78200 TO 78800 IN THAVANUR LAC | SOCIAL INFRASTRUCTURE | CONSTRUCTION OF CAR PARKING FOR CITIZENS | VATTAMKULAM | YES | TANGIBLE | Completed | |
1049 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-21-264-78015 | BEAUTIFICATION WORK TO CHEKANNUR TOWN IN THAVANOOR LAC | SOCIAL INFRASTRUCTURE | CONSTRUCTION OF CAR PARKING FOR CITIZENS | VATTAMKULAM | YES | TANGIBLE | Completed | |
1050 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-21-264-78016 | DRAINAGE FACILITIES TO KUMARANELLUR ROAD KM005300 WORKING CH 4000POTTUR JN | SOCIAL INFRASTRUCTURE | CONSTRUCTION OF CAR PARKING FOR CITIZENS | VATTAMKULAM | YES | TANGIBLE | Completed | |
1051 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-28-283-31869 | LIFE PROJECT PROVIDING HOUSING | RURAL HOUSING | HOUSES UNDER CENTRAL/STATE RUN SCHEMES (CONVERGENCE) | VATTAMKULAM | YES | TANGIBLE | Completed | |
1052 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-33-289-31736 | ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | EDAPPAL | YES | TANGIBLE | Completed | |
1053 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-33-289-31737 | ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | EDAPPAL | YES | TANGIBLE | Completed | |
1054 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-33-289-31738 | MODEL ANGANWADI MODIFICATION | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | EDAPPAL | YES | TANGIBLE | Completed | |
1055 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-33-289-31739 | MODEL ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | EDAPPAL | YES | TANGIBLE | Completed | |
1056 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-33-289-31740 | ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | EDAPPAL | YES | TANGIBLE | Completed | |
1057 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-33-289-31741 | THIRUMANIYOOR ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VATTAMKULAM | YES | TANGIBLE | Completed | |
1058 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-43-30540 | MANNANTHODU BRIDGE CONSTRUCTION | ACCESS TO VILLAGE STREETS WITH DRAINS | BRIDGE | VATTAMKULAM | YES | TANGIBLE | Completed | |
1059 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-43-30542 | KULANGARA PARUPAADAM THODU BRIDGE | ACCESS TO VILLAGE STREETS WITH DRAINS | BRIDGE | VATTAMKULAM | YES | TANGIBLE | Completed | |
1060 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-43-32058 | EDAPALFLY OVER | ACCESS TO VILLAGE STREETS WITH DRAINS | BRIDGE | EDAPPAL | YES | TANGIBLE | Completed | |
1061 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-30533 | VILLAGE ROADS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1062 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-30536 | MELEZHIYAM ROAD DRAINAGE | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VATTAMKULAM | YES | TANGIBLE | Completed | |
1063 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-30537 | MANOOR CHEKANNOOR ROAD DRAINAGE | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VATTAMKULAM | YES | TANGIBLE | Completed | |
1064 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-30539 | KARUVANPADI KOTTERY CULVERT AND DRAIN | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VATTAMKULAM | YES | TANGIBLE | Completed | |
1065 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-30544 | VILLAGE ROADS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1066 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-30549 | ROAD CONSTRUCTION AND MAINTENANCE | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VATTAMKULAM | YES | TANGIBLE | Completed | |
1067 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77937 | AMMATTIL RAMU MANAYAMPARAMBU ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1068 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77938 | ANGADI THALAMUNDA ROAD CONCRETING | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1069 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77939 | ASARIPPURAKKAL RAVEENDRAN OLD BLOCK ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1070 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77940 | AASUPATHRIKKUNNU KUNDUKULAM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1071 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77941 | AYILAKKAD DUBAIPPADI THAYYIL ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1072 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77942 | AYILAKKAD SUPPARIPPADI POOLATHAZHAM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1073 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77943 | AAZHIKKUTTIKKAVU AMBALAM IDAVAZHI CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1074 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77944 | BLOSSOM PUBLIC SCHOOL ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1075 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77945 | CHEMBILAVALAPPU VENGINITHOD ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1076 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77946 | CHENKOTTA PAYANKULAM KAYAL ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1077 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77947 | CHERINGAL KUNJUMUHAMMED MUSLYAR ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1078 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77948 | CHUDALA VYDYARMOOLA HEALTH CENTER ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1079 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77949 | CHULLIKKAL ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1080 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77950 | CHUNKATH IDAVAZHI CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1081 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77951 | ELIYATHTHARA AV KUNJAPPUTTY ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1082 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77952 | EATTU KANDATHIL THAZHAM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1083 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77953 | KADAVILAVALAPPIL IDAVAZHI CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1084 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77954 | KALLAMMUKKU KARIPPAPARAMBU ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1085 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77955 | KALLAMMUKKU ANTHALICHIRA BUND ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1086 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77956 | KAMBANIPPADY CHERINGAL ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1087 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77957 | KAMABANIPPADI THUMBAYIPPADAM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1088 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77958 | KAAVUKULAM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1089 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77959 | KOTHAKATH AMBALAM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1090 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77960 | KOTTAPPURAM PANGADU ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1091 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77961 | KUZHUMMAL THAZHAM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VATTAMKULAM | YES | TANGIBLE | Completed | |
1092 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77962 | LAKSHAMVEEDU MANOOR KAYAL ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1093 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77963 | LAKSHAMVEEDU THERETTU KAYAL ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1094 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77964 | MK VIJAYAN SHARATH ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1095 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77965 | MAKKATHEL COLONY KRISHIBHAVAN ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1096 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77966 | MANAKKALPADI AYYAPPANKAVU ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1097 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77967 | MENAKATH THAZHAM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1098 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77968 | MOOTHEDATH MANA ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1099 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77969 | MUNDANATT MURALI ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1100 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77970 | NARIMADA BABY BAI ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1101 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77971 | OLAMBAKKADAVU PALLAM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1102 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77972 | PADINJATTUMURI PADINJARU BHAGAM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1103 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77973 | PATHTHARIYIL IDAVAZHI ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1104 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77974 | PAZHAYA REGISTRAR OFFICE POLPPAKKARA ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1105 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77975 | POLPPAKKARA CANAL ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1106 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77976 | POOCHERIKKAL RATIONKADA NADAPPATHA ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1107 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77977 | POOCHERIKKAL VADERIKKULAM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1108 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77978 | POOCHERIKKAL PAYANKULAM FARM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1109 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77979 | POOKKARATHARA HEALTH CENTER ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1110 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77980 | POOKKARATHARA THALI KSHETHRAM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1111 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77981 | POROOKKARA KALLATTUPARAMBIL CHANDRAN NADAPPATHA CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1112 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77982 | SCHOOL LODGE MAKKOTHEL ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1113 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77983 | THALAMUNDA SCHOOL ROAD CONCREING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1114 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77984 | THANGAL IDAVAZHI FARM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1115 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77985 | THATTANPADI KANNENKAYAL PADAM ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1116 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77986 | THUYYAM KANNEMKAYAL ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1117 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-4-44-77987 | VAIDYARMOOLA HEALTH CENTRE ROAD CONCRETING EDAPPAL GP | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | EDAPPAL | YES | TANGIBLE | Completed | |
1118 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-5-53-30550 | SOLAR HIGHMAST LIGHT 10 NOS | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | EDAPPAL | YES | TANGIBLE | Completed | |
1119 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-5-53-30551 | LED STREET LIGHT 750 LIGHTS | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | EDAPPAL | YES | TANGIBLE | Completed | |
1120 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-5-53-30552 | STREET LIGHT AND STREET MAIN | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | EDAPPAL | YES | TANGIBLE | Completed | |
1121 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-5-53-30553 | STREET MAINS | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | VATTAMKULAM | YES | TANGIBLE | Completed | |
1122 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-5-53-31610 | SOLAR PANEL OVER GP | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | EDAPPAL | YES | TANGIBLE | Completed | |
1123 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-5-53-31611 | SOLAR PANEL OVER GP | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | VATTAMKULAM | YES | TANGIBLE | Completed | |
1124 | KERALA | MALAPPURAM | EDAPPAL VATTAMKULAM CLUSTER | W-241-9-81-31628 | BUDS AND REHABILITATION ENTRE POOTHRAKUNNU VATTAMKULAM | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | VATTAMKULAM | YES | TANGIBLE | Completed | |
1125 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-10-302-68808 | CHEMBANTHODU SIDE PROTECTION SHUTTER WORK FOR PREVENTING SALT WATE | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1126 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-10-302-68811 | THALLASSETY SIDE PROTECTION SHUTTER WORK FOR PREVENTING SALT WATER | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1127 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-10-334-69248 | FISH LANDING CENTRE AT THEVAR KADAPPURAM WARD 16 | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | FISH LANDING CENTRE OR JETTY CONSTRUCTION | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1128 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-11-167-69129 | PROVIDING KITCHEN FACILITIES AT GOVT HIGH SCHOOL NIRAMARUTHUR | EDUCATION | CONSTRUCTION OF KITCHEN SHED IN SCHOOL | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1129 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-11-171-69119 | GLPS KPURAM KERALADEESHVARA PURAM VATTATHANI RENOVATION AND AND BUILDING CONSTRUCTION WARD 18 | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | TANALUR | YES | TANGIBLE | Completed | |
1130 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-11-171-69123 | UPGRADATION OF DEVADHAR GOVT HIGHER SECONDARY SCHOOL TANALUR | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | TANALUR | YES | TANGIBLE | Completed | |
1131 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-12-195-69006 | CHUNGAM PHC RENOVATION AND NEW BUILDING WARD 12 | HEALTH | CONSTRUCTION/UPRADATION OF PHC | TANALUR | YES | TANGIBLE | Completed | |
1132 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-12-195-69046 | DIALISIS UNIT AT TANALUR PHC | HEALTH | CONSTRUCTION/UPRADATION OF PHC | TANALUR | YES | TANGIBLE | Completed | |
1133 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-12-195-69102 | UPGRADATION OF NIRAMARUTHUR PHC BUILDING UNNIYAL | HEALTH | CONSTRUCTION/UPRADATION OF PHC | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1134 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-12-196-68943 | NEW BUILDING FOR SUBCENTRE AT K PURAM WARD 18 | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | TANALUR | YES | TANGIBLE | Completed | |
1135 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-12-196-68996 | MEENADATHUR SUBCENTRE CUM ANGANVADI BUILDING CONSTRUCTION | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | TANALUR | YES | TANGIBLE | Completed | |
1136 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-12-196-69108 | NEW BUILDING CONSTRUCTION FOR PANCHARAMOOLA SUBCENTRE | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1137 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-12-196-69116 | PATHAMBADU SUBCENTRE RENOVATION NEW BUILDING | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1138 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-13-212-69225 | INSTALLING WIFI AT PANCHAYATH | DIGITAL LITERACY | INFRA RELATED TO INTERNET CONNECTIVITY | TANALUR | YES | TANGIBLE | Completed | |
1139 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-14-214-69199 | KIOSK AND TOUCHSCREEN AT PANCHAYAT OFFICE | CITIZENS SERVICE CENTRES | EQUIPMENTS NEEDED FOR CSC | TANALUR | YES | TANGIBLE | Completed | |
1140 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-2-18-63253 | CONSTRUCTION OF TOILET COMPLEX PHC TANALUR | SANITATION | CONSTRUCTION OF TOILETS IN GOVERNMENT BUILDING (SCHOOL/SC/PHC/CHC/GP/ANGANWADI ETC.) | TANALUR | YES | TANGIBLE | Completed | |
1141 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-2-18-63530 | CONSTRUCTION OF TOILET COMPLEX AT NIRAMARUTHUR GOVERNMENT HIGH SCHOOL | SANITATION | CONSTRUCTION OF TOILETS IN GOVERNMENT BUILDING (SCHOOL/SC/PHC/CHC/GP/ANGANWADI ETC.) | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1142 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-20-300-69207 | TANALUR EMS STADIUM CONSTRUCTION | SPORTS INFRASTRUCTURE | PLAY GROUND OR STADIUM DEVELOPMENT AND RELATED ACTIVITIES | TANALUR | YES | TANGIBLE | Completed | |
1143 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-3-37-63532 | CONSTRUCTION OF PLASTIC SHREDDING UNIT AT TANALUR | SOLID AND LIQUID WASTE MANAGEMENT | PLASTIC SHREDDING UNIT | TANALUR | YES | TANGIBLE | Completed | |
1144 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-33-285-69154 | BUDS SCHOOL NEW BUILDING WARD XXI THACHAPARAMBU | SOCIAL WELFARE | CONSTRUCTION/RENOVATION OF BUDS/PLAY SCHOOL | TANALUR | YES | TANGIBLE | Completed | |
1145 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-33-288-69191 | CONSTRUCTION OF PAKALVEEDU MANJADIKKAL WARD18 | SOCIAL WELFARE | CONSTRUCTION OF OLD AGE SHELTER/HOME | TANALUR | YES | TANGIBLE | Completed | |
1146 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-33-289-69139 | NEW ANGANVADI BUILDING CONSTRUCTION AT PARAKKUNDU CHERUNANTHANI THAVALAKKUNNU MOOCHIKKAL THAMARAKKULAM MEENADATHUR | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | TANALUR | YES | TANGIBLE | Completed | |
1147 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-33-289-69142 | NEW ANGANVADI BUILDING AT TR BEACH | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1148 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-4-46-63562 | CONSTRUCTION OF DRAINAGE WORKS AT WARD XIV XVIII XXI XXII ETC | ACCESS TO VILLAGE STREETS WITH DRAINS | VILLAGE DRAIN (ON GROUND/UNDER GROUND) CONSTRUCTION | TANALUR | YES | TANGIBLE | Completed | |
1149 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-5-53-63576 | PROVIDING LED STREET LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | TANALUR | YES | TANGIBLE | Completed | |
1150 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-5-53-63582 | PROVIDING LED STREET LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1151 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-5-55-63758 | INSTALLATION OF SOLAR PANEL OVER TANALUR PANCHAYAT OFFIC | VILLAGE STREET LIGHTS AND ELECTRIFICATION | SOLAR PLANT INTEGRATED WITH GRID LINES OR WITHOUT GRID | TANALUR | YES | TANGIBLE | Completed | |
1152 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-6-59-63535 | MEENADATHUR TANALUR ROAD WORK | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | TANALUR | YES | TANGIBLE | Completed | |
1153 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-6-59-63536 | TANALUR PANDIMUTTAM ROAD WORK | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | TANALUR | YES | TANGIBLE | Completed | |
1154 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-6-59-63542 | POOKKAYIL UNNIYAL ROAD WORK | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1155 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-6-59-63545 | MOOCHIKKAL MANJALAMPADI ROAD WORK | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1156 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-6-59-63547 | UNNIYAL THEVARKADAPPURAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1157 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-6-59-63549 | UNNIYAL PARIYAPURAM ROADM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1158 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-6-59-63556 | KUMARANPADI VELLIKANJIRAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1159 | KERALA | MALAPPURAM | TANALUR - NIRAMARUTHOOR CLUSTER | W-277-6-59-63558 | THALIYARA MUHAMMADALI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NIRAMARUTHOOR | YES | TANGIBLE | Completed | |
1160 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-10-101-61075 | UPGRADATION AGRO SERVICE CENTRE AT ANAMARI | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | CONSTRUCTION OF AGRI SERVICE CENTRE | KAVASERY | YES | TANGIBLE | Completed | |
1161 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-10-137-61086 | MANGALAM PROJECT IMPROVEMENT OF KOTTARASSERY THEKKEPOTTA CADA CANAL | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | PUDUCODE | YES | TANGIBLE | Completed | |
1162 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-10-137-61088 | MANGALAM PROJECT IMPROVEMENTS OF MANAPPADAM KIZHAKKEPADAM CADA CANAL | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | PUDUCODE | YES | TANGIBLE | Completed | |
1163 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-10-137-61107 | MANGALAM PROJECT IMPROVEMENT OF CHENNIKODE CANAL FROM CHAINAGE 500 TO 1000 KM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | PUDUCODE | YES | TANGIBLE | Completed | |
1164 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-10-137-61120 | CHERAMANGALAM SCHEME IMPROVEMENT AND URGENT RECTIFICATION WORKS TO MAIN CANAL CONSTRUCTION OF SIDE WALL AND CANAL BED WORKS AT VADAKKETHARA BRANCH CANAL | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | KAVASERY | YES | TANGIBLE | Completed | |
1165 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-10-137-61248 | MANGALAM PROJECT IMPROVEMENT OF RBMC IN BETWEEN 19400 TO 20000 KM AND 1800 TO 18100 KM IMPROVEMENT OF CANAL BETWEEN 18200 TO 18350 KM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | KAVASERY | YES | TANGIBLE | Completed | |
1166 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-10-137-61249 | CHERAMANGALAM SCHEME IMPROVEMENT AND RECTIFICATION WORKS AT VADAKKENADA FIELD BOOTHIE AND VAZHAKACHIRA FIELD CHANNEL SUICE NO 35 AND 36 | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | KAVASERY | YES | TANGIBLE | Completed | |
1167 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-10-302-61077 | PATTOLA KUMBARATHARA CADA CANAL SIDE PROTECTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PUDUCODE | YES | TANGIBLE | Completed | |
1168 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-10-302-61250 | MANGALAM PROJECT CONSTRUCTION AND RENOVATION OF CADA CANALS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KAVASERY | YES | TANGIBLE | Completed | |
1169 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-10-302-61251 | MANGALAM PROJECT CANAL RENOVATION WORKS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | KAVASERY | YES | TANGIBLE | Completed | |
1170 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-10-98-61055 | RENOVATION OF VALIYAPARAMBU CHECK DAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | CHECK DAM | KAVASERY | YES | TANGIBLE | Completed | |
1171 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-10-98-61058 | REPAIR AND RENOVATION OF MADAMBIKKAD CHECK DAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | CHECK DAM | KAVASERY | YES | TANGIBLE | Completed | |
1172 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-11-171-61313 | CONSTRUCTION OF CLSS ROOM AT GMLPS PUTHUCODE | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | PUDUCODE | YES | TANGIBLE | Completed | |
1173 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-12-196-61304 | CONSTRUCTION OF SUB CENTRE AT MANAPPADAM PUTHUCODE | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | PUDUCODE | YES | TANGIBLE | Completed | |
1174 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-2-17-60801 | CONSTRUCTION OF PUBLIC TOILET AT THACHANADI | SANITATION | BUILDING OF PUBLIC TOILETS (BUS STOP/MARKET/ OTHER IDENTIFIED PLACES ETC.) | PUDUCODE | YES | TANGIBLE | Completed | |
1175 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-2-17-60807 | RENOVATION OF PUBLIC TOILET AT ERATTAKULAM | SANITATION | BUILDING OF PUBLIC TOILETS (BUS STOP/MARKET/ OTHER IDENTIFIED PLACES ETC.) | KAVASERY | YES | TANGIBLE | Completed | |
1176 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-2-18-60804 | CONSTRUCTION OF TOILET IN VARIOUS SCHOOLS | SANITATION | CONSTRUCTION OF TOILETS IN GOVERNMENT BUILDING (SCHOOL/SC/PHC/CHC/GP/ANGANWADI ETC.) | KAVASERY | YES | TANGIBLE | Completed | |
1177 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-21-267-61316 | CONSTRUCTION OF GAS CREMATORIUM AT PATTOLA | SOCIAL INFRASTRUCTURE | CONSTRUCTION/UPGRADATION OF CREMATORIUM/BURIAL GROUND | PUDUCODE | YES | TANGIBLE | Completed | |
1178 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-21-277-61315 | RENOVATION OF PUBLIC LIBRARY AT JAYABHARATH VAYANASALA KALLEPULLY | SOCIAL INFRASTRUCTURE | PUBLIC LIBRARY | KAVASERY | YES | TANGIBLE | Completed | |
1179 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-21-277-72783 | RENOVATION OF PUBLIC LIBRARY PADUR | SOCIAL INFRASTRUCTURE | PUBLIC LIBRARY | KAVASERY | YES | TANGIBLE | Completed | |
1180 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-21-277-72785 | RENOVATION OF PUBLIC LIBRARY AT NAVODAYAM VAYANASALA | SOCIAL INFRASTRUCTURE | PUBLIC LIBRARY | KAVASERY | YES | TANGIBLE | Completed | |
1181 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-3-25-60826 | INSTALLATION OF BIO COMPOSTER BINS IN 1390 HHS | SOLID AND LIQUID WASTE MANAGEMENT | CONSTRUCTION OF COMMUNITY SOAK/ VERMI COMPOST PITS | KAVASERY | YES | TANGIBLE | Completed | |
1182 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-3-35-61489 | CONSTRUCTION OF MATERIAL COLLECTION FACILITY BUILDING AT PATTOLA | SOLID AND LIQUID WASTE MANAGEMENT | INFRASTRUCTURE DEVELOPMENT FOR DE-CENTRALISED LIQUID WASTE MANAGEMENT | PUDUCODE | YES | TANGIBLE | Completed | |
1183 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-33-288-61330 | SNEHA VEED FOR SENIOR CITIZEN AT PHC PADUR | SOCIAL WELFARE | CONSTRUCTION OF OLD AGE SHELTER/HOME | KAVASERY | YES | TANGIBLE | Completed | |
1184 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-33-289-61324 | CONSTRUCTION OF NOCHIPARAMBU ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | KAVASERY | YES | TANGIBLE | Completed | |
1185 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-33-289-61325 | CONSTRUCTION OF MODEL ANGANWADI AT THEKKETHARA ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | KAVASERY | YES | TANGIBLE | Completed | |
1186 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-33-289-61326 | CONSTRUCTION OF 3 ANGANWADI MUTHALAKULAM KUNDUTHODI MOOPPUPARAMBU | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | KAVASERY | YES | TANGIBLE | Completed | |
1187 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-33-289-61328 | CONSTRUCTION OF KIZHAKKEPADAM ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | KAVASERY | YES | TANGIBLE | Completed | |
1188 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-33-297-61329 | KANAKKANNUR KUTHIRAPARAMBU COLONY DEVELOPMENT | SOCIAL WELFARE | IEC FOR DIFFERENT SECTS OF SOCIETY | PUDUCODE | YES | TANGIBLE | Completed | |
1189 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-4-44-60941 | THACHANADI ANCHUMURI ROAD DRAINAGE 250 M | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUDUCODE | YES | TANGIBLE | Completed | |
1190 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-4-44-60944 | CHANTHAPURA THOPPINKAD ROAD DRAINAGE 240M | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUDUCODE | YES | TANGIBLE | Completed | |
1191 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-4-44-60948 | PATTTOLA KUMBARATHARA ROAD DRAINAGE CONSTRUCTION 250 M | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUDUCODE | YES | TANGIBLE | Completed | |
1192 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-4-44-60950 | THEKKEPOTTA SANKARATHUPARAMBU ROAD WITH DRAIN 400M | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUDUCODE | YES | TANGIBLE | Completed | |
1193 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-4-44-60952 | CONSTRUCTION OF DRAINS IN CHEMBANKODE ROAD DRAIN | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | KAVASERY | YES | TANGIBLE | Completed | |
1194 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-4-46-72757 | CONSTRUCTION OF DRAINS IN VARIOUS ROADS AT KUNDUTHODI MECHODE ROAD DRAIN | ACCESS TO VILLAGE STREETS WITH DRAINS | VILLAGE DRAIN (ON GROUND/UNDER GROUND) CONSTRUCTION | KAVASERY | YES | TANGIBLE | Completed | |
1195 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-4-46-72766 | CONSTRUCTION OF ROADS IN MUTHANODE PATHANAPURAM ROAD DRAIN | ACCESS TO VILLAGE STREETS WITH DRAINS | VILLAGE DRAIN (ON GROUND/UNDER GROUND) CONSTRUCTION | KAVASERY | YES | TANGIBLE | Completed | |
1196 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-4-46-72768 | CONSTRUCTION OF PATHANAPURAM KOLLENCODE ROAD DRAIN | ACCESS TO VILLAGE STREETS WITH DRAINS | VILLAGE DRAIN (ON GROUND/UNDER GROUND) CONSTRUCTION | KAVASERY | YES | TANGIBLE | Completed | |
1197 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-49-60967 | MINIMAST AT MANAPPADAM | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | PUDUCODE | YES | TANGIBLE | Completed | |
1198 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-49-60970 | STREET MAIN LINE EXTENSION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | PUDUCODE | YES | TANGIBLE | Completed | |
1199 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-49-60977 | EXTENSION OF STREET MAIN LINE KSEB | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | KAVASERY | YES | TANGIBLE | Completed | |
1200 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-49-60981 | FITTING OF HIGH MAST LIGHT AT THENNILAPURAM JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | KAVASERY | YES | TANGIBLE | Completed | |
1201 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-49-60985 | FITTINGS OF MINI MAST LAMPS IN PATHANAPURAM JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | KAVASERY | YES | TANGIBLE | Completed | |
1202 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-49-72744 | FITTING OF HIGH MAST LIGHT ERATTAKULAM JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | KAVASERY | YES | TANGIBLE | Completed | |
1203 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-49-72745 | FITTINGS OF HIGH MAST LIGHT CHUNDAKKAD JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | KAVASERY | YES | TANGIBLE | Completed | |
1204 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-49-72746 | FITTINGS OF HIGH MAST LIGHT IN THONNIKADAVU JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | KAVASERY | YES | TANGIBLE | Completed | |
1205 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-49-72747 | FITTINGS OF HIGH MASS LIGHT IN KAZHANICHUNGAM JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | KAVASERY | YES | TANGIBLE | Completed | |
1206 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-49-72748 | FITTING OF HIGH MASS LIGHT IN PARAKATTUKAVU JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | KAVASERY | YES | TANGIBLE | Completed | |
1207 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-49-72968 | PURCHASE AND FITTING OF LED LIGHT 500 NO KREWS | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | KAVASERY | YES | TANGIBLE | Completed | |
1208 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-60988 | SOLAR PANNEL OFF GRID INSTALLATION FOR PANCHAYAT OFFICE BUILDING AND KRISHI BHAVAN | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUDUCODE | YES | TANGIBLE | Completed | |
1209 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-60993 | INSTALLATION OF SOLAR PANELS AT GRAMAPANCHAYAT OFFICE INSTALLATION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KAVASERY | YES | TANGIBLE | Completed | |
1210 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-72750 | FITTINGS OF MINIMAST LAMPS IN ARAPUZHA JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KAVASERY | YES | TANGIBLE | Completed | |
1211 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-72751 | FITTTINGS OF MINI MAST LAMPS IN PANCHAYATH OFFICE JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KAVASERY | YES | TANGIBLE | Completed | |
1212 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-72752 | FITTING OF MINI MAST LAMPS IN PADUR MANNAKKAD JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KAVASERY | YES | TANGIBLE | Completed | |
1213 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-72753 | FITTING OF MINIMAST LAMP IN KALLEPULLY JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KAVASERY | YES | TANGIBLE | Completed | |
1214 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-72754 | FITTING OF MINIMAST LAMP IN VALLIKAD JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KAVASERY | YES | TANGIBLE | Completed | |
1215 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-72755 | FITTING OF MINIMAST LAMPS IN EDUVEDIYAL JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KAVASERY | YES | TANGIBLE | Completed | |
1216 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-72790 | INSTALLATION OF SOLAR PANELS IN VETENARY HOSPITAL KAZHANI CHUNGAM | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KAVASERY | YES | TANGIBLE | Completed | |
1217 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-72793 | INSTALLATION OF SOLAR PANELS AT PHC KAVASSERRY PADUR | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KAVASERY | YES | TANGIBLE | Completed | |
1218 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-72794 | INSTALLATION OF SOLAR PANELS IN HOMEO DISPENSARY KAVASSERRY AT THENNALIPURAM | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KAVASERY | YES | TANGIBLE | Completed | |
1219 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-72797 | INSTALLATION OF SOLAR PANELS AT GLP SCHOOL KAVASSERRY | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | KAVASERY | YES | TANGIBLE | Completed | |
1220 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-73296 | MINIMAST AT THEKKEPOTTA | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUDUCODE | YES | TANGIBLE | Completed | |
1221 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-73297 | MINIMAST AT ANCHUMURI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUDUCODE | YES | TANGIBLE | Completed | |
1222 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-73298 | MINIMAST AT THACHANADI JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUDUCODE | YES | TANGIBLE | Completed | |
1223 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-73299 | MINIMAST AT PANCHAYATH JUNCTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUDUCODE | YES | TANGIBLE | Completed | |
1224 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-5-53-73300 | MINIMAST AT PATTOLA | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUDUCODE | YES | TANGIBLE | Completed | |
1225 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-56-60864 | ARANGATTUKADAVU BRIDGE BRIDGE ACROSE MANGALAM RIVER | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION OF BRIDGE FOR INTER VILLAGE CONNECTIVITY | PUDUCODE | YES | TANGIBLE | Completed | |
1226 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-56-60870 | THENNILAPURAM BRIDGE ACROSE MANGALAM RIVER | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION OF BRIDGE FOR INTER VILLAGE CONNECTIVITY | KAVASERY | YES | TANGIBLE | Completed | |
1227 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-56-60873 | ATHIPPOTTA BRIDGE RECONSTRUCTION | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION OF BRIDGE FOR INTER VILLAGE CONNECTIVITY | KAVASERY | YES | TANGIBLE | Completed | |
1228 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60833 | THEKKEPPOTTA CHENDAKKAL ROAD 500 M | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUDUCODE | YES | TANGIBLE | Completed | |
1229 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60837 | CHOLAKULAMBU MUTTATHURKULAMBU RAOD 500 M | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUDUCODE | YES | TANGIBLE | Completed | |
1230 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60838 | PUTHIRIPADAM PALLI UDHIYADI TEMPLE ROAD 350 M | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUDUCODE | YES | TANGIBLE | Completed | |
1231 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60848 | VELAMCODE KARADIPPARA ROAD 400M | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUDUCODE | YES | TANGIBLE | Completed | |
1232 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60851 | IMPROVEMENT AND RENOVATION WORKS FOR VARIOUS ROADS IN PUTHUCODE GP 2KM | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUDUCODE | YES | TANGIBLE | Completed | |
1233 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60853 | CHOOLIPPADAM VANDIKKADAVU ROAD RENOVATION | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUDUCODE | YES | TANGIBLE | Completed | |
1234 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60854 | KANAKKANNUR AMBEDKAR COLONY ROAD RETARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUDUCODE | YES | TANGIBLE | Completed | |
1235 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60856 | CHENNALAMKUNDU CHOOLIPPADAM ROAD RENOVATION | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUDUCODE | YES | TANGIBLE | Completed | |
1236 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60858 | PARAPPURAM COMPANY PADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUDUCODE | YES | TANGIBLE | Completed | |
1237 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60859 | IMPROVEMENTS TO AYYAPPANKUNNU PALATTUTHARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUDUCODE | YES | TANGIBLE | Completed | |
1238 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60861 | CHANTHAPPURA VENNUR ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUDUCODE | YES | TANGIBLE | Completed | |
1239 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60865 | THACHANADI ANCHUMURY ROAD RETAARING 985M | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PUDUCODE | YES | TANGIBLE | Completed | |
1240 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60876 | IRATTAKKULAM VANIYAMPARA ROAD 18 KM | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KAVASERY | YES | TANGIBLE | Completed | |
1241 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60878 | MUTHALAKKULAM COLONY ROAD CONCRETING 700M | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KAVASERY | YES | TANGIBLE | Completed | |
1242 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60879 | MUTHANODE COLONY ROAD 500M | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KAVASERY | YES | TANGIBLE | Completed | |
1243 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60881 | KUNDUKKAD COLONY ROAD CONCRETING 1KM | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KAVASERY | YES | TANGIBLE | Completed | |
1244 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60884 | THEKKUMPADAM PEEDIKAMUKKU ROAD 2KM | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KAVASERY | YES | TANGIBLE | Completed | |
1245 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60887 | UCHARKULAM ROAD CONSTRUCTION 265 M | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KAVASERY | YES | TANGIBLE | Completed | |
1246 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60919 | PATHANAPURAM KALLAMKADU ROAD CONSTRUCTION | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KAVASERY | YES | TANGIBLE | Completed | |
1247 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60925 | CONSTRUCTION OF CULVERT AT KOTTAPARAMBU AND RENNOVATION OF PALAKKAD THODU | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KAVASERY | YES | TANGIBLE | Completed | |
1248 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60927 | THEKKUMAN ANGANWADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KAVASERY | YES | TANGIBLE | Completed | |
1249 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60928 | NJARAKKODE ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KAVASERY | YES | TANGIBLE | Completed | |
1250 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-60931 | THEKKUMAN VEERAN ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KAVASERY | YES | TANGIBLE | Completed | |
1251 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-6-59-61498 | ERAKULAM KAZHANI THEKKUMURI ROAD 1500M | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | KAVASERY | YES | TANGIBLE | Completed | |
1252 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-7-65-61004 | CONSTRUCTION BUS WAITING SHED AT KAZHANI CHUNGAM | PUBLIC TRANSPORT | CONSTRUCTION OF BUS STAND | KAVASERY | YES | TANGIBLE | Completed | |
1253 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-9-79-61254 | WOMEN CATERING UNIT IN KAVASSERRY GP | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | KAVASERY | YES | TANGIBLE | Completed | |
1254 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-9-81-61252 | BUILDING FOR TRAINING AND PRODUCTION UNIT AT MANAPPADOM | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | PUDUCODE | YES | TANGIBLE | Completed | |
1255 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-9-81-72890 | WOMEN CATERING UNIT IN KAVASSERRY GP | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | KAVASERY | YES | TANGIBLE | Completed | |
1256 | KERALA | PALAKKAD | PUTHUCODE-KAVASSERY RURBAN CLUSTER | W-238-9-81-72891 | WOMEN CATERING UNIT 3 IN KAVASSERRY GP | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | KAVASERY | YES | TANGIBLE | Completed | |
1257 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-1-12-4090 | INSTALLATION OF 1 TRANSFORMER AND 2 MOTORS IN KULAKKODE PROJECT | PIPED WATER SUPPLY | TUBEWELL INSTALLATION (ELECTRICAL/SOLAR) /REPAIR (COMMUNITY/GOVERNMENT BUILDINGS) | VELLANAD | YES | TANGIBLE | Completed | |
1258 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-1-4-114922 | KOKKARA KAVUVILA MUNDELA DRINKING WATER PROJECT | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | VELLANAD | YES | TANGIBLE | Completed | |
1259 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-1-4-114923 | LAYING 90MM PVC INSTEAD OF OLD 65MM GI AND 63MM PVC FROM NETTRIACHIRA JUNCTION TO MUNDELA VELLANAD ROAD | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | VELLANAD | YES | TANGIBLE | Completed | |
1260 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-1-4-114924 | REPLACING THE EXISTING DISTRIBUTION KOOVAKUDI BRIDGE TO URIYACODE JUNCTION | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | VELLANAD | YES | TANGIBLE | Completed | |
1261 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-1-4-114925 | REPLACING AND DAMAGED 110MM PVC 10KG KANJIRAMOODU TO PALLIVETTA | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | ARYANAD | YES | TANGIBLE | Completed | |
1262 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-1-4-114926 | REPLACING OLD AND DAMAGED 80MM GI PUMPING NEAR WITH 150MM D1 K9 AND 160MM PVC FROM KULAKODE PUMPHOUSE TO KUTHIRAKULAM | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | VELLANAD | YES | TANGIBLE | Completed | |
1263 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-1-4-114927 | REPLACING OLD AND DAMAGED 80MM AC CLASS 10 AND 15 DISTRIBUTION LINE WITH 90MM PVC PIPE AT SHAKHARAMUGHAM | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | VELLANAD | YES | TANGIBLE | Completed | |
1264 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-1-4-114928 | PILELINE EXTENSION IN KARANDAVILA PUNNAVILA PARANKIMAMVILA PALLINADA PANIKYAMVILAKOM | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | ARYANAD | YES | TANGIBLE | Completed | |
1265 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-1-4-114929 | EXTENSION OF PIPELINES FROM VISHNU KSHETHRAM TO VELIYANNOOR COLONY | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | VELLANAD | YES | TANGIBLE | Completed | |
1266 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-104-54820 | CONSTRUCTION OF VEGETABLE SHED IN VELLAND MARKET | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | CONSTRUCTION OF GODOWN/COLD STORAGE FOR CROPS | VELLANAD | YES | TANGIBLE | Completed | |
1267 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-142-6849 | MOBILE SALES VAN FOR ORGANIC PRODUCTS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | MARKET FOR AGRI AND RELATED PRODUCE | VELLANAD | YES | TANGIBLE | Completed | |
1268 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-142-7579 | DEVELOPMENT OF MARKET | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | MARKET FOR AGRI AND RELATED PRODUCE | ARYANAD | YES | TANGIBLE | Completed | |
1269 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-142-7590 | DEVELOPMENT OF MARKET | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | MARKET FOR AGRI AND RELATED PRODUCE | VELLANAD | YES | TANGIBLE | Completed | |
1270 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-114769 | REJUVENATION OF STREAMS IN VELLANAD GP | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1271 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-54638 | CONSTRUCTION OF 1 ORGANIC PRODUCT OUTLET | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | ARYANAD | YES | TANGIBLE | Completed | |
1272 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-54780 | CONSTRUCTION OF CULVERT IN VELIYANNOOR UPS ROAD | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1273 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-54781 | CONSTRUCTION OF CULVERT IN MANPURAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | ARYANAD | YES | TANGIBLE | Completed | |
1274 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-54800 | REJUVENATION OF STREAM AND SIDE PROTECTION ONAMKODU KADUKKOD | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | ARYANAD | YES | TANGIBLE | Completed | |
1275 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-54808 | REJUVENATION OF STREAM AND SIDE PROTECTION AITHY MOONNATTINMUKKU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | ARYANAD | YES | TANGIBLE | Completed | |
1276 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-54815 | CONSTRUCTION OF WATER RETAINING PITS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1277 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-54817 | CONSTRUCTION OF PROTECTION FENCE AND RELATED WORKS IN VELLANAD MUDIPPURA CHIRA | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1278 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-6807 | INSTALLING RAIN WATER HARVESTING TANK IN PANCHAYAT OFFICE COMPOUND | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1279 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-6809 | RAIN WATER HARVESTING TANK IN PANCHAYAT OFFICE COMPOUND | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | ARYANAD | YES | TANGIBLE | Completed | |
1280 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-6813 | CONSTRUCTION OF CULVERT IN KARUMANKADU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1281 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88552 | CONSTRUCTION OF KADAVU AT HOUSING BOARD | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | ARYANAD | YES | TANGIBLE | Completed | |
1282 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88553 | CONSTRUCTION OF KADAVU AT PALAIKKONAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | ARYANAD | YES | TANGIBLE | Completed | |
1283 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88555 | CONSTRUCTION OF KADAVU AT KOTTAIKKONAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | ARYANAD | YES | TANGIBLE | Completed | |
1284 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88557 | CONSTRUCTION OF KADAVU AT EDAYILA PANCHAMTHANGI | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | ARYANAD | YES | TANGIBLE | Completed | |
1285 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88559 | CONSTRUCTION OF KADAVU AT IRAVOOR | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | ARYANAD | YES | TANGIBLE | Completed | |
1286 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88560 | CONSTRUCTION OF KADAVU AT AANANDESWARAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | ARYANAD | YES | TANGIBLE | Completed | |
1287 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88620 | CONSTRUCTION OF KULAKKODU KADAVU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1288 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88621 | CONSTRUCTION OF NIRAPPIL KOLLARIKKONAM KADAVU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1289 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88622 | CONSTRUCTION OF KADAVU AT ELIYAVOOR | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1290 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88623 | CONSTRUCTION OF KADAVU AT VELLAYANIKODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1291 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88624 | CONSTRUCTION OF SHED AND RELATED WORKS IN KULAKODE KADAVU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1292 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88625 | CONSTRUCTION OF SHED AND RELATED WORKS IN VELLAYANI KADAVU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1293 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88626 | CONSTRUCTION OF SHED AND RELATED WORKS IN ELIYAVOOR KADAVU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1294 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88636 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT KONGANAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1295 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88637 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT KOTTAVILA | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1296 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88638 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT KIDANGUMMAL | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1297 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88639 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT VELIYANNOOR RATION SHOP JN | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1298 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88640 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT VELIYANNOOR AYURVEDA HOSPITAL JN | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1299 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88641 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT CHANGA KALUNKU JN | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1300 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88642 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT CHERUKULAMKAVIYAKODU MARKET | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1301 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88643 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT PUTHUMANGALAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1302 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88645 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT URIYAKKODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1303 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88646 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT COMPANYMUKKUMITHRANIKETHAN | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1304 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88647 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT COMPANYMUKKUKOOTTAYANIMOODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1305 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88648 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT KULAKKODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1306 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88650 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT VELLANAD TOWN | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1307 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88651 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT KANNAMPALLI | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1308 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88652 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT KADUKKAMOODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1309 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88654 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT KUTHIRAKKULAMMELEKONAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1310 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88655 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT KUTHIRAKKULAMMAZHUVANCODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1311 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-295-88656 | CONSTRUCTION OF ORGANIC PRODUCT OUTLET AT MELAMKODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | INTEGRATED NATURAL RESOURCE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1312 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-325-114772 | AGRICULTURAL PRODUCT SALES OUTLET IN VELLANAD | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | AGRICULTURE INNOVATION AND INCUBATION CENTRE | VELLANAD | YES | TANGIBLE | Completed | |
1313 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-87-6853 | PROCESSINGUNITVEGETABLE STORAGE FACILITY | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | AGRI PROCESSING UNIT (FLOUR/PULSES/VEGETABLES/FRUITS/HONEY ETC.) | ARYANAD, VELLANAD | YES | TANGIBLE | Completed | |
1314 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-90-114770 | LAND DEVELOPMENT FOR CULTIVATION IN VELLANAD GP | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | AGRICULTURE LAND DEVELOPMENT | VELLANAD | YES | TANGIBLE | Completed | |
1315 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-10-90-6855 | LAND DEVELOPMENT FOR CULTIVATION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | AGRICULTURE LAND DEVELOPMENT | VELLANAD | YES | TANGIBLE | Completed | |
1316 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-167-114777 | CONSTRUCTION OF KITCHEN IN SCHOOLS | EDUCATION | CONSTRUCTION OF KITCHEN SHED IN SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1317 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-169-114776 | CONSTRUCTION OF DINING HALL IN SCHOOLS | EDUCATION | CONSTRUCTION OF MID DAY MEAL HALL | VELLANAD | YES | TANGIBLE | Completed | |
1318 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114754 | ELECTRIFICATION OF NEWLY CONSTRUCTED CLASSROOMS IN GOVT LPS CHANGA | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1319 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114779 | CONSTRUCTION OF FIRST FLOOR BUILDING FOR GOVERNMENT TRIBAL HS MEENANKAL | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1320 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114782 | PAINTING MAINTANANCE IN VELLANAD UPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1321 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114783 | PAINTING MAINTANANCE IN GOVERNMENT VHSS IN ARYANAD GP | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1322 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114784 | PAINTING MAINTANANCE IN GOVT VHSS IN VELLANAD | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1323 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114785 | PAINTING MAINTENANCE IN GOVERNMENT THS MEENANKAL | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1324 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114786 | RMSA INFRASTRUCTURE DEVELOPMENT OF MEENANKAL HS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1325 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114787 | RMSA INFRASTRUCTURE DEVELOPMENT FOR MEENANKAL HS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1326 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114788 | MAINTENANCE OF MEENANKAL HS BUILDING | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1327 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114790 | MAINTENANCE IN VELLANAD VHSS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1328 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114791 | COMPLETION WORKS IN GIRLS AMENITY CENTER IN ARYANAD VHSSS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1329 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114792 | MAINTENANCE OF COMPOUND WALL IN VELLANAD HSS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1330 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114794 | CONSTRUCTION OF ENTRANCE GATE FOR GOVERNMENT VHSS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1331 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114796 | CONSTRUCTION OF GIRLS AMENITY CENTER IN VELLANAD GHSS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1332 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-114798 | MAINTENANCE OF GOVERNMENT VHSS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1333 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-54640 | MAINTENANCE OF CHANGA LPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1334 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-54642 | CONSTRUCTION OF WALL IN THEVIYARKUNNU TRIBAL LPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1335 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-54643 | MAINTENANCE AND ARCH CONSTRUCTION IN ARYANAD LPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1336 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-54644 | MAINTENANCE OF MEENANKAL LPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1337 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-54645 | ROOF CHANGING OF BUILDING IN VELIYANOOR LPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1338 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-54647 | CONSTRUCTION OF AUDITORIUM IN VELIYANOOR LPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1339 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-54648 | CONSTRUCTION OF THEVIYARKUNNU SCHOOL BUS SHED | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1340 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-54652 | CONSTRUCTION OF COMPOUND WALL AND GATE IN LPS CHANGA | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1341 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-7846 | CONSTRUCTION OF BUILDING FOR GLPS CHANGA | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1342 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-7853 | CONSTRUCTION OF TOILET IN CHANGA LPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1343 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-7887 | CONSTRUCTION OF 3 CLASSROOM IN THEVIYARKUNNU TRIBAL LPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1344 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-88545 | UPGRADATION OF TOILETS IN PARANDOD UPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1345 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-88546 | UPGRADATION OF TOILETS IN PARANDOD LPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1346 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-88547 | UPGRADATION OF TOILETS IN ARYANAD LPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1347 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-171-88548 | CONSTRUCTION OF TOILETS IN PAZHAYATHERUVU GLPS | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1348 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-187-88481 | CONSTRUCTION OF SMART CLASSROOM IN THEVIYARKUNNU GOVTLPS | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1349 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-187-88482 | CONSTRUCTION OF SMART CLASSROOM IN GOVTLPS PARANDODU | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1350 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-187-88483 | CONSTRUCTION OF SMART CLASSROOM IN MEENANKAL TRIBAL LPS | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | ARYANAD | YES | TANGIBLE | Completed | |
1351 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-187-88570 | SMART CLASSROOM AT VELLANAD LPS | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1352 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-187-88572 | SMART CLASSROOM AT VELIYANNOOR LPS | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1353 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-187-88573 | SMART CLASSROOM IN MUNDELA TRIBAL LPS | EDUCATION | SMART CLASS ROOMS AND/OR ASSOCIATED EQUIPMENTS WITH/WITHOUT SOLAR POWER IN SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1354 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-11-335-114778 | CONSTRUCTIO OF STAGE IN PSNM UPS IN VELIYANNOOR | EDUCATION | CONSTRUCTION OF MULTIPURPOSE HALL | VELLANAD | YES | TANGIBLE | Completed | |
1355 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114801 | VELLANAD CHC QUARTERS AND PP UNIT MANTENANACE | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | VELLANAD | YES | TANGIBLE | Completed | |
1356 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114802 | CONSTRUCTION OF COMPOUND WALL FOR ARYANAD CHC | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | ARYANAD | YES | TANGIBLE | Completed | |
1357 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114803 | CONSTRUCTION OF SEPTIC TANK FOR VELLANAD CHC | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | VELLANAD | YES | TANGIBLE | Completed | |
1358 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114804 | RENOVATION OF CHC | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | ARYANAD | YES | TANGIBLE | Completed | |
1359 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114805 | CONSTRUCTION OF ROOF FOR HOSPITAL IN ARYANAD GP | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | ARYANAD | YES | TANGIBLE | Completed | |
1360 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114806 | CONSTRUCTION OF VELLANAD CHC QUARTERS | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | VELLANAD | YES | TANGIBLE | Completed | |
1361 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114807 | CONSTRUCTION OF PAIN AND PALLIATIVE CARE UNIT IN ARYANAD | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | ARYANAD | YES | TANGIBLE | Completed | |
1362 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114808 | MAINTENANCE OF TOILETS IN VELLANAD CHC | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | VELLANAD | YES | TANGIBLE | Completed | |
1363 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114809 | THREE PHASE ELECTRIC CONNECTION FOR ARYANAD CHC | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | ARYANAD | YES | TANGIBLE | Completed | |
1364 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114810 | CONSTRUCTION OF OBSERVATION ROOM IN VELLANAD CHC | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | VELLANAD | YES | TANGIBLE | Completed | |
1365 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114811 | COMPLETION WORKS FOR GERIATRIC WARD IN VELLANAD CHC | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | VELLANAD | YES | TANGIBLE | Completed | |
1366 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114812 | ELECTRIFICATION OF GERIATRIC CANTEEN IN VELLANAD CHC | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | VELLANAD | YES | TANGIBLE | Completed | |
1367 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114813 | CONSTRUCTION OF CANTEEN KITCHEN IN VELLANAD CHC | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | VELLANAD | YES | TANGIBLE | Completed | |
1368 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-114814 | EXTENSION OF GERIATRIC WARD IN VELLANAD CHC | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | VELLANAD | YES | TANGIBLE | Completed | |
1369 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-192-54657 | CONSTRUCTION OF HOMEO AND VETENARY HOSPITAL | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | VELLANAD | YES | TANGIBLE | Completed | |
1370 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-195-7617 | VEHICLE FOR IMMUNIZATION FOR CHC | HEALTH | CONSTRUCTION/UPRADATION OF PHC | ARYANAD | YES | TANGIBLE | Completed | |
1371 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-195-7663 | CONSTRUCTION OF COMPOUND WALL IN KUTHIRAKULAM SUB CENTER | HEALTH | CONSTRUCTION/UPRADATION OF PHC | VELLANAD | YES | TANGIBLE | Completed | |
1372 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-195-7731 | LANDSCAPING OF CHC | HEALTH | CONSTRUCTION/UPRADATION OF PHC | VELLANAD | YES | TANGIBLE | Completed | |
1373 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-195-7745 | CONSTRUCTION OF TWO WARDS IN CHC | HEALTH | CONSTRUCTION/UPRADATION OF PHC | VELLANAD | YES | TANGIBLE | Completed | |
1374 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-195-7761 | CONSTRUCTION OF PALLIATIVE CARE UNIT GERIATRIC UNIT COUNSELLING CENTER AND DEADDICTION CLINIC | HEALTH | CONSTRUCTION/UPRADATION OF PHC | VELLANAD | YES | TANGIBLE | Completed | |
1375 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-196-88563 | CONSTRUCTION OF SUBCENTER AT CHANGA | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | VELLANAD | YES | TANGIBLE | Completed | |
1376 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-12-196-88565 | CONSTRUCTION OF SUBCENTRE AT KIDANGUMMAL | HEALTH | CONSTRUCTION/UPRADATION OF SUB-CENTRE | VELLANAD | YES | TANGIBLE | Completed | |
1377 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-213-10238 | CONSTRUCTION OF MINI CIVIL STATION | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | VELLANAD | YES | TANGIBLE | Completed | |
1378 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-213-10243 | CONSTRUCTION OF CONVERGENCE CENTER | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | ARYANAD | YES | TANGIBLE | Completed | |
1379 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-213-10260 | UPGRADATION OF GRAMAKENDRAS | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | VELLANAD | YES | TANGIBLE | Completed | |
1380 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-213-88484 | CONSTRUCTION OF KEEZHPALOOR GRAMAKENDRA | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | ARYANAD | YES | TANGIBLE | Completed | |
1381 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-213-88486 | CONSTRUCTION OF POTTENCHIRA GRAMAKENDRA | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | ARYANAD | YES | TANGIBLE | Completed | |
1382 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-213-88487 | CONSTRUCTION OF THEVIYARKUNNU GRAMAKENDRA | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | ARYANAD | YES | TANGIBLE | Completed | |
1383 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-213-88488 | CONSTRUCTION OF KOKKOTTELA GRAMAKENDRA | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | ARYANAD | YES | TANGIBLE | Completed | |
1384 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-213-88489 | CONSTRUCTION OF PURUTHIPPARA GRAMAKENDRA | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | ARYANAD | YES | TANGIBLE | Completed | |
1385 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-213-88491 | CONSTRUCTION OF PALLIVETTA GRAMAKENDRA | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | ARYANAD | YES | TANGIBLE | Completed | |
1386 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-213-88492 | CONSTRUCTION OF GIRINAGAR GRAMAKENDRA IN ARYANAD TOWN | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | ARYANAD | YES | TANGIBLE | Completed | |
1387 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-213-88495 | CONSTRUCTION OF GRAMAKENDRA AT IRAVOOR | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | ARYANAD | YES | TANGIBLE | Completed | |
1388 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-213-88496 | CONSTRUCTION OF GRAMAKENDRA AT MEENANKAL | CITIZENS SERVICE CENTRES | CONSTRUCTION/UPRADATION OF CITIZEN SERVICE CENTRE | ARYANAD | YES | TANGIBLE | Completed | |
1389 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-216-10256 | PROVIDING ARRANGEMENTS OF COURT FACILITIES | CITIZENS SERVICE CENTRES | INTERNET CONNECTIVITY TO CSC | VELLANAD | YES | TANGIBLE | Completed | |
1390 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-216-54639 | CONSTRUCTION OF 1 GRAMAKENDRA | CITIZENS SERVICE CENTRES | INTERNET CONNECTIVITY TO CSC | VELLANAD | YES | TANGIBLE | Completed | |
1391 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-14-319-10249 | MAINTENANCE OF PANCHAYATH OFFICE | CITIZENS SERVICE CENTRES | INFRA FACILITIES OR DEVELOPMENT RELATED GRAM PANCHAYAT GOVERNMENT OR COMMUNITY BUILDING | VELLANAD | YES | TANGIBLE | Completed | |
1392 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-20-254-10173 | CONSTRUCTION OF APJ ABDUL KALAM MINI STADIUM | SPORTS INFRASTRUCTURE | COURT (TENNIS AND OTHERS)/STADIUM FOR DIFFERENT INDOOR AND OUTDOOR GAMES | ARYANAD | YES | TANGIBLE | Completed | |
1393 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-20-254-10184 | MAINTENANCE OF COMMUNITY HALL IN KEEZHPALOOR | SPORTS INFRASTRUCTURE | COURT (TENNIS AND OTHERS)/STADIUM FOR DIFFERENT INDOOR AND OUTDOOR GAMES | ARYANAD | YES | TANGIBLE | Completed | |
1394 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-20-254-10186 | CONSTRUCTION OF YOUTH CLUBKUDUMBASREE TRAINING CENTER AND CONFERENCE ROOM | SPORTS INFRASTRUCTURE | COURT (TENNIS AND OTHERS)/STADIUM FOR DIFFERENT INDOOR AND OUTDOOR GAMES | ARYANAD | YES | TANGIBLE | Completed | |
1395 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-20-254-10195 | IMPROVEMENT OF AMBEDKAR PARK | SPORTS INFRASTRUCTURE | COURT (TENNIS AND OTHERS)/STADIUM FOR DIFFERENT INDOOR AND OUTDOOR GAMES | ARYANAD | YES | TANGIBLE | Completed | |
1396 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-20-254-10202 | RENOVATION OF MINI STADIUM | SPORTS INFRASTRUCTURE | COURT (TENNIS AND OTHERS)/STADIUM FOR DIFFERENT INDOOR AND OUTDOOR GAMES | VELLANAD | YES | TANGIBLE | Completed | |
1397 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-20-300-114945 | PLAYGROUND CONSTRUCTION IN KEEZHPALOOR | SPORTS INFRASTRUCTURE | PLAY GROUND OR STADIUM DEVELOPMENT AND RELATED ACTIVITIES | ARYANAD | YES | TANGIBLE | Completed | |
1398 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-21-267-114934 | CONSTRUCTION OF CREMATORIUM IN KADUKKAMOODU SC COLONY | SOCIAL INFRASTRUCTURE | CONSTRUCTION/UPGRADATION OF CREMATORIUM/BURIAL GROUND | VELLANAD | YES | TANGIBLE | Completed | |
1399 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-21-267-114935 | CONSTRUCTION OF PROTECTION WALL TO KADUKKAMOODU CREMATORIUM | SOCIAL INFRASTRUCTURE | CONSTRUCTION/UPGRADATION OF CREMATORIUM/BURIAL GROUND | VELLANAD | YES | TANGIBLE | Completed | |
1400 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-21-267-114947 | INFRASTRUCTURE DEVELOPMENT AT THE CREMATORIUM | SOCIAL INFRASTRUCTURE | CONSTRUCTION/UPGRADATION OF CREMATORIUM/BURIAL GROUND | VELLANAD | YES | TANGIBLE | Completed | |
1401 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-21-267-54845 | CREMATORIUM FACILITY RENOVATION | SOCIAL INFRASTRUCTURE | CONSTRUCTION/UPGRADATION OF CREMATORIUM/BURIAL GROUND | VELLANAD | YES | TANGIBLE | Completed | |
1402 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-21-269-54844 | SC DEVELOPMENT PROGRAMS IN VALIYAMALA HARIGEN COLONY AND PURUTHIPARA HARIGEN COLONY | SOCIAL INFRASTRUCTURE | CONSTRUCTION/UPRADATION OF COMMUNITY/BANQUET HALL/PANCHAYAT GHAR | ARYANAD | YES | TANGIBLE | Completed | |
1403 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-3-32-54379 | VEHICLE FOR TRANSPORTING WASTE COLLECTED AND SEGREGATED | SOLID AND LIQUID WASTE MANAGEMENT | INFRASTRUCTURE DEVELOPMENT FOR CENTRALISED LIQUID WASTE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1404 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-3-32-54390 | PLASTIC SHREDDING UNIT | SOLID AND LIQUID WASTE MANAGEMENT | INFRASTRUCTURE DEVELOPMENT FOR CENTRALISED LIQUID WASTE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1405 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-3-33-54385 | INSTALLING BIOGAS PLANTS IN SCHOOLS | SOLID AND LIQUID WASTE MANAGEMENT | INFRASTRUCTURE DEVELOPMENT FOR CENTRALISED SOLID WASTE MANAGEMENT | VELLANAD | YES | TANGIBLE | Completed | |
1406 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-285-54775 | PLOT PREPARATION FOR MODEL ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/RENOVATION OF BUDS/PLAY SCHOOL | VELLANAD | YES | TANGIBLE | Completed | |
1407 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-286-114942 | NAVBHARATH KIDANGUMMAL LIBRARY HALL CONSTRUCTION | SOCIAL WELFARE | CONSTRUCTION OF DESTITUTE WELFARE CENTRE | VELLANAD | YES | TANGIBLE | Completed | |
1408 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-286-114943 | THULAYATHUKONAM SC COLONY ROAD RENOVATION | SOCIAL WELFARE | CONSTRUCTION OF DESTITUTE WELFARE CENTRE | ARYANAD | YES | TANGIBLE | Completed | |
1409 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-286-114944 | CONSTRUCTION OF CULTURAL CENTER AT KONGANAM | SOCIAL WELFARE | CONSTRUCTION OF DESTITUTE WELFARE CENTRE | VELLANAD | YES | TANGIBLE | Completed | |
1410 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-288-9690 | CONSTRUCTION OF MOTHER AND GIRL FRIENDLY TOILETS | SOCIAL WELFARE | CONSTRUCTION OF OLD AGE SHELTER/HOME | ARYANAD | YES | TANGIBLE | Completed | |
1411 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-114937 | CONSTRUCTION OF ANGANWADIS | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1412 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-114938 | CONSTRUCTION OF SHED FOR ARYANAD CDPO OFFICE | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | ARYANAD | YES | TANGIBLE | Completed | |
1413 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-114939 | CONSTRUCTION OF CULTURAL CENTER AT THEVIYARUKUNNU | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | ARYANAD | YES | TANGIBLE | Completed | |
1414 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-114940 | CONSTRUCTION OF SEMI PERMANENT SHED IN ARYANAD CDPO OFFICE | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | ARYANAD | YES | TANGIBLE | Completed | |
1415 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-54759 | MAINTENANCE OF ICDS OFFICE TOILET | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | ARYANAD | YES | TANGIBLE | Completed | |
1416 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-54760 | MAINTENANCE OF ANGANWADI IN ARYANAD TOWN | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | ARYANAD | YES | TANGIBLE | Completed | |
1417 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-54761 | MAINTENANCE OF KINDER GARDEN BUILDING | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1418 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-54762 | MAINTENANCE OF THULAYIL ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1419 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-54763 | MAINTENANCE OF KONGANAN ANGAWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1420 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-54766 | MAINTENANCE OF IDAVAMKONAM ANGAWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | ARYANAD | YES | TANGIBLE | Completed | |
1421 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-54770 | MAINTENANCE OF NIRMITHI ANGAWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | ARYANAD | YES | TANGIBLE | Completed | |
1422 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-54771 | MAINTENANCE OF MANKOD LAKSHAMVEED ANGAWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | ARYANAD | YES | TANGIBLE | Completed | |
1423 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-54777 | CONSTRUCTION OF COMPOUND WALL AND RELATED WORKS IN NEWLY CONSTRUCTED ANGANWADIS | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1424 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-88608 | MAITANENCEIMPROVEMENTS OF VARIOUS ANGANWADI 1 MAZHUVANCODE ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1425 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-88609 | MAITANENCEIMPROVEMENTS OF VARIOUS ANGANWADI 2 KUTTAYANIMOODU ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1426 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-88610 | MAITANENCEIMPROVEMENTS OF VARIOUS ANGANWADI 3 MUKKALAMPADU ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1427 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-88611 | MAITANENCEIMPROVEMENTS OF VARIOUS ANGANWADI 4 KARIKONAM AND OTHER ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1428 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-88612 | CONSTRUCTION OF KOOTTAYANIMOODU ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1429 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-88613 | CONSTRUCTION OF MUKKALAMPAD ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1430 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-88614 | CONSTRUCTION OF CHAKKIPPARA ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1431 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-88615 | CONSTRUCTION OF MAZHUVANCODE ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1432 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-88616 | CONSTRUCTION OF KADUKKAMOODU ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1433 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-88617 | CONSTRUCTION OF MUNDELA ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1434 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-88619 | ELECTRIFICATION OF NEWLY CONSTRUCTED ANGANAWADIS UNDER RURBAN PROJECT | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1435 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-33-289-9668 | VALIYARA MODEL ANGANWADI CONSTRUCTION | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VELLANAD | YES | TANGIBLE | Completed | |
1436 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-4-44-114763 | RETARRING AND DRAINAGE CONSTRUCTION IN POOVACHAL THANNIVILA AYANTHIVILA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VELLANAD | YES | TANGIBLE | Completed | |
1437 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-4-44-54197 | BOUNDERMUKKU MANCHADI NENNAVILA DRAIN CONSTRUCTION | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | ARYANAD | YES | TANGIBLE | Completed | |
1438 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-5-53-5166 | EXTENSION OF 45 KM STREET LINE | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | ARYANAD | YES | TANGIBLE | Completed | |
1439 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-5-53-5168 | EXTENSION OF STREET 43 KM LINE | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | VELLANAD | YES | TANGIBLE | Completed | |
1440 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-5-53-5293 | INSTALLATION OF SOLAR PANELS IN PANCHAYAT OFFICE | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | VELLANAD | YES | TANGIBLE | Completed | |
1441 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-5-53-5296 | INSTALLATION OF SOLAR PANEL IN PANCHAYAT OFFICE | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | ARYANAD | YES | TANGIBLE | Completed | |
1442 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-5-53-88678 | INSTALLATION OF HIGHMAST LIGHT AT VELLANAD JN | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | VELLANAD | YES | TANGIBLE | Completed | |
1443 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-5-53-88679 | INSTALLATION OF HIGHMAST LIGHT AT VELLANAD TOWN | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | VELLANAD | YES | TANGIBLE | Completed | |
1444 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-5-53-88680 | INSTALLATION OF HIGHMAST LIGHT NEAR SHOPPING COMPLEX VELLANAD | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | VELLANAD | YES | TANGIBLE | Completed | |
1445 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-56-114866 | CONSTRUCTION OF BRIDGE IN KEEZHPALOOR ONNAM PAALAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION OF BRIDGE FOR INTER VILLAGE CONNECTIVITY | ARYANAD | YES | TANGIBLE | Completed | |
1446 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-56-114873 | CONSTRUCTION OF MANALIVILA LAKSHAM PALAM | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION OF BRIDGE FOR INTER VILLAGE CONNECTIVITY | VELLANAD | YES | TANGIBLE | Completed | |
1447 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-57-114877 | CONSTRUCTION OF SIDE WALL PROTECTION AND EARTH FILLING IN THENGUVILA THEVARKULAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION OF PROTECTION WALL/ CRASH BARRIER | VELLANAD | YES | TANGIBLE | Completed | |
1448 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-57-114878 | CONSTRUCTION OF SIDE WALL PROTECTION IN ONNAMPALAM KEEZHPALOOR ROAD PHASE 1 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION OF PROTECTION WALL/ CRASH BARRIER | VELLANAD | YES | TANGIBLE | Completed | |
1449 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114815 | IMPROVEMENTS TO HILL HIGHWAY ARYANAD KALLIKKAD ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1450 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114816 | CONSTRUCTION OF VALIYAKALUNGU MURIKKINMOODU KIZHAKKUMKARA JAWAN ROAD IN ARYANAD GP | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1451 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114824 | RENOVATION OF THOTTINKARA CHERIYARYANAD ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1452 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114827 | RENOVATION OF ANANDESWARAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1453 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114828 | CONSTRUCTION OF AKKAYIL VENJARAKUZHI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1454 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114829 | CONSTRUCTION OF CHEMBAKAMANGALAM MELECHIRA SASTHAMKOVIL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1455 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114830 | CONSTRUCTION OF BOUNDERMUKKU IT ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1456 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114831 | CONSTRUCTION OF PATHAYAKUNNU KURUVIYODU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1457 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114832 | VALIYAKALUNGU MULLANKALLU ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1458 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114834 | KOTTAMALA ALAMKODE ROAD RETARRING AND CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1459 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114835 | RENOVATION OF PUTHUKULANGARA KANYARUPARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1460 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114836 | RENOVATION OF KOKKOTTELA ANIYILAKADAVU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1461 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114838 | RECTIFICATION OF DAMAGES TO PULIMOODU LPS THOLLOOR ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1462 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114839 | URGENTRECTIFICATION OF DAMAGES TO ARYANAD ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1463 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114840 | AVOIDING WATER STAGNATION AT THOLLOOR IN ARYANAD NEDUMANAGAD ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1464 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114842 | URGENT PATCH REPAIRS TO MITHRANIKETHAN COMPANIMUKKU VELIYANNOOR ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1465 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114843 | RESURFACING OF VELLANAD BRANCH ROADS | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1466 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114844 | URGENT REPAIR WORKS IN MITHRANIKETHAN VELIYANNOOR ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1467 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114845 | CONCRETING OF PURUTHIPPARA SC COLONY IN ARYANAD GP | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1468 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114846 | IMPROVEMENTS TO PULIMOOD IRAVOOR ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1469 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114847 | IMPROVEMENTS TO MEENANKAL PANNIKUZHI PATTANKULICHAPARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1470 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114848 | IMPROVEMENTS TO ARYANAD PEZHUMMOODU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1471 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114849 | RECTIFICATION OF DAMAGES TO PARANDOD MEENANKAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1472 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114850 | IMPROVEMENTS TO NEDUMANGAD ARYANAD ROAD FOR SABARIMALA SEASON | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1473 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114851 | IMPROVEMENTS TO CHANGA CHAKKIPPARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1474 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114852 | IMPROVEMENTS TO VELLANAD KANNAMPALLY CHEPOD MULAYARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1475 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114854 | IMPROVEMENTS TO KANIKKAPETTY PUTHUKULANGARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1476 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114855 | RECTIFICATION OF DAMAGES TO NETTICHIRA VELLANAD POOVACHAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1477 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114856 | URGENT RECTIFICATION OF DAMAGES TO VELLANAD ARUVIKKARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1478 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114857 | IMPROVEMENTS TO NETTICHIRA VELLANAD POOVACHAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1479 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114858 | SABARIMALA IMPROVEMENTS TO NEDUMANGAD ARYANAD ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1480 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114859 | URGENT REPAIR WORKS IN VELLANAD VALIYARA MEPPATTUMALA SHANGARAMUGHAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1481 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114860 | IMPROVEMENTS TO URIYACODE SYMON MEMORIAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1482 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114861 | CONSTRUCTION OF CONCRETE ROADS UNDER MGNREGS SCHEME IN VELLANAD GP | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1483 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114862 | SHANTHI NAGAR THUMBOTTUKONAM ROAD RENOVATION | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1484 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114863 | VALIYARA POOVANAMCODE ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1485 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114864 | CHERIYARYANAD SC COLONY ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1486 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114865 | CONSTRUCTION OF DRAIN IN CHERAPPALLI POTTENCHIRA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1487 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114867 | CONSTRUCTION OF DRAIN NEAR CDPO OFFICE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1488 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114868 | CONSTRUCTION OF KADUKAMOODU KANNAMPALLY ROAD IN VELLANAD GP | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1489 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114869 | RENOVATION OF ANANDESWARAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1490 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114870 | RENOVATION OF CHOOZHA KANIYARKUZHI ELA BUND ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1491 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114875 | CONSTRUCTION OF SHANKARAMANGALAM PALLINADAVAZHODU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1492 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114876 | CONSTRUCTION OF NATTUPARA KANNAMPALLI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1493 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114879 | MAINTENANCE OF MUNDELA DEVARUKULAM KURISHADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1494 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114880 | CONSTRUCTION OF NIRAPPIL VILAYILMUKKU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1495 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114881 | MAINTENANCE OF THULAYATH COLONY ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1496 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114883 | CONSTRUCTION OF KANYARUPARA PUTHUKULANGARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1497 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114884 | CONSTRUCTION OF AITHY VETTICHANKUNNU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1498 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114885 | CONSTRUCTION OF ONNAMPALAM KEEZHPALOOR ELA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1499 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114886 | CONSTRUCTION OF VELLANAD MEPPATTUMALA CHATHANAD ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1500 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114893 | RENOVATION OF PULIKOTTUKUZHI URIYACODE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1501 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114894 | RENOVATION OF KANIYARUKONAM CHOOZHA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1502 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114895 | CONSRUCTION OF VAYALIKKADA BHOOTHATHAN KSHETHRAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1503 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114897 | RENOVATION OF OOTTUKUZHI MALAYAMTHERI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1504 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114898 | RETARRING OF KANIYAMVILAKOM CHERUMANCHAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1505 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114899 | RETARRING OF POTTENCHIRA MOONNATTUMUKKU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1506 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114900 | RETARRING OF ERAVOOR MAYILANIKONAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1507 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114901 | MAINTENANCE OF KAMUKARAKONAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1508 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114903 | MAINTENANCE OF KAMUKARAKONAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1509 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114904 | CONSTRUCTION OF SIDEWALL PROTECTION IN VAYALIKADA BHOOTHATHAN KSHETHRAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1510 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114905 | TARRING OF POOTHANKODU KALLUVANKONAM KANNAMPALLI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1511 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114906 | RENOVATION OF KULAKODU NILAMEL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1512 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114909 | RENOVATION OF URIYACODE KANNAMPALLI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1513 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114910 | THONDANKULAM VALLIMANGALAM ROAD RETARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1514 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-114915 | RENOVATION OF VELIYANNOOR KURUNKANNOOR ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1515 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54660 | CHETTACHAL VELLANAD ROAD CONSTRUCTION PROJECT | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1516 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54661 | CHETTACHAL VELLANAD ROAD CONSTRUCTION PROJECT | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1517 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54669 | BRIDGE CONSTRUCTION IN KOOVAKKUDI | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1518 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54673 | NJAVARAPARAKONAM THADAM CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1519 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54674 | MANCHADI NINNAVILA PULININNAKALA THADAM CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1520 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54679 | MANNARAM EALIKONAM ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1521 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54681 | MADATHUVATHIKKAL ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1522 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54686 | LANE CONCRETING AT KUNNINPURAM LAKSHAM VEEDU COLONY | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1523 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54688 | ROAD MAINTANANCE MUNNAMKALLU KILLIYANOOR | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1524 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54689 | THUNDUVILA MUMBALA KANIYARKONAM NADAPPATHA CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1525 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54691 | KORAMKUZHI UNDAPPARA ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1526 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54694 | MEENANKAL PANNIKKALA NADAPPATHA ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1527 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54695 | GK NAGAR ROAD KALUNK | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1528 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54696 | PALAIKKONAM KARIMANKUZHI NADAPPATHA CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1529 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54697 | MELECHIRA ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1530 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54698 | THATTAVILAKAM MUTHIKKAVU ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1531 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54699 | ATHIYARA PANAYIL NADAPPATHA CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1532 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54700 | PUNNAVILA NADAPPATHA CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1533 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54701 | MALAYAMTHERI AANAMUPPARA NADAPPATHA CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1534 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54702 | POTTANCHIRA MUTHALATHUKUZHI KAVU VILA ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1535 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54703 | ONNAMPALAM KARIKKAM NADAPPATHA CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1536 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54704 | MANKODU KUNNIVIALA ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1537 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54705 | VAYALARIKAM MANKODU ROAD SIDE WALL AND SLAB CONSTRUCTION | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1538 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54712 | CHERIYARYNAD COLONY ROAD MAINTENANCE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1539 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54713 | MANNARAM EALIKONAM ROAD MAINTANANCE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1540 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54714 | IDAVAKKONAM CHERUPPANI ROAD RETARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1541 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54715 | PARAMUKKU MALAYANTHERI ROAD MAINTANANCE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1542 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54719 | KANAKKUZHI ATHIYARA ROAD RETARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1543 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54722 | PURTHIPPARA COLONY ROAD MAINTANANCE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1544 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54723 | THANNIMOODU PALLINADA ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1545 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54724 | AANADHESHWARAM PALLINADA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1546 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54725 | MAINTANANCE AANTHESWARAM IREUMOODE ANIYILIKKADAVU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1547 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54729 | EDATHARA MEKKUMKARA KADUVAKUZHI MUD ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1548 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54730 | VATTAVILA KUNNATHU ROAD METALLING AND TARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1549 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54731 | KARIKKONAM PALLITHARA ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1550 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54733 | MUNDELA TRIBAL LP SCHOOL ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1551 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54734 | VELLAMKOLLI COLONY ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1552 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54735 | MITHRAMKONAM THERANI ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1553 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54736 | MAINTANANCE OF VELIYANNOOR MOOZHI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1554 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54737 | VELIYANNOOR CHANGA MOOZHI SC ROAD RETARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1555 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54738 | VELIYANNOOR SC COLONY ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1556 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54739 | KURISHADI KOTTAVILA ROAD RETARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1557 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54740 | KARUMANCODE MITHRANIKHETAN ROAD METALLING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1558 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54741 | MOOZHI KARIMPANDI ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1559 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54742 | CHERUKULATHOOR KAVIYAKOD ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1560 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54743 | KANYARUPARA KALLOORTHALA ROAD SIDE WALL COSTRUCTION | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1561 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54744 | KOTTAVILA KUNNATHUKONAM ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1562 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54745 | ARUVIKKAMOOZHI POONTHI ROAD METTALLING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1563 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54747 | PUTHUMANGALAM KSHETHRA ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1564 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54748 | KADUKKODU ONAMKODU ROAD CONCRETE WARD NO 298 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1565 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54750 | KAVIYAKKODU KANANGARAMOOZHY ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1566 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54752 | KUNNUMPURAM VALIYAELA ROAD CULVERT | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1567 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54754 | KOTTAVILA VELLAYANIKODE ROAD CONCRETE WARD 2 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1568 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54756 | KARIKONAM KOYIPURAM ROAD CONCRETE IN WARD 4 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1569 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-54847 | KUDAPPARA THADAM CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | ARYANAD | YES | TANGIBLE | Completed | |
1570 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88576 | IMPROVEMENTS OF VELLANAD UPS ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1571 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88577 | KALLIDUKKUVILA ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1572 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88579 | VELIYANNOOR UPS ROAD TARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1573 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88580 | IMPROVEMENTS OF PALAYAM ILANJIMOODU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1574 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88582 | PARAYAMVILAKOM ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1575 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88584 | VELIYANNOOR VISHNU KSHETHRAM ROAD CONCRETE AND INTERLOCK | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1576 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88586 | IMPROVEMENTS OF MELEKKONAM CHITTATHACODE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1577 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88587 | IMPROVEMENT OF KAVIYAKODEKADUVAKUZHI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1578 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88588 | IMPROVEMENT OF VELLOORKONAM BUS STAND ROAD CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1579 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88589 | KUTHIRAKULAM MELEKONAM ROAD BEARM CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1580 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88590 | IMPROVEMENT OF MITHRANIKEETHAN KONATHU NADA LANE CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1581 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88592 | CONSTRUTION OF PROTETION WALL TOCHETTIKONAM ROAD CONCRETING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1582 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88593 | CONSTRUCTION OF PROTECTION WALL TO VELLANAD UPS ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1583 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88594 | IMPROVEMENT OF VELIYANOORVISHNU KSHATHARAM LANE CONCRETE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1584 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88595 | CONSTRUCTION OF PROTECTION WALL AND ROAD CONCRETING IN VELLANAD KAIRALINAGARKANNAMPALLI KALLU VATANKUZHI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1585 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-59-88676 | VELIYANNOOR LPS ROAD METTALLING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VELLANAD | YES | TANGIBLE | Completed | |
1586 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-60-4179 | KEEZHPALOOR VINOBANIKETHANVAN ROAD CONSTRUCTION | INTER VILLAGE ROADS CONNECTIVITY | CULVERT ON INTER VILLAGE ROADS | ARYANAD | YES | TANGIBLE | Completed | |
1587 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-60-4188 | VEVARTHALA BUND ROAD CONSTRUCTION | INTER VILLAGE ROADS CONNECTIVITY | CULVERT ON INTER VILLAGE ROADS | ARYANAD | YES | TANGIBLE | Completed | |
1588 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-60-4195 | ATHIYARA GK NAGAR MUDIYAMPARA AYAMKONAM LABBA ROAD CONSTRUCTION | INTER VILLAGE ROADS CONNECTIVITY | CULVERT ON INTER VILLAGE ROADS | ARYANAD | YES | TANGIBLE | Completed | |
1589 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-60-4207 | MYLAMOODU KANIYANVILAKOM KODUMKANI ROAD CONSTRUCTION | INTER VILLAGE ROADS CONNECTIVITY | CULVERT ON INTER VILLAGE ROADS | ARYANAD | YES | TANGIBLE | Completed | |
1590 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-60-4214 | POTTANCHIRA VALIYAMALA MEKKUMKARA ROAD CONSTRUCTION | INTER VILLAGE ROADS CONNECTIVITY | CULVERT ON INTER VILLAGE ROADS | ARYANAD | YES | TANGIBLE | Completed | |
1591 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-60-4221 | MANPURAM CULVERT | INTER VILLAGE ROADS CONNECTIVITY | CULVERT ON INTER VILLAGE ROADS | ARYANAD | YES | TANGIBLE | Completed | |
1592 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-60-4239 | CONSTRUCTION OF ROAD IN KALLAMPOTTA TO KIZHAKKUMKARA | INTER VILLAGE ROADS CONNECTIVITY | CULVERT ON INTER VILLAGE ROADS | VELLANAD | YES | TANGIBLE | Completed | |
1593 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-60-4291 | KAVIYAKODE MEKKUMKARA ROAD TARRING | INTER VILLAGE ROADS CONNECTIVITY | CULVERT ON INTER VILLAGE ROADS | VELLANAD | YES | TANGIBLE | Completed | |
1594 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-60-4298 | KARIKKONAM CHITTIKKONAM ROAD TARRING | INTER VILLAGE ROADS CONNECTIVITY | CULVERT ON INTER VILLAGE ROADS | VELLANAD | YES | TANGIBLE | Completed | |
1595 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-60-4311 | KUNNATHKONAM KOTTAVILA SC ROAD TARRING | INTER VILLAGE ROADS CONNECTIVITY | CULVERT ON INTER VILLAGE ROADS | VELLANAD | YES | TANGIBLE | Completed | |
1596 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-6-60-4313 | KAANAKKUZHY PEZHUM MOODU BY LANE | INTER VILLAGE ROADS CONNECTIVITY | CULVERT ON INTER VILLAGE ROADS | ARYANAD | YES | TANGIBLE | Completed | |
1597 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-7-64-88480 | BUS PURCHASE FOR PAZHAYATHERUVU LPS | PUBLIC TRANSPORT | COMMERCIAL TRANSPORT (BUSES/MAGIC PICK-UP ETC.) UNDER CONVERGENCE | ARYANAD | YES | TANGIBLE | Completed | |
1598 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-7-64-88605 | SCHOOL BUS PURCHASE FOR VELIYANNOOR LPS | PUBLIC TRANSPORT | COMMERCIAL TRANSPORT (BUSES/MAGIC PICK-UP ETC.) UNDER CONVERGENCE | VELLANAD | YES | TANGIBLE | Completed | |
1599 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-7-64-88607 | SCHOOL BUS PURCHASE FOR SANKARAMANGALAM LPS | PUBLIC TRANSPORT | COMMERCIAL TRANSPORT (BUSES/MAGIC PICK-UP ETC.) UNDER CONVERGENCE | VELLANAD | YES | TANGIBLE | Completed | |
1600 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-7-70-114930 | CONSTRUCTION OF BUS SHELTER AT MELMCODE JUNCTION | PUBLIC TRANSPORT | PASSENGERS SHED AT BUS STOPS | VELLANAD | YES | TANGIBLE | Completed | |
1601 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-7-70-5266 | MUNDELA WAITING SHED MAINTENANCE | PUBLIC TRANSPORT | PASSENGERS SHED AT BUS STOPS | VELLANAD | YES | TANGIBLE | Completed | |
1602 | KERALA | THIRUVANANTHAPURAM | VELLANAD - ARYANAD CLUSTER | W-244-9-81-5310 | CONSTRUCTION OF TRAINING BUILDING FOR SKILL DEVELOPMENT | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT INFRASTRUCTURE/INSTITUTIONAL SUPPORT | VELLANAD | YES | TANGIBLE | Completed | |
1603 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-1-4-30378 | ANDATHODU PANATHARA SRO DRINKING WATER PROJECT | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1604 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-1-4-30379 | KETTUNGAL DRINKING WATER PROJECT | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1605 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-1-4-30380 | PANATHARA DRINKING WATER PROJECT | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1606 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-1-4-30383 | CHERAI DRINKING WATER PROJECT | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1607 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-1-4-30384 | KOOTTILINGAL COLONY DRINKING WATER PROJECT | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1608 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-1-4-30385 | KOONATHIL DRINKING WATER PROJECT | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1609 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-1-4-30386 | CHAMANNUR DRINKING WATER PROJECT | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1610 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-1-4-30387 | NAYADITHARA MINI DRINKING WATER PROJECT | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | VADEKKEKAD | YES | TANGIBLE | Completed | |
1611 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-1-4-30389 | ULIYANGAD MINI DRINKING WATER PROJECT | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | VADEKKEKAD | YES | TANGIBLE | Completed | |
1612 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-1-4-30391 | MALIYEKKAL COLONY MINI DRINKING WATER PROJECT | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | VADEKKEKAD | YES | TANGIBLE | Completed | |
1613 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-1-4-30392 | KADAMPULLI COLONY MINI DRINKING WATER PROJECT | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | VADEKKEKAD | YES | TANGIBLE | Completed | |
1614 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-1-4-30401 | ANJUR MINI DRINKING WATER PROJECT AND LINE EXTENSION | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | VADEKKEKAD | YES | TANGIBLE | Completed | |
1615 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-10-137-32047 | CANOLI CANAL WALL PROTECTION FOR PREVENTING SALT WATER | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1616 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-10-137-32048 | CHAKKITHARA PERUMTHODU SIDE PROTECTION WORK | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION (LIFT/DRIP/SPRINKLER/CANAL) | VADEKKEKAD | YES | TANGIBLE | Completed | |
1617 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-10-142-32017 | MODERNISATION NAYARANGADI MARKET | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | MARKET FOR AGRI AND RELATED PRODUCE | VADEKKEKAD | YES | TANGIBLE | Completed | |
1618 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-11-171-32023 | CHERAI SCHOOL MODIFICATION BY PROVIDING NEW BUILDING WARD 3 | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1619 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-11-171-32024 | KOPRAVALLI SCHOOL MODIFICATION WARD 9 | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1620 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-11-171-32025 | PUNNAYOORKULAM SCHOOL MODIFICATION WARD 4 | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1621 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-11-171-32026 | CHEMMANNUR SCHOOL MODIFICATION WARD 8 | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1622 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-11-171-32027 | RENOVATION OF GOVT HSS KOCHANNUR AT WARD 5 | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VADEKKEKAD | YES | TANGIBLE | Completed | |
1623 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-11-171-32029 | CONSTRUCTION OF COMPUND WALL AT GHSS KOCHANNUR WARD 5 | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | VADEKKEKAD | YES | TANGIBLE | Completed | |
1624 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-12-195-32019 | ANDATHHODU PHC MODIFICATION ALONG WITH PALLIATIVE CARE UNIT LAB AND QUARTERS | HEALTH | CONSTRUCTION/UPRADATION OF PHC | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1625 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-12-203-32018 | HEALTH COMPLEX AT THRIPPAT INCLUDING SHE HEALTH FITNESS CENTRE AYUSH AT WARD 4 | HEALTH | CONSTRUCTION/RENOVATION OF ANM CENTER | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1626 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-12-203-32042 | HOMELY HEALTH CARE SHELTER AT CHERAI WARD 3 | HEALTH | CONSTRUCTION/RENOVATION OF ANM CENTER | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1627 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-13-208-32045 | DIGITAL LIBRARY CUM INFORMATION CENTRE ALONG WITH PHC AT ANDATHODU WARD 18 | DIGITAL LITERACY | DIGITAL TRAINING CENTER OR E BANKING LITERACY CENTRE OR KNOWLEDGE RESOURCE CENTRE | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1628 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-13-292-32044 | CHERAI SCHOOL MODIFICATION BY PROVIDING SMART CLASS ROOM 8 NOS WARD 2 | DIGITAL LITERACY | CONSTRUCTION OR UPGRADATION OR PROVISION OF EQUIPMENTS IN SMART CLASSROOM | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1629 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-18-241-32050 | CULTURAL COMPLEX CUM ART GALLERY ANDATHODU | TOURISM PROMOTION | HERITAGE VILLAGE AND TOURISM | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1630 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-2-17-30409 | PROVIDING CAMERAS ON ACTIVE CENTRES VAZHIKKANNU | SANITATION | BUILDING OF PUBLIC TOILETS (BUS STOP/MARKET/ OTHER IDENTIFIED PLACES ETC.) | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1631 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-28-283-30448 | COMPLETION OF INCOMPLETE HOUSES OF SC AND GENERAL PHASE I AND CONSTRUCTION OF NEW HOUSES UNDER LIFE MISSION | RURAL HOUSING | HOUSES UNDER CENTRAL/STATE RUN SCHEMES (CONVERGENCE) | VADEKKEKAD | YES | TANGIBLE | Completed | |
1632 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-3-34-30416 | MODERN CREMATORIUM AT PARUR WARD 9 | SOLID AND LIQUID WASTE MANAGEMENT | INFRASTRUCTURE DEVELOPMENT FOR DE-CENTRALISED SOLID WASTE MANAGEMENT | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1633 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-33-289-32030 | CONSTRUCTION OF NEW ANGANWADI A TWARD 6 NO 22 | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1634 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-33-289-32031 | NEW ANGANWADI AT WARD 7 NO 30 | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1635 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-33-289-32033 | NEW ANGANWADI BUILDING AT WARD 17 NO 7 | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1636 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-33-289-32035 | NEW ANGANWADI BUILDING AT WARD 3 NO 17 | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1637 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-33-289-32036 | NEW ANGANWADI BUILDING AT WARD 9 NO 28 | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1638 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-33-289-32037 | CONSTRUCTION OF ANGANWADI NO 80 AT WARD 16 | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | VADEKKEKAD | YES | TANGIBLE | Completed | |
1639 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30419 | CONSTRUCTION OF KETTUNGAL TANGALPADI MOVING BRIDGE | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1640 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30420 | ROAD MAINTENANCE AND RETARRING WORKS OF ALL WARDS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1641 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30423 | CONSTRUCTION OF GURUVAYOOR VANNERI STATEHIGH WAY | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1642 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30426 | CONSTRUCTION OF PERIYAMBALAM BEACH ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1643 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30427 | IMPROVEMENT OF DUBAI ROAD IN WARD 12 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1644 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30428 | IMPROVEMENT OF ANDATHODU NAKKOLA PADAM ROAD IN WARD 2 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1645 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30429 | IMPROVEMENTS IN ATHIRTHI PALATHINGAL ROAD IN WARD 8 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1646 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30431 | CONSTRUCTION OF PUDUMANAPILLY ROAD WARD 1 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1647 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30433 | CONSTRUCTION OF MURIYAMTADAM ROAD IN WARD 3 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1648 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30434 | CONSTRUCTION OF CHEKOTTAPPARAMBHU ROAD WARD 4 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1649 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30435 | CONSTRUCTION OF MUJAHID ROAD WARD 5 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1650 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30436 | ROAD MAINTENANCE AND RETARRING WORKS FOR ALL WARDS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1651 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30437 | CONSTRUCTION OF POOKOTTIRI ROAD WARD 7 CONCRETE | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1652 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30438 | CONSTRUCTION OF PAYYAPANTHAL ROAD WARD 8 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1653 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30439 | CONSTRUCTION OF ST FRANCIS SCHOOL ROAD WARD 9 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1654 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30440 | CONSTRUCTION OF THATTAMTHARA PATHIYERI ROAD WARD 10 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1655 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30442 | CONSRCTION OF PAICHAKKAL ROAD WARD 11 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1656 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30443 | CONSTRUCTION OF VEETIPPARAMBIL KARNAKKAL PALLI ROAD WARD 12 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1657 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30444 | CONSTRUCTION OF KOMBANTHARA MULAKKACHERY ROAD WARD 14 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1658 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30445 | CONSTRUCTION OF SHAMEER ROAD WARD 16 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1659 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-4-44-30446 | CONSTRUCTION OF KARAKKATTAYIL ROAD WARD 15 | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VADEKKEKAD | YES | TANGIBLE | Completed | |
1660 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-5-48-32004 | LINE EXTENSION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTRA VILLAGE STREET LIGHT | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1661 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-5-49-32006 | LINE EXTENSION AND STREET LIGHTING | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | VADEKKEKAD | YES | TANGIBLE | Completed | |
1662 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-5-53-32001 | SOLAR CONVERSION ON PANCHAYATH BUILDING AT WARD | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1663 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-5-53-32002 | SOLAR CONVERSION ON PHC ANDATHODU WARD 18 | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUNNYURKULUM | YES | TANGIBLE | Completed | |
1664 | KERALA | THRISSUR | PUNNAYOORKULAM VADAKKEKKAD RURBAN CLUSTER | W-243-5-53-32003 | SOLAR CREMATORIUM PARUR WARD 9 | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PUNNYURKULUM | YES | TANGIBLE | Completed |