Sl.No | State Name | District Name | Cluster Name | Work Code | Work Name | Component Name | Sub Component Name | GP Name | Work Details Entered | Work Category | Status | View Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-134-57481 | KEEZHATHUR VCB | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | GUARD WALL FOR FARM FIELD/ WATER BODIES FOR AGRI PUPORSE/ LIVE STOCK CENTRE | VENGAD | YES | TANGIBLE | Completed | |
2 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-138-57452 | SIDE PROTECTION OF VELLUVAKKANDI STREAM THODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | PINARAYI | YES | TANGIBLE | Completed | |
3 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-138-57454 | CONSTRUCTION OF RETAINING WALL AND VCB AT KIZHAKKUMBHAGAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | IRRIGATION CHANNEL | PINARAYI | YES | TANGIBLE | Completed | |
4 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-146-57476 | PRODUCTION OF ORGANIC FOOD AND VEGETABLES | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | ORGANIC FARMING | VENGAD | YES | TANGIBLE | Completed | |
5 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-149-113922 | FRUITS PLANT DISTRIBUTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | PLANTATION (FRUIT AND OTHER, NOT FOR ENVIRONMENT PURPOSE) | VENGAD | YES | TANGIBLE | Completed | |
6 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-149-113932 | DEVELOPMENT OF INTER CROP | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | PLANTATION (FRUIT AND OTHER, NOT FOR ENVIRONMENT PURPOSE) | VENGAD | YES | TANGIBLE | Completed | |
7 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-149-113934 | PADDY CULTIVATION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | PLANTATION (FRUIT AND OTHER, NOT FOR ENVIRONMENT PURPOSE) | VENGAD | YES | TANGIBLE | Completed | |
8 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-149-57478 | PEPPER VILLAGE PROGRAMME | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | PLANTATION (FRUIT AND OTHER, NOT FOR ENVIRONMENT PURPOSE) | VENGAD | YES | TANGIBLE | Completed | |
9 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-149-57479 | COCONUT FARMING EXPANSION OF HIGH YIELD COCONUT SEEDLINGS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | PLANTATION (FRUIT AND OTHER, NOT FOR ENVIRONMENT PURPOSE) | VENGAD | YES | TANGIBLE | Completed | |
10 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-149-57480 | BANANA CULTIVATION PROGRAMME | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | PLANTATION (FRUIT AND OTHER, NOT FOR ENVIRONMENT PURPOSE) | VENGAD | YES | TANGIBLE | Completed | |
11 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-113938 | SIDE PROTECTION WALL TO MOUVERI THODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
12 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-113942 | SIDE PROTECTION WALL TO CHERIKKAL THODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
13 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-114075 | CONSTRUCTION OF VCB ACROSS KARADI THODU AT ILLATHANKANDI | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
14 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-114077 | RENNOVATION OF PANUNDAKULAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
15 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-114081 | RENNOVATION OF CHIRAYIL KULAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
16 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-57456 | RENOVATION OF OTHAYOTH POND | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
17 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-57462 | RENOVATION OF CHEMMARASSERY MAHADEVA KSHETRAKULAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
18 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-57466 | RENOVATION OF THANNUMANGALAM VISHNU KSHETRAKULAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
19 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-57469 | RENNOVATION OF CHERIKKAL KULAM | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | PINARAYI | YES | TANGIBLE | Completed | |
20 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-57482 | POND CONSTRUCTION | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | VENGAD | YES | TANGIBLE | Completed | |
21 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-10-302-74978 | SIDE PROTECTION WORK OF 12 THODU | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | BUILDING OR AUGMENTING OR RENOVATING WATER BODIES AS CANAL WELL POND ETC | VENGAD | YES | TANGIBLE | Completed | |
22 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-11-171-57492 | COMPUND WALL AT AKG SCHOOL | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | PINARAYI | YES | TANGIBLE | Completed | |
23 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-11-171-57493 | BUILDING FOR AKG SCHOOL | EDUCATION | CONSTRUCTION/UPGRADATION OF SCHOOL | PINARAYI | YES | TANGIBLE | Completed | |
24 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-11-174-57495 | SCIENCE LAB AT VENGAD GHSS | EDUCATION | ESTABLISHMENT OF SCIENCE LABS | VENGAD | YES | TANGIBLE | Completed | |
25 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-12-192-74981 | HOMEO DISPENSARY CENTRE PARAPRAM | HEALTH | CONSTRUCTION OR UPGRADATION OF AYURVEDIC OR HOMOEOPATHIC OR UNANI HOSPITAL | PINARAYI | YES | TANGIBLE | Completed | |
26 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-17-338-74610 | FISH FARMING IN ARTIFICIAL POND | EMPLOYMENT GENERATION AND SHG FORMATION | FARM AND NON FARM LIVELIHOOD | VENGAD | YES | TANGIBLE | Completed | |
27 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-18-245-57486 | MALANAD NORTH MALABAR RIVER CRUISE TOURISM BOAT TERMINAL AT PARAPRAM | TOURISM PROMOTION | RAILING OR FLOATING JETTY OR WOODEN JETTY | PINARAYI | YES | TANGIBLE | Completed | |
28 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-2-17-57053 | COMMUNITY TOILET COMPLEX AT PANCHAYAT BUS STAND ANJARAKKANDY CIVIL WORK | SANITATION | BUILDING OF PUBLIC TOILETS (BUS STOP/MARKET/ OTHER IDENTIFIED PLACES ETC.) | VENGAD | YES | TANGIBLE | Completed | |
29 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-2-298-57041 | CONSTUCTION OF TOILET AT SARADA VILASAM JBS AND GANAPATHI VILASAM UPS | SANITATION | IEC ON SANITATION TOILET USAGE OTHER ACTIVITIES | PINARAYI | YES | TANGIBLE | Completed | |
30 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-2-298-57043 | NAPKIN VENDING MACHINE AND DESTROYER TO SIX UPS AND GOVT INSTITUTIONS | SANITATION | IEC ON SANITATION TOILET USAGE OTHER ACTIVITIES | PINARAYI | YES | TANGIBLE | Completed | |
31 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-2-298-57045 | SANITATION FACILITIES AT MAMBARAM UPS KEEZHATHUR UPS AND KUNNIRIKKA UPS | SANITATION | IEC ON SANITATION TOILET USAGE OTHER ACTIVITIES | VENGAD | YES | TANGIBLE | Completed | |
32 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-2-298-57047 | TOILETS FOR 2 UPS AND 3LPS | SANITATION | IEC ON SANITATION TOILET USAGE OTHER ACTIVITIES | VENGAD | YES | TANGIBLE | Completed | |
33 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-2-298-57050 | GIRLS FRIENDLY TOILETS FOR 6 SCHOOLS | SANITATION | IEC ON SANITATION TOILET USAGE OTHER ACTIVITIES | VENGAD | YES | TANGIBLE | Completed | |
34 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-20-300-57505 | STADIUM DEVELOPMENT | SPORTS INFRASTRUCTURE | PLAY GROUND OR STADIUM DEVELOPMENT AND RELATED ACTIVITIES | VENGAD | YES | TANGIBLE | Completed | |
35 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-3-25-114141 | RING COMPOST FOR HOUSEHOLDS | SOLID AND LIQUID WASTE MANAGEMENT | CONSTRUCTION OF COMMUNITY SOAK/ VERMI COMPOST PITS | PINARAYI | YES | TANGIBLE | Completed | |
36 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-3-36-57055 | PLASTIC BOTTLE COLLECTION BOOTH AT PANCHAYAT BUS STAND TOWNS AND MAIN ROADS | SOLID AND LIQUID WASTE MANAGEMENT | INSTALLATION OF DUSTBINS FOR DRY AND WET WASTE FOR COMMUNITY OR HOUSEHOLDS | PINARAYI | YES | TANGIBLE | Completed | |
37 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-3-36-57056 | WASTE MANAGEMENT AT SOURCE INSTALLATION OF RING COMPOSTING FOR HOUSE HOLDS WASTE MANAGEMENT | SOLID AND LIQUID WASTE MANAGEMENT | INSTALLATION OF DUSTBINS FOR DRY AND WET WASTE FOR COMMUNITY OR HOUSEHOLDS | VENGAD | YES | TANGIBLE | Completed | |
38 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-3-36-57058 | WASTE MANAGEMENT AT SOURCE INSTALLATION OF RING COMPOSTING FOR SCHOOLS AND TRANSFERED INSTITUTIONS | SOLID AND LIQUID WASTE MANAGEMENT | INSTALLATION OF DUSTBINS FOR DRY AND WET WASTE FOR COMMUNITY OR HOUSEHOLDS | VENGAD | YES | TANGIBLE | Completed | |
39 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-33-289-57496 | CONSTRUCTION OF PADANNAKKARA ANGANAWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PINARAYI | YES | TANGIBLE | Completed | |
40 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-33-289-57497 | CONSTRUCTION OF UMMENCHIRA ANGANAWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PINARAYI | YES | TANGIBLE | Completed | |
41 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-33-289-57498 | CONSTRUCTION OF KOZHUR BANIYAN COMPANY ANGANWADI | SOCIAL WELFARE | CONSTRUCTION/UPGRADATION OF ICDS CENTRES/ANGANWADI | PINARAYI | YES | TANGIBLE | Completed | |
42 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-57060 | CONSTRUCTION OF 18 ROADS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
43 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74530 | KATTUMADAM JAYAN COMPANY ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
44 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74531 | MAYAVIPEEDIKA KAPPANAKAD ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
45 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74532 | MAHATHMA VAYANASHALA ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
46 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74533 | PALAKANDI GTC ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
47 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74535 | KAPPANAKKAD PATTASHAP ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
48 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74541 | PANTHAKKAPARA STADIUM PUTHUSSERIMUKKU ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Completed | |
49 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74542 | ROAD TARRING OF SAFIYA MUKKU TO CHALIL THAZHE WARD X | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
50 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74543 | COMPANYMETTA PADINJITTAMMURI ROAD TARRING WARD XII | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
51 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74544 | THEKKINATH PARAMBATHMUKKU ROAD TARRING WARD XIV | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
52 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74546 | THOOKKUPALAM MANAKKADAVAN ROAD TARRING WARD XV | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
53 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74547 | KEEZHATHUR VAYANASALA RAYAROTH KAVU ROAD TARRING BALANCE PORTION WARD XVI | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
54 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74549 | MUNEER PEEDIKA ROAD TARRING WARD XVII | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
55 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74550 | KANDOTHMUKKU THADATHIL THAZHE ROAD TARRING WARD XVII | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
56 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74551 | MAKKUTTATHIL THAZHE KUZHICHAL ROAD TARRING WARD XVIII | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
57 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74553 | VILAYOD EMS VAYANASALA VYRIKHATHAKAN KSHETHRAM ROAD TARRING WARD XX | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
58 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74554 | PANCHAYATH KINAR CHIRAMMAL ROAD TARRING WARD XXI | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
59 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74962 | CONSTRUCTION OF 46 ROADS WITH DRAINS | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Completed | |
60 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-47-57100 | IMPROVEMENT OF SUB TRANSMISSION AND DISTRIBUTION NETWORK | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | PINARAYI, VENGAD | YES | TANGIBLE | Completed | |
61 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-49-57095 | EXTENSION OF STREET MAIN PINARAYI ELECTRICAL SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | PINARAYI | YES | TANGIBLE | Completed | |
62 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-49-57097 | EXTENSION OF STREET MAIN VENGAD SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | VENGAD | YES | TANGIBLE | Completed | |
63 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-49-74772 | EXTENSION OF STREET MAINKADIRUR ELECTRICAL SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | PINARAYI | YES | TANGIBLE | Completed | |
64 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-49-74773 | EXTENSION OF STREET MAIN VENGAD ELECTRICAL SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | PINARAYI | YES | TANGIBLE | Completed | |
65 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-49-74774 | EXTENSION OF STREET MAIN PINARAYI SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | VENGAD | YES | TANGIBLE | Completed | |
66 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-49-74775 | EXTENSION OF STREET MAIN CHAKKARAKKAL SECTION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | VENGAD | YES | TANGIBLE | Completed | |
67 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-53-57096 | ESTABLISHMENT OF STREET LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | PINARAYI | YES | TANGIBLE | Completed | |
68 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-53-57098 | ESTABLISHMENT OF STREET LIGHT | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | VENGAD | YES | TANGIBLE | Completed | |
69 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-5-55-57101 | ESTABLISHMENT OF SOLAR POWER PLANTS AT ROOF TOPS OF VARIOUS BUILDINGS UNDER GP ONGRID | VILLAGE STREET LIGHTS AND ELECTRIFICATION | SOLAR PLANT INTEGRATED WITH GRID LINES OR WITHOUT GRID | VENGAD | YES | TANGIBLE | Completed | |
70 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-56-57084 | BRIDGE TO CONNECT VELLUVAKKANDIKULAM CHETTYARAMBATH PC DOCTORMUKKU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION OF BRIDGE FOR INTER VILLAGE CONNECTIVITY | PINARAYI | YES | TANGIBLE | Completed | |
71 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-58-57082 | FOOTPATH CONSTRUCTION | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/ UPGRADATION OF PEDESTAL FOOTPATH ON INTER VILLAGE ROADS | PINARAYI | YES | TANGIBLE | Completed | |
72 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-114084 | HEALTH CENTRE MEETHALE VALAPP ROAD TARRING | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
73 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57070 | 7 FLOOD ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
74 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57073 | PARAPRAM AMBUPEEDIKA SCHOOL PUZHAKKARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
75 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57074 | KATTILPEEDIKA ACHAN VEEDU | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
76 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57076 | EDAKKADAVU PUTHIYAPALAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
77 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57077 | ANDALOORKADAV PALAM BAALERI VEEDU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
78 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57078 | KULANGAROTH AP LAKSHMANAN ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
79 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57079 | PANDYALAMUKKU RAYAROTH POYIL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
80 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57081 | ARAYALTHARA THUNDIKANDI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
81 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57083 | PARAPRAM BANK ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
82 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57085 | EDAKKADAV PUTHIYAPALAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
83 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57086 | KINAVAKKAL PATHIRIYAD CHAMPAD ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
84 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57090 | CHERUVARIMUKKU PARAMBAYI PALLI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
85 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57092 | ROAD MAINTENANCE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
86 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57093 | ROAD CONSTRUCTION VENMANAL MULAMKANDAM ROAD TARRING WARD I | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
87 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-57094 | KOLASSERRY KAYALODE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI, VENGAD | YES | TANGIBLE | Completed | |
88 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74654 | THUNDIKANDIKETTU MUTHAL MUNDAYIL THAZHE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
89 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74655 | THAMBIPEEDIKA KUNJAMBU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
90 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74656 | ERANCHERI KARALIKKADU LAKSHAM VEEDU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
91 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74658 | PUTHUSSERI KELOTHUMUKKU VAYALIL THAZHE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
92 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74659 | PUTHANKANDAM KAITHERI PUTHIYEDATH ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
93 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74660 | KETHARAM KOZHUR VAYAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
94 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74661 | VELANDIMUKKU SAFDAR HASHMI CLUB ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
95 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74662 | OLAYIKKARA TRANSFORMER KANNUR KUTHUPARAMBA TOUCH ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
96 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74663 | KOOTHUPARAMB RAKTHASAKSHI MANDAPAM SANTHI NAGAR ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
97 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74664 | PANUNDA AGRICULTURAL BHAGAT SINGH CENTRE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
98 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74665 | POTTANPARA CHAMALI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
99 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74666 | MULLANKUNNU ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
100 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74667 | PUTHUSSERIMUKKU NAYANAR SMARAKA MANDHIRAM MUNVASHAM KODAKKAT VAYAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
101 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74668 | MAMMALIYIL THAZHE SREEDHARAN PEEDIKA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
102 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74669 | KUNJIPALLI KOTTARATHIL THAZHE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
103 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74670 | PULIYANDI MUKKU MUNNOTANTAVDE | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
104 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74671 | KINAVAKKAL MUKKU THAIPARAMBIL | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
105 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74672 | THERU ANGANVADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
106 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74673 | EMS ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
107 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74674 | CHEKIKUNIPALAM KUNNUMMAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
108 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74675 | ERANJIYULLATHIL KOZHUR VAYAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
109 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74676 | ROAD TARRING OF KALLAYI PUBLIC WELL TO PALLIKKAL ROAD WARD II 300M | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
110 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74678 | ROAD TARRING FOR SUNNICENTRE INJIYIL ROAD FROM CHAINAGE 0200KM TO 0465KM WARD III | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
111 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74680 | ROAD TARRING IN HEALTH CENTRE ANGANVADI FROM CHEMBAN MUKKU TO SEEDFARM VAYAL WARD V | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
112 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74681 | KURYODE SEED FARM VAYAL ROAD WARD V | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
113 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74682 | VENGAD GP PALLIKKAD KALLUPRATHMUKKU SEED FARM VAYAL ROAD WARD V | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
114 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74683 | ROAD TARRING OF URPALLI KURYOD URAVUKUNDU ROAD WARD V | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
115 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74684 | ROAD TARRING OF URPALLI SCHOOL ROAD WARD VI | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
116 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74686 | ROAD TARRING OF KIZHAKKE NIRATHTHVERUKANDY ROAD TARRING WARD VIII | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
117 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74687 | ROAD TARRING SANKARANELLUR CHANDROTH THAZHE ROAD WARD IX | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
118 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74688 | ROAD TARRING OF PATHIRIYAD HIGH SCHOOL TO GURUDEVI KSHETHRAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
119 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74689 | PVS GRAMEEN VAYANASHALA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
120 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74690 | ROAD TARRING OF DEVAR KOTTAM TO CHETTUKUNDUNNAL THAZHE ROAD WARD X | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
121 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74691 | ROAD TARRING OF KGMUKKU TOKASHANA PARAMB ROAD WARD X | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
122 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74692 | PACHA POYIKA PUNNAD STADIUM ROAD WARD XI | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
123 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74693 | NALLAKKANDY MUKKU MELEKAYALOD ROAD TARRING WARD X | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
124 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74694 | SREE NARAYANA KANALKARA ROAD TARRING WARD XII | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
125 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74695 | SIVAPRAKASHAM UP SCHOOL CHAMUNDESHWEARI ROAD TARRING WARD XIII | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
126 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74963 | KUNNUNCHAL MADAPPURA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
127 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74964 | ERANCHERI PUTHANKANDAM ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
128 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74965 | PULARI CLUB ANGANVADI ROAD TO KUZHIYILE PEEDIKA | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
129 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74966 | KOROTH KRISHNAN ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
130 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74967 | PARAMBAN MADAPPURA CANAL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
131 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74968 | ANNERIYIL THAZHE ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
132 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74974 | CHALIL MADAPPURA KALLU SHOP ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
133 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74976 | PUTHIYOTTILAKAD ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
134 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74977 | PINARAYI WEST ANGANVADI ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
135 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-75217 | CONSTRUCTION OF 67 ROADS | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Completed | |
136 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-75307 | KATTILPEEDIKA KUNIYIL ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
137 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-75312 | THUNDIKANDIKETTU ARAYALTHARA ROAD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | PINARAYI | YES | TANGIBLE | Completed | |
138 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-1-4-57040 | EXTENSION OF PIPE LINE TO VARIOUS WARDS | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | VENGAD | YES | TANGIBLE | Ongoing | |
139 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-14-319-57509 | UPGRADATION OF FRONT OFFICE AND MODERNISATION OF TRANSFERRED INSTITUTIONS | CITIZENS SERVICE CENTRES | INFRA FACILITIES OR DEVELOPMENT RELATED GRAM PANCHAYAT GOVERNMENT OR COMMUNITY BUILDING | PINARAYI | YES | TANGIBLE | Ongoing | |
140 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74537 | CHATHUMASTER LINK ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Ongoing | |
141 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74538 | PANUNDA AMBALAM ROAD | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | PINARAYI | YES | TANGIBLE | Ongoing | |
142 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74545 | BABU PEEDIKA MUNDATHADATHIL ROAD TARRING WARD XV | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Ongoing | |
143 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-4-44-74555 | PAZHASSI CANAL PARADANJAL ROAD TARRING WARD XXI | ACCESS TO VILLAGE STREETS WITH DRAINS | CONSTRUCTION/RENOVATION OF VILLAGE STREET WITH/WITHOUT DRAINS | VENGAD | YES | TANGIBLE | Ongoing | |
144 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-58-57091 | FOOTPATH CONSTRUCTION | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/ UPGRADATION OF PEDESTAL FOOTPATH ON INTER VILLAGE ROADS | VENGAD | YES | TANGIBLE | Ongoing | |
145 | KERALA | KANNUR | PINARAYI - VENGAD CLUSTER | W-317-6-59-74685 | ROAD TARRING FROM SASIDHARAN PEEDIKA TO PARAKKANDI THAZHE WARD VII | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | VENGAD | YES | TANGIBLE | Ongoing |