1 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-1-8-3701 | CONSTRUCTION OF 160 WATER HARVESTING TANKS @1.13 LAKHS/TANK | PIPED WATER SUPPLY | OVER HEAD TANK UPGRADATION AND CONSTRUCTION | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | TANGIBLE | Completed | |
2 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-1-8-3706 | CONSTRUCTION OF STORAGE RESERVOIR 50000 LITERS | PIPED WATER SUPPLY | OVER HEAD TANK UPGRADATION AND CONSTRUCTION | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | TANGIBLE | Completed | |
3 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-10-157-3621 | FODDER DEVELOPMEN AT 279 HECTARS FROM NAFCC AND MGNREGA | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | UPGARDATION OF AGRICULTURE FARM LAND | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | TANGIBLE | Completed | |
4 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-10-157-3658 | HORTICULTURE DEVELOPMENT AT 255 HECTARS NAFCC AND MGNREGA | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | UPGARDATION OF AGRICULTURE FARM LAND | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | TANGIBLE | Completed | |
5 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-10-157-3660 | ORGANIC FODDER NURSERY | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | UPGARDATION OF AGRICULTURE FARM LAND | NAGI KAREK | YES | INTANGIBLE | Completed | |
6 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-10-157-3671 | SECONDARY STORAGE 30 & 50 CU. M. WATER STORAGE TANKS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | UPGARDATION OF AGRICULTURE FARM LAND | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | INTANGIBLE | Completed | |
7 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-10-157-3686 | MGNREGA CONVERGENCE 52 X 20,000 AND 128X10000 LTRS WATER TANKS | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | UPGARDATION OF AGRICULTURE FARM LAND | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | TANGIBLE | Completed | |
8 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-10-159-3666 | UPGRADATION OF EXISTING DISPENSARY TO HOSPITAL AT NAMTHANG MANEYDARA | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | VETERINARY BUILDING/DISPENSARY CONSTRUCTION/UPGRADATION | NAMTHANG MANEYDARA | YES | TANGIBLE | Completed | |
9 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-11-170-3598 | CONSTRUCTION OF PUBLIC GROUND AT UPPER PHAMPHOK | EDUCATION | CONSTRUCTION OF PLAY GROUND/ BASKET BALL/VOLLEYBALL COURT INSIDE SCHOOL | KATENG PAMPHOK | YES | TANGIBLE | Completed | |
10 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-11-170-3600 | EXTENSION OF SCHOOL PLAYGROUND AT BORBOTEY PS, LOWER KABREY | EDUCATION | CONSTRUCTION OF PLAY GROUND/ BASKET BALL/VOLLEYBALL COURT INSIDE SCHOOL | NAGI KAREK | YES | TANGIBLE | Completed | |
11 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-18-241-3608 | CONSTRUCTION OF TAMANG COMMUNITY CULTURAL CENTRE AT KATENG | TOURISM PROMOTION | HERITAGE VILLAGE AND TOURISM | KATENG PAMPHOK | YES | TANGIBLE | Completed | |
12 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-18-244-3602 | CONSTRUCTION OF PUBLIC CONVENIENCE CUM CAFETERIA AT ALLEY WARD. | TOURISM PROMOTION | PUBLIC CONVENIENCE CUM CAFETERIA NEAR TOURIST SITES | NAMTHANG MANEYDARA | YES | TANGIBLE | Completed | |
13 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-18-244-3605 | CONSTRUCTION OF PUBLIC TOILET CUM WAYSIDE CAFETARIA AT NAMTHANG RANGPO ROAD | TOURISM PROMOTION | PUBLIC CONVENIENCE CUM CAFETERIA NEAR TOURIST SITES | TURUNG MAMRING | YES | TANGIBLE | Completed | |
14 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-21-269-3762 | NEW CONST OF MULTI STOREY GPK AT NAMTHANG MANEYDARA AND KATENGPHAMPHOK WITH CONFERENCE HALL | SOCIAL INFRASTRUCTURE | CONSTRUCTION/UPRADATION OF COMMUNITY/BANQUET HALL/PANCHAYAT GHAR | KATENG PAMPHOK, NAMTHANG MANEYDARA | YES | TANGIBLE | Completed | |
15 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-3-33-3719 | CONSTRUCTION OF RESOURCE RECOVERY CENTRE AT TURUNGMAMRING | SOLID AND LIQUID WASTE MANAGEMENT | INFRASTRUCTURE DEVELOPMENT FOR CENTRALISED SOLID WASTE MANAGEMENT | TURUNG MAMRING | YES | TANGIBLE | Completed | |
16 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-3-33-3723 | EXTENSION OF PIPELINE AND WATER STORAGE TANK AT EXISTING R R C | SOLID AND LIQUID WASTE MANAGEMENT | INFRASTRUCTURE DEVELOPMENT FOR CENTRALISED SOLID WASTE MANAGEMENT | CHUBA PHONG | YES | TANGIBLE | Completed | |
17 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-4-45-3577 | CCFP FROM GPK TO BULL VIA SANSARIDARA AT NAMTHANG MANEYDARA GPU | ACCESS TO VILLAGE STREETS WITH DRAINS | FOOTPATH | NAMTHANG MANEYDARA | YES | TANGIBLE | Completed | |
18 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-4-45-3578 | CCFP FROM GHANTIDARA TO BAARPIPAL AT KATENGPHAMPHOK GPU | ACCESS TO VILLAGE STREETS WITH DRAINS | FOOTPATH | KATENG PAMPHOK | YES | TANGIBLE | Completed | |
19 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-4-45-3580 | CCFP FROM SUNTALEY GAON TO LOWER PAMPHOK AT KATENGPHAMPHOK GPU | ACCESS TO VILLAGE STREETS WITH DRAINS | FOOTPATH | KATENG PAMPHOK | YES | TANGIBLE | Completed | |
20 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-4-45-3581 | CCFP FROM DALIMGOLAI TO BHANDARI GOAN AT TURUNGMAMRING GPU | ACCESS TO VILLAGE STREETS WITH DRAINS | FOOTPATH | TURUNG MAMRING | YES | TANGIBLE | Completed | |
21 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-4-45-3582 | CCFP FROM PARSAI TO MURCHAL CREMATORIUM DARA AT TURUNG MAMRING GPU | ACCESS TO VILLAGE STREETS WITH DRAINS | FOOTPATH | TURUNG MAMRING | YES | TANGIBLE | Completed | |
22 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-4-45-3583 | CCFP FROM DISPENSARY TO SHIVA MANDIR AT CHUBA PHONG GPU | ACCESS TO VILLAGE STREETS WITH DRAINS | FOOTPATH | CHUBA PHONG | YES | TANGIBLE | Completed | |
23 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-4-45-3584 | CCFP FROM PMGSY RD NAGI TO NAGI PRI SCHOOL AT NAGI KAREK GPU | ACCESS TO VILLAGE STREETS WITH DRAINS | FOOTPATH | NAGI KAREK | YES | TANGIBLE | Completed | |
24 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-4-45-3586 | CCFP FROM RUCHUNGPR SCHOOL TO ICDS CENTRE RUCHUNG AT NAG IKAREK GPU | ACCESS TO VILLAGE STREETS WITH DRAINS | FOOTPATH | NAGI KAREK | YES | TANGIBLE | Completed | |
25 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-4-45-3587 | CCFP FROM NAMTHANG PHC TO DURGA MANDIR AT NAMTHANG MANEYDARA GPU | ACCESS TO VILLAGE STREETS WITH DRAINS | FOOTPATH | NAMTHANG MANEYDARA | YES | TANGIBLE | Completed | |
26 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-4-46-3591 | JTW NEAR CHUBA PHONG GPK | ACCESS TO VILLAGE STREETS WITH DRAINS | VILLAGE DRAIN (ON GROUND/UNDER GROUND) CONSTRUCTION | CHUBA PHONG | YES | TANGIBLE | Completed | |
27 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-5-47-3729 | UPGRADATION OF EXISTING 10KVA SUBSTATION TO 25 KVA | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | NAGI KAREK | YES | TANGIBLE | Completed | |
28 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-5-47-3733 | UPGRADATION OF EXISTING 10KVA SUBSTATION TO 25 KVA SUBSTATION AND 25KVA TO 63KVA SUBSTATION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | NAMTHANG MANEYDARA | YES | TANGIBLE | Completed | |
29 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-5-47-3737 | UPGRADATION OF EXISTING 10KVA SUBSTATION TO 25 KVA SUBSTATION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | KATENG PAMPHOK | YES | TANGIBLE | Completed | |
30 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-5-47-3739 | UPGRADATION OF EXISTING 10KVA SUBSTATION TO 25 KVA SUBSTATION | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | TURUNG MAMRING | YES | TANGIBLE | Completed | |
31 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-5-47-3740 | 25 KVA STATION AT SAMARDONG WITH STRENGTHENING OF STREET LIGHTS AT NAMTHANG | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | NAGI KAREK, NAMTHANG MANEYDARA | YES | TANGIBLE | Completed | |
32 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-6-56-3743 | CONSTRUCTION OF 9 MTR SPAN RCC FOOT BRIDGE AT UPPER PAMPHOK | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION OF BRIDGE FOR INTER VILLAGE CONNECTIVITY | KATENG PAMPHOK | YES | TANGIBLE | Completed | |
33 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-6-56-3753 | CONSTRUCTION OF 9.1 M STEEL BRIDGE OVER SIKTUKHOLA - MIDDLE CHUUBA | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION OF BRIDGE FOR INTER VILLAGE CONNECTIVITY | CHUBA PHONG | YES | TANGIBLE | Completed | |
34 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-6-56-3755 | CONST OF 31 MTR SUSPENSION FOOT BRIDGE OVER SETIKHOLA-PALITAM | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION OF BRIDGE FOR INTER VILLAGE CONNECTIVITY | NAMTHANG MANEYDARA | YES | TANGIBLE | Completed | |
35 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-6-59-3745 | CONSTRUCTION OF JEEPABLE ROAD FROM SUNTOLEY ZERO TO SUNIM KHOR | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | TURUNG MAMRING | YES | TANGIBLE | Completed | |
36 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-6-59-3750 | CONSTRUCTION OF ROAD FROM RUCHUNG TO TANGZI | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | NAGI KAREK | YES | TANGIBLE | Completed | |
37 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-6-59-3759 | SURFACE STRENGTHENING AND IMPROVEMENT OF RIDING QUALITY ALONG PHONG MARING RD | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | CHUBA PHONG, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | TANGIBLE | Completed | |
38 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-9-79-3980 | TRAINING OF 70 YOUTH ON DRIVER CUM GUIDE. | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | INTANGIBLE | Completed | |
39 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-9-79-3981 | TRAINING OF 50 YOUTH ON FOOD & BEVERAGES SEVICES AND FRONT OFFICE CUM RECEPTIONIST | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | INTANGIBLE | Completed | |
40 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-9-79-3984 | TRAINING OF 50 YOUTH ON BEAUTY PARLOUR AND SPA | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | INTANGIBLE | Completed | |
41 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-9-79-3986 | TRAINING ON MASONRY AND JUNIOR HERITAGE MISTRI | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | INTANGIBLE | Completed | |
42 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-9-79-3989 | TRAINING OF DAIRY MANAGEMENT | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | INTANGIBLE | Completed | |
43 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-9-79-3991 | TRAINING OF POULTRY MANAGEMENT | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | INTANGIBLE | Completed | --- |
44 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-9-79-3993 | TRAINING ON ORGANIC FARMING ( 10 BATCHES) | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | INTANGIBLE | Completed | |
45 | SIKKIM | SOUTH DISTRICT | NAMTHANG RURBAN CLUSTER | W-206-9-79-3995 | TRAINING ON BEDSIDE ASSISTANT, HOSPITALITY ASSITANT, CABIN CREW AND FOOD & BEVERAGES SERVICES | SKILL DEVELOPMENT TRAINING LINKED TO ECONOMIC ACTIVITIES | SKILL DEVELOPMENT ACTIVITIES LINKED TO SELF EMPLOYMENT | CHUBA PHONG, KATENG PAMPHOK, NAGI KAREK, NAMTHANG MANEYDARA, TURUNG MAMRING | YES | INTANGIBLE | Completed |