Geo Taged Work Details
WORK CODE
W-173-1-8-85693
WORK NAME
INSTALATION OF HH TAP CONECTIONS 648
STATE
TELANGANA
CLUSTER
SULTHANABAD
COMPONENT
PIPED WATER SUPPLY
SUBCOMPONENT
OVER HEAD TANK UPGRADATION AND CONSTRUCTION
GP
CHINAKALVALA,
LAT:   
18.5458996
LONG:    
79.3252278
STATUS:    
Completed
UPLOADED BY:   
DLNA Peddapalli
GP NAME:   
CHINAKALVALA
CAPTURED TIME:   
2021-06-02 07:39:33
UPLOADED TIME:   
2021-06-02 07:39:39
DESCRIPTION:   
.
LAT:   
18.5459021
LONG:    
79.3252256
STATUS:    
Ongoing
UPLOADED BY:   
DLNA Peddapalli
GP NAME:   
CHINAKALVALA
CAPTURED TIME:   
2021-06-02 07:39:01
UPLOADED TIME:   
2021-06-02 07:39:06
DESCRIPTION:   
.
LAT:   
18.5459021
LONG:    
79.3252256
STATUS:    
Ongoing
UPLOADED BY:   
DLNA Peddapalli
GP NAME:   
CHINAKALVALA
CAPTURED TIME:   
2021-06-02 07:39:12
UPLOADED TIME:   
2021-06-02 07:39:18
DESCRIPTION:   
.