Geo Taged Work Details
WORK CODE
W-173-1-8-85723
WORK NAME
INSTALATION OF HH TAP CONECTIONS 648
STATE
TELANGANA
CLUSTER
SULTHANABAD
COMPONENT
PIPED WATER SUPPLY
SUBCOMPONENT
OVER HEAD TANK UPGRADATION AND CONSTRUCTION
GP
KANUKULA,
LAT:   
18.5458762
LONG:    
79.3252103
STATUS:    
Completed
UPLOADED BY:   
DLNA Peddapalli
GP NAME:   
KANUKULA
CAPTURED TIME:   
2021-06-02 07:43:07
UPLOADED TIME:   
2021-06-02 07:43:12
DESCRIPTION:   
.
LAT:   
18.5458657
LONG:    
79.3252105
STATUS:    
Ongoing
UPLOADED BY:   
DLNA Peddapalli
GP NAME:   
KANUKULA
CAPTURED TIME:   
2021-06-02 07:42:45
UPLOADED TIME:   
2021-06-02 07:42:49
DESCRIPTION:   
.