Geo Taged Work Details
WORK CODE
W-125-1-4-86587
WORK NAME
LAYING OF OPTIC FIBER CABLES ALONG WITH THE NEW PIPE LINES
STATE
TELANGANA
CLUSTER
KONDABHEEMANAPALLY
COMPONENT
PIPED WATER SUPPLY
SUBCOMPONENT
EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE
GP
GAZINAGAR,
LAT:   
17.0387877
LONG:    
79.296079
STATUS:    
Ongoing
UPLOADED BY:   
DLNA NALGONDA
GP NAME:   
Gazinagar
CAPTURED TIME:   
2021-03-05 16:25:23
UPLOADED TIME:   
2021-03-05 16:25:27
DESCRIPTION:   
optical fibre cable
LAT:   
17.0388023
LONG:    
79.2961407
STATUS:    
Completed
UPLOADED BY:   
DLNA NALGONDA
GP NAME:   
Gazinagar
CAPTURED TIME:   
2021-03-05 16:25:51
UPLOADED TIME:   
2021-03-05 16:25:56
DESCRIPTION:   
optical fibre cable
LAT:   
17.0387874
LONG:    
79.296087
STATUS:    
Ongoing
UPLOADED BY:   
DLNA NALGONDA
GP NAME:   
Gazinagar
CAPTURED TIME:   
2021-03-11 13:48:25
UPLOADED TIME:   
2021-03-11 13:48:32
DESCRIPTION:   
fibar cable
LAT:   
17.0386799
LONG:    
79.2960775
STATUS:    
Completed
UPLOADED BY:   
DLNA NALGONDA
GP NAME:   
Gazinagar
CAPTURED TIME:   
2021-03-11 13:49:05
UPLOADED TIME:   
2021-03-11 13:49:10
DESCRIPTION:   
fibar cable