Geo Taged Work Details
WORK CODE
W-173-1-8-85762
WORK NAME
INSTALATION OF HH TAP CONECTIONS 669
STATE
TELANGANA
CLUSTER
SULTHANABAD
COMPONENT
PIPED WATER SUPPLY
SUBCOMPONENT
OVER HEAD TANK UPGRADATION AND CONSTRUCTION
GP
SULTHANABAD,
LAT:   
18.5458575
LONG:    
79.3252996
STATUS:    
Completed
UPLOADED BY:   
DLNA Peddapalli
GP NAME:   
SULTHANABAD
CAPTURED TIME:   
2021-06-02 07:46:31
UPLOADED TIME:   
2021-06-02 07:46:45
DESCRIPTION:   
.
LAT:   
18.5458888
LONG:    
79.3252098
STATUS:    
Ongoing
UPLOADED BY:   
DLNA Peddapalli
GP NAME:   
SULTHANABAD
CAPTURED TIME:   
2021-06-02 07:45:47
UPLOADED TIME:   
2021-06-02 07:46:02
DESCRIPTION:   
.
LAT:   
18.5458575
LONG:    
79.3252996
STATUS:    
Completed
UPLOADED BY:   
DLNA Peddapalli
GP NAME:   
SULTHANABAD
CAPTURED TIME:   
2021-06-02 07:46:40
UPLOADED TIME:   
2021-06-02 07:46:54
DESCRIPTION:   
.