Geo Taged Work Details
WORK CODE
W-173-1-8-85702
WORK NAME
INSTALATION OF HH TAP CONECTIONS 648
STATE
TELANGANA
CLUSTER
SULTHANABAD
COMPONENT
PIPED WATER SUPPLY
SUBCOMPONENT
OVER HEAD TANK UPGRADATION AND CONSTRUCTION
GP
GATTEPALLI,
LAT:   
18.5024615
LONG:    
79.376936
STATUS:    
Completed
UPLOADED BY:   
DLNA Peddapalli
GP NAME:   
GATTEPALLI
CAPTURED TIME:   
2021-05-30 08:24:42
UPLOADED TIME:   
2021-05-30 08:24:43
DESCRIPTION:   
.
LAT:   
18.5024046
LONG:    
79.37699
STATUS:    
Ongoing
UPLOADED BY:   
DLNA Peddapalli
GP NAME:   
GATTEPALLI
CAPTURED TIME:   
2021-05-30 08:24:13
UPLOADED TIME:   
2021-05-30 08:24:14
DESCRIPTION:   
.