Geo Taged Work Details
WORK CODE
W-214-5-53-73143
WORK NAME
INSTALLATION OF LED LIGHTS
STATE
HARYANA
CLUSTER
MULLANA
COMPONENT
VILLAGE STREET LIGHTS AND ELECTRIFICATION
SUBCOMPONENT
INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS
GP
UGALA,
LAT:   
30.1887747
LONG:    
76.9777965
STATUS:    
Completed
UPLOADED BY:   
Sh Anurag Dhalia HCS
GP NAME:   
UGALA
CAPTURED TIME:   
2021-11-23 13:52:05
UPLOADED TIME:   
2021-11-23 13:52:07
DESCRIPTION:   
installation of led lights at Ugala
LAT:   
30.1879148
LONG:    
76.9776754
STATUS:    
Ongoing
UPLOADED BY:   
Sh Anurag Dhalia HCS
GP NAME:   
UGALA
CAPTURED TIME:   
2020-12-23 14:02:14
UPLOADED TIME:   
2020-12-23 14:02:16
DESCRIPTION:   
LED light at ugala
LAT:   
30.1909469
LONG:    
76.9778706
STATUS:    
Ongoing
UPLOADED BY:   
Sh Anurag Dhalia HCS
GP NAME:   
UGALA
CAPTURED TIME:   
2021-02-18 12:10:24
UPLOADED TIME:   
2021-02-18 12:10:28
DESCRIPTION:   
Installation of LED lights,Ugala