Geo Taged Work Details
WORK CODE
W-172-5-53-65672
WORK NAME
INSTALLATION OF 3 KWP GRID CONNECTED SOLAR POWER SYSTEM TO ZPHS
STATE
TELANGANA
CLUSTER
RYAKAL
COMPONENT
VILLAGE STREET LIGHTS AND ELECTRIFICATION
SUBCOMPONENT
INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS
GP
RYAKAL,
LAT:   
18.0844514
LONG:    
77.7556027
STATUS:    
Completed
UPLOADED BY:   
DLNA Sangareddy
GP NAME:   
RYAKAL
CAPTURED TIME:   
2020-11-06 13:34:07
UPLOADED TIME:   
2020-11-06 14:28:52
DESCRIPTION:   
ryakal
LAT:   
18.0845038
LONG:    
77.7556205
STATUS:    
Ongoing
UPLOADED BY:   
DLNA Sangareddy
GP NAME:   
RYAKAL
CAPTURED TIME:   
2020-11-06 13:33:48
UPLOADED TIME:   
2020-11-06 14:28:47
DESCRIPTION:   
ryakal