Geo Taged Work Details | |||||
---|---|---|---|---|---|
WORK CODE | W-399-6-59-71949 | WORK NAME | PROPOSED LENGTH OF NON CONNECTIVITY BETWEEN GPS BODHEGAON TO HATGAON ROAD VIA DOIFODE VASTI | STATE | MAHARASHTRA |
CLUSTER | BODHEGAON | COMPONENT | INTER VILLAGE ROADS CONNECTIVITY | SUBCOMPONENT | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN |
GP | BODHEGAON, |