1 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54089 | CO UTHAU DRINKING WATER SCHEME FROM SAINJ KHAD TO VILLAGE HEERANAGAR HATNIDHAR | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | BAICHERI | YES | TANGIBLE | Completed | |
2 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54093 | CHANGE AND LAYING OF NEW PIPELINE FROM MAIN TANK GHAROG TO KAMALA VILLAGE | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | GANEOG (NEHRA) | YES | TANGIBLE | Completed | |
3 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54094 | CHANGE AND LAYING OF NEW PIPELINE FROM VILLAGE BHUKHO TO VILLAGE NAITI BHAIKHAL | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | GANEOG (NEHRA) | YES | TANGIBLE | Completed | |
4 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54096 | CHANGE AND LAYING PIPELINE TO SHALTU TANK | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | GANEOG (NEHRA) | YES | TANGIBLE | Completed | |
5 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54097 | CO OF PIPELINE FROM VILLAGE BYCHEDI STORAGE TANK TO DHARATH | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | BAICHERI | YES | TANGIBLE | Completed | |
6 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54098 | CO OF PIPELINE FROM VILLAGE FATNECHI BOTLU NALA TO VILLAGE FATNECHI VILLAGE | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | BAICHERI | YES | TANGIBLE | Completed | |
7 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54102 | GWSS GURSHALLI SH PL OF GI PIPES OF VARIOUS DIA | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | TOTU (MAJTHAI) | YES | TANGIBLE | Completed | |
8 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54104 | LAYING DRINKING WATER PIPELINE TO CHYAWAN VILLAGE | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | GANEOG (NEHRA) | YES | TANGIBLE | Completed | |
9 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54107 | LAYING NEW PIPELINE TO SANGTI SANGOH SCHOOL | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | NERI | YES | TANGIBLE | Completed | |
10 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54108 | LAYING OF PIPE LINE FROM STORAGE TANK MATAIN NALLAH TO VILLAGE MATAIN IN GP CHAILLY | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | CHAILY | YES | TANGIBLE | Completed | |
11 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54109 | LAYING OF FEEDER PIPE FROM SOURCE AT DHAR NALLAHA TO STORAGE TANK AT VILLAGE DHAR | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | SHAKRAH | YES | TANGIBLE | Completed | |
12 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54112 | LAYING PIPE FROM DAINDA TANK TO VILLAGE KYAR | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | CHAILY | YES | TANGIBLE | Completed | |
13 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54114 | LAYING PIPELINE TO VILLAGE JUBBAR CHAWON | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | GANEOG (NEHRA) | YES | TANGIBLE | Completed | |
14 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54117 | LINKING OF GOVT DEGREE COLLEGE 16 MEEL FROM STORAGE TANK AT GHANDAL | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | SHAKRAH | YES | TANGIBLE | Completed | |
15 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54120 | LINKING OF GWSS SHANOL FROM STORAGE TANK TO KUFRIDHAR | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | GHANAHATTI | YES | TANGIBLE | Completed | |
16 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54121 | LINKING OF LWSS TOTU MAJTHAI IN TEHSIL AND DISTTSHIMLA SH PL OF GI PIPE OF VARIOUS DIA | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | TOTU (MAJTHAI) | YES | TANGIBLE | Completed | |
17 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-4-54122 | LINKING OF VILLAGE JHUNDLA FROM STORAGE TANK GHAROG | PIPED WATER SUPPLY | EXTENSION/UPGRADATION OF WATER SUPPLY PIPELINE | SHAKRAH | YES | TANGIBLE | Completed | |
18 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-8-54099 | CO TANK AT VILLAGE PADECH 50000 LETERS AND LAYING OF PIPELINE ETC TO VILLAGE DAFOUG AND BADERA | PIPED WATER SUPPLY | OVER HEAD TANK UPGRADATION AND CONSTRUCTION | GHANAHATTI | YES | TANGIBLE | Completed | |
19 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-8-54126 | CO STORAGE DRINKING TANK OF 20000 LTRS AT GWSS DHAR | PIPED WATER SUPPLY | OVER HEAD TANK UPGRADATION AND CONSTRUCTION | SHAKRAH | YES | TANGIBLE | Completed | |
20 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-1-8-54127 | CO STORAGE TANK 50000 LTR AT GHANDAL | PIPED WATER SUPPLY | OVER HEAD TANK UPGRADATION AND CONSTRUCTION | SHAKRAH | YES | TANGIBLE | Completed | |
21 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-10-159-53697 | PROVIDING OF MACHINERY AND EQUIPMENT IN VETERINARY DISPENSARY SERI | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | VETERINARY BUILDING/DISPENSARY CONSTRUCTION/UPGRADATION | NERI | YES | TANGIBLE | Completed | |
22 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-10-159-53698 | PROVIDING OF MACHINERY AND EQUIPMENT IN VETERINARY DISPENSARY NEHRA | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | VETERINARY BUILDING/DISPENSARY CONSTRUCTION/UPGRADATION | GANEOG (NEHRA) | YES | TANGIBLE | Completed | |
23 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-10-159-53699 | PROVIDING OF MACHINERY AND EQUIPMENT IN VETERINARY DISPENSARY SAKRAH | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | VETERINARY BUILDING/DISPENSARY CONSTRUCTION/UPGRADATION | SHAKRAH | YES | TANGIBLE | Completed | |
24 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-10-159-53700 | PROVIDING OF MACHINERY AND EQUIPMENT IN VETERINARY DISPENSARY CHAILI | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | VETERINARY BUILDING/DISPENSARY CONSTRUCTION/UPGRADATION | CHAILY | YES | TANGIBLE | Completed | |
25 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-10-159-53701 | PROVIDING OF MACHINERY AND EQUIPMENT IN VETERINARY DISPENSARY CHEWLA | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | VETERINARY BUILDING/DISPENSARY CONSTRUCTION/UPGRADATION | NERI | YES | TANGIBLE | Completed | |
26 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-10-159-53702 | PROVIDING OF MACHINERY AND EQUIPMENT IN VETERINARY DISPENSARY MAJHTHAI | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | VETERINARY BUILDING/DISPENSARY CONSTRUCTION/UPGRADATION | TOTU (MAJTHAI) | YES | TANGIBLE | Completed | |
27 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-10-159-53703 | PROVIDING OF MACHINERY AND EQUIPMENT R IN VETERINARY DISPENSARY BYCHERI | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | VETERINARY BUILDING/DISPENSARY CONSTRUCTION/UPGRADATION | BAICHERI | YES | TANGIBLE | Completed | |
28 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-10-159-53704 | CO VETERINARY HOSPITAL AND PROVIDING OF PROVIDING OF UTILITY VEHICLE FOR ANIMAL BREEDING | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | VETERINARY BUILDING/DISPENSARY CONSTRUCTION/UPGRADATION | GHANAHATTI | YES | TANGIBLE | Completed | |
29 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-10-159-53705 | ORGANIZATION OF VETERINARY CAMPS 3 CAMPS PER GP AND 1 PER QUARTER | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | VETERINARY BUILDING/DISPENSARY CONSTRUCTION/UPGRADATION | BAICHERI, CHAILY, GANEOG (NEHRA), GHANAHATTI, NERI, SHAKRAH, TOTU (MAJTHAI) | YES | INTANGIBLE | Completed | |
30 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-10-88-53691 | TRAINING CAMPS 2 IN EACH GP | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | AGRICULTURE EQUIPMENT | BAICHERI, CHAILY, GANEOG (NEHRA), GHANAHATTI, NERI, SHAKRAH, TOTU (MAJTHAI) | YES | INTANGIBLE | Completed | |
31 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-10-98-53805 | CO CHECK DAM KANHOI DOCHI NALA GHANAHATTI NALA KUFRIDHAR NALA KANDECH NALA DAFWAG NALA ETC | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | CHECK DAM | GHANAHATTI | YES | TANGIBLE | Completed | |
32 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-10-98-53812 | CO OF CHECK DAM AT DABAL NALA | AGRI-SERVICES PROCESSING AND ALLIED ACTIVITIES | CHECK DAM | GANEOG (NEHRA) | YES | TANGIBLE | Completed | |
33 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-21-269-54297 | CO COMMUNITYCUMTRAINING CENTRE AT KUFRIDHAR | SOCIAL INFRASTRUCTURE | CONSTRUCTION/UPRADATION OF COMMUNITY/BANQUET HALL/PANCHAYAT GHAR | GANEOG (NEHRA) | YES | TANGIBLE | Completed | |
34 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-47-113487 | PROVIDING NEW DTR KATTI PATTI MANJALA GAON AND UP GRADATION OF DTR HALTI KI HATTI MANJALA GAON JABLOG | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | CHAILY | YES | TANGIBLE | Completed | |
35 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-47-54023 | CHANGE ALL THE OLD TRANSFORMERS AND ELECTRICITY POLES IN GP BYCHERI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | BAICHERI | YES | TANGIBLE | Completed | |
36 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-47-54031 | PROVIDING NEW DTR OF 63KVA IN VILLAGE NALAYAL AND ONE ADDITION NEW DTR AT VILLAGE KANDA | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | CHAILY | YES | TANGIBLE | Completed | |
37 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-47-54035 | PROVIDING NEW DTR AT VILLAGE CHAILY AND UPGRADATION OF DTR AT NERI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | NERI | YES | TANGIBLE | Completed | |
38 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-47-54044 | PROVIDING NEW DTR AT SHILLI BAGGRI HATHNI KI DHAR AND UP GRADATION OF DTR AT HATHNI KI DHAR SHILLI SERI KANDA AND REORGANIZATION OF LT LINE AT VILLAGE KANDA | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | TOTU (MAJTHAI) | YES | TANGIBLE | Completed | |
39 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-47-54047 | PROVIDING 1104KV 250 KVA TRANSFORMER AT DHANDA IIIRD STAGE | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | CHAILY | YES | TANGIBLE | Completed | |
40 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-47-54050 | CO NEW TRANSFORMER ALONG WITH HTLT LINE IN VILLAGE SHALTU AND MANDAP | VILLAGE STREET LIGHTS AND ELECTRIFICATION | AUGMENTATION/MAINTENANCE OF TRANSFORMERS | GANEOG (NEHRA) | YES | TANGIBLE | Completed | |
41 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-48-54066 | PROVIDING OF 11 KV HT LINE PROP 63KVA DRAB KA JUBBAD IN GP GHANAHATTI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTRA VILLAGE STREET LIGHT | GHANAHATTI | YES | TANGIBLE | Completed | |
42 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-49-54041 | PROVIDING OF 3 PHASE ELECTRICITY LINE TO VILLAGE RIHAI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | CHAILY | YES | TANGIBLE | Completed | |
43 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-49-54059 | PROVIDING AB CABLE 35C120 MM2 IN LD SYSTEM OF EXISTING 250 KV 1104LINE GHANAHATTII | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | GHANAHATTI | YES | TANGIBLE | Completed | |
44 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-49-54061 | PROVIDING AB CABLE 35C120 MM2 IN LD SYSTEM OF EXISTING 250 KV 1104LINE GHANAHATTIII | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | GHANAHATTI | YES | TANGIBLE | Completed | |
45 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-49-54068 | PROV LT EXTENSION FROM 630KVA 1104 KV GHANAHATTI IIIRD GHANAHATTI 1ST UNDER ESD DHAMI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | GHANAHATTI | YES | TANGIBLE | Completed | |
46 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-49-54070 | SHIFTING OF 3 PHASE LT OVER THE HOUSES AT VILLAGE GHAROG GP NEHARA | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ELECTRICITY LINES AND POLES / LAYING OF WIRE FOR INTER VILLAGE STREET LIGHT | GANEOG (NEHRA) | YES | TANGIBLE | Completed | |
47 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-52-54055 | PROV 63 KVA SSTN BAG KA NALLA ALONG WITH HT AND LT LINE UESD DHAMI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ESTABLISHMENT/MAINTENANCE OF SUBSTATION | GHANAHATTI | YES | TANGIBLE | Completed | |
48 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-52-54072 | PROVLT EXTENSION FROM 100KVA 1104 KV KUFRI DHAR AND 63 KVA PARECH UNDER ESD DHAMI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | ESTABLISHMENT/MAINTENANCE OF SUBSTATION | GHANAHATTI | YES | TANGIBLE | Completed | |
49 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-53-113484 | PROVIDING OF 15 NO OF STREET LIGHTS GSSS SUMMER HILL TO VILLAGE CHAILI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | CHAILY | YES | TANGIBLE | Completed | |
50 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-53-53815 | PROVIDING OF SOLAR LIGHT FROM NERI ROAD TO HOTEL GREEN VIEW SHIMLA | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | NERI | YES | TANGIBLE | Completed | |
51 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-53-53817 | PROVIDING OF SOLAR LIGHTS 50 NO AT ALL VILLAGES IN GP BYCHERI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | BAICHERI | YES | TANGIBLE | Completed | |
52 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-53-53818 | PROVIDING OF SOLAR LIGHTS FOR ALL THE VILLAGES OF GP CHAYALI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | CHAILY | YES | TANGIBLE | Completed | |
53 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-53-53819 | PROVIDING OF SOLAR LIGHTS FOR ALL THE VILLAGES OF GP SHAKRAH | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | SHAKRAH | YES | TANGIBLE | Completed | |
54 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-53-53820 | PROVIDING OF SOLAR LIGHTS FOR ALL THE VILLAGES OF GP NERI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | NERI | YES | TANGIBLE | Completed | |
55 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-53-53821 | PROVIDING OF SOLAR LIGHTS IN GP TOTU MAJTHAI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | TOTU (MAJTHAI) | YES | TANGIBLE | Completed | |
56 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-53-53822 | PROVIDING SOLAR LIGHTS FOR ALL THE WARDS IN GP GHANAHATTI | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | GHANAHATTI | YES | TANGIBLE | Completed | |
57 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-5-53-53823 | PROVIDING SOLAR LIGHTS IN GP GANEOG NEHRA | VILLAGE STREET LIGHTS AND ELECTRIFICATION | INSTALLATION OF SOLAR/LED/MAST LIGHTS ON STREETS | GANEOG (NEHRA) | YES | TANGIBLE | Completed | |
58 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-6-59-53829 | CO NEHRA SHALTU ROAD SH MT ON NEHRA SHALTU ROAD KM 000 TO 200 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | GANEOG (NEHRA) | YES | INTANGIBLE | Completed | |
59 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-6-59-53839 | METALING OF LINK ROAD BADHERI BAZAR | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | TOTU (MAJTHAI) | YES | TANGIBLE | Completed | |
60 | HIMACHAL PRADESH | SHIMLA | GHANNAHATI | W-352-6-59-53840 | METALING OF LINK ROAD FROM MAJHTHAI TO BHARYAL20 TO3300 | INTER VILLAGE ROADS CONNECTIVITY | CONSTRUCTION/UPGRADATION OF INTER VILLAGE ROADS (BT/INTERLOCKED/CC/BRICKED) WITH/WITHOUT DRAIN | TOTU (MAJTHAI) | YES | TANGIBLE | Completed | |