CONVERGENCE BASED ANALYTICAL REPORT WORK WISE

Sl. Cluster name Work Name GP Name Convergence Scheme Name Convergence FS Amount
(₹ in Lakh)
A
Convergence Expenditure Amount
(₹ in Lakh)
B
Convergence Expenditure Percentage
(%)
(B/A*100)
Completed Works
1 MURTUMA Const of 99 nos of farm ponds MURTUMMA MGNREGA 0.00 0.00 100.00 YES
2 MURTUMA Constrcution Cultural Mandap MURTUMMA 4thSFC 0.00 0.00 100.00 YES
3 MURTUMA Construction ad upgradation of inter village roads BHAMINI, MURTUMMA MGNREGA 0.00 0.00 100.00 YES
4 MURTUMA Construction of CC Drain BHAMINI, MURTUMMA 4thSFC 0.00 0.00 100.00 YES
5 MURTUMA Construction of IHHL BHAMINI Swachh Bharat Mission Grameen 0.00 0.00 100.00 YES
6 MURTUMA Construction of Mini Stadium BHAMINI, MURTUMMA 4thSFC 0.00 0.00 74.03 YES
7 MURTUMA Construction of storage tank for waste water out of drain BHAMINI, MURTUMMA Swachh Bharat Mission Grameen 0.00 0.00 100.00 NO
8 MURTUMA Provision of pipe water supply system BHAMINI, MURTUMMA RURAL WATER SUPPLY AND SANITATION 0.00 0.00 100.00 NO
9 MURTUMA Provision of pipe water supply with over head tank facility BHAMINI, MURTUMMA RURAL WATER SUPPLY AND SANITATION 0.00 0.00 100.00 YES
10 MURTUMA Upgradation of ANM centre MURTUMMA NATIONAL HEALTH MISSION 0.00 0.00 100.00 YES
11 MURTUMA Upgradation of school BHAMINI, MURTUMMA Sarva Shiksha Abhiyan 0.00 0.00 40.55 YES
Total 2479.46 2377.30 95.88 9