CONVERGENCE BASED ANALYTICAL REPORT WORK WISE

Sl. Cluster name Work Name GP Name Convergence Scheme Name Convergence FS Amount
(₹ in Lakh)
A
Convergence Expenditure Amount
(₹ in Lakh)
B
Convergence Expenditure Percentage
(%)
(B/A*100)
Completed Works
1 RANIPADA Const of Public Toilet at Bus Terminal Truck Terminal of Ankulapadar Narendrapur NARENDRAPUR 0.00 0.00 0.00 NO
2 RANIPADA Construction of Bridge KUMARANGASASANA GOPABANDHU GRAMEEN YOJNA 0.00 0.00 100.00 YES
3 RANIPADA Construction of CC Road BHETESWAR, KUMARANGASASANA, NARENDRAPUR, TUMURAPUT Pradhan Mantri Gram Sadak Yojana 0.00 0.00 100.00 YES
4 RANIPADA Construction of Check dam NARENDRAPUR Pradhan Mantri Krishi Sinchai Yojna 0.00 0.00 100.00 NO
5 RANIPADA Construction of drain BHETESWAR, KUMARANGASASANA, NARENDRAPUR, TUMURAPUT 14 FINANCE COMMISSION 0.00 0.00 100.00 YES
6 RANIPADA Individual household Level Latrine BHETESWAR, KUMARANGASASANA, NARENDRAPUR, TUMURAPUT Swachh Bharat Mission Grameen 0.00 0.00 100.00 YES
7 RANIPADA Individual households BHETESWAR, KUMARANGASASANA, NARENDRAPUR, TUMURAPUT PRADHAN MANTRI AWAS YOJNA 0.00 0.00 100.00 NO
8 RANIPADA Water Supply System BHETESWAR, KUMARANGASASANA, NARENDRAPUR, TUMURAPUT National Rural Drinking Water Programme 0.00 0.00 100.00 YES
Total 5617.69 5611.69 99.89 5