CONVERGENCE BASED ANALYTICAL REPORT WORK WISE

Sl. Cluster name Work Name GP Name Convergence Scheme Name Convergence FS Amount
(₹ in Lakh)
A
Convergence Expenditure Amount
(₹ in Lakh)
B
Convergence Expenditure Percentage
(%)
(B/A*100)
Completed Works
1 AMINI Kidu making unit AMINI 2.32 0.00 0.00 No
2 AMINI Septic Tank Cleaning AMINI Gram Panchayat Funds 3.97 0.00 0.00 No
3 AMINI construction of CC village roads to connect LPG Godown from beerampally to beach road at amini retaining wall near fiber factory retaining wall near LPG godown AMINI STATE FUND 26.74 0.00 0.00 Yes
4 AMINI Construction of Rain Water Harvesting structure 1 lakh capacity at SJMMGSS school AMINI STATE FUND 16.88 0.00 0.00 Yes
5 AMINI JB School upgradation Special Repair and maintenance Temporary cooking shed and cycle shed AMINI 18.35 0.00 0.00 Yes
6 AMINI Construction of Link road from beach road to main road near helipad road to helipad at amini AMINI STATE FUND 7.94 0.00 0.00 Yes
7 AMINI Construction of Rain water Harvesting structure 1 lakh capacity at JB School North AMINI STATE FUND 4.82 0.00 0.00 Yes
8 AMINI construction of ferro cement rain water harvesting structure 10000 ltr AMINI STATE FUND 79.40 0.00 0.00 No
9 AMINI Duck Farming at Amini AMINI Agriculture 0.00 0.00 0.00 No
10 AMINI Paper Bag Making Unit NS AMINI STATE FUND 7.00 0.00 0.00 Yes
11 AMINI Construction of full fledged stadium at amini SH Development of site Phase I Land filling retaining wall felling of trees AMINI STATE FUND 37.28 0.00 0.00 Yes
12 AMINI Augmentation of water supply system at amini SH providing water supply pipe line from NIOT site to various OH tank sump at amini AMINI STATE FUND 200.79 0.00 0.00 No
13 AMINI CONSTRUCTION AND RENOVATION OF TOILET AT SCHOOL AND SEPTIC TANK CLEANING AMINI STATE FUND 23.64 0.00 0.00 Yes
14 AMINI Coconut Harvesting AMINI 12.50 0.00 0.00 Yes
15 AMINI construction of senior secondary school at amini phase IV SH Block B 1 floor and II floor south and east wing and block A II floor west wing AMINI STATE FUND 438.71 0.00 0.00 Yes
16 AMINI Construction of 2 nos ground sump at NIOT site and Juma Masjid AMINI STATE FUND 7.79 0.00 0.00 No
17 AMINI Supply of Drinking water AMINI STATE FUND 5.00 0.00 0.00 Yes
Total 89313655.35 0.00 0.00 11